Installing air-conditioning units in Freigericht
Project diary
We were called in to help install air-conditioning units.
Our installation crew mounted the indoor ceiling cassettes in the correct positions and connected them.
Project profile
- Location: Freigericht (Main-Kinzig district)
- Scope: Indoor ceiling cassettes positioned to the ceiling grid and connected; rooms laser-measured in advance; units protected with film during construction
- Equipment: Laser measuring system
- Result: Every cassette in its exact grid position, with no measuring delays during installation


The challenge: matching the ceiling grid
Every ceiling cassette had to fit the suspended ceiling installed later and match the grid of the mineral-fibre ceiling tiles.
We therefore surveyed the rooms in advance with our laser measuring system and set out the exact positions. No time was lost on measuring during installation.
As the building was still under construction, we protected the units with film.
We keep your production running
Our service areas
Follow us on social media
Related guides for this project
Maintenance & Servicing
About the author
Tobias Schott
Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance
A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.