Cleaning conveyor drives by dry-ice blasting

Project diary

Cleaning with dry ice

We cleaned 25 complete drive stations, including all moving, mechanical and electrical components, by dry-ice blasting. The drives can now be maintained quickly and easily at regular intervals, and dirt and oil no longer build up.

Project profile

  • Client sector: Industrial plant with conveyor drives
  • Scope: 25 complete drive stations cleaned by dry-ice blasting with a partner company; maintenance and preparation for condition-monitoring sensors
  • Equipment: Dry-ice blasting unit, compressor, industrial vacuum cleaner
  • Result: Drives clean down to the last corner and easy to maintain at regular intervals
Dry ice blasting a drive

When we took on the job, we soon found that the drive stations had not been maintained for more than 20 years.

Apart from light cleaning, the essential work had not been done: the mechanical maintenance and lubrication that were long overdue.

The system was to stay in service for a few more years. We were asked to carry out the maintenance and install condition-monitoring equipment, and to prepare the drives so that sensors and new technology could be fitted. That first required a thorough clean.

Years of dust, dirt, wood and other production residue could not be removed with conventional cleaning agents – and the cost-benefit ratio quickly became doubtful.

Drive bearing before and after dry ice cleaning

Overview

Together with our partner company, we decided to clean the drives by dry-ice blasting. It is fast and efficient, and it is gentle on the equipment and the environment: nothing but dry ice and air is needed. The blast removed the caked-on contamination, oil and residue with little effort.

As the animated sequence shows, the work went quickly.

Dry-ice blasting also reaches the last corners. Residues such as oil freeze and crumble into a kind of dust that only needs vacuuming up. Afterwards the system is genuinely clean, and every corner is easy for maintenance staff to reach.

Few fitters enjoy reaching into machines that dirty, even if it is part of the job.

A clean, tidy machine changes that: maintenance staff are far more willing to look after it properly.

We install industrial equipment, and we also maintain and repair it. We keep our interventions in the client’s operations as short as possible.

Dry ice has clear advantages: attached parts such as motors and belts are not affected, so the process is very gentle. Our team exposed the drive and sensor technology again cleanly and without damage.

We keep your production running

Need help with a project? Call us on  +49 6106 239 25 88 or anfrage@omegamounting.de

Our service areas

Follow us on social media

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.

EnglishEnglish