{"name":"Omega Mounting GmbH","description":"","url":"https:\/\/omegamounting.de","home":"https:\/\/omegamounting.de\/en","gmt_offset":2,"timezone_string":"Europe\/Berlin","page_for_posts":331,"page_on_front":91,"show_on_front":"page","namespaces":["ithemes-security\/rpc","ithemes-security\/v1","oembed\/1.0","borlabs-cookie\/v1","jetpack\/v4","erecht24\/v1","omgf\/v1","redirection\/v1","webp-converter\/v1","yoast\/v1","elementor-mcp-composer\/v1.0.19","elementor-one\/v1","duplicate-post\/v1","elementor\/v1","elementor-pro\/v1","ea11y\/v1","backwpup\/v1","backwpup\/v2","elementor-hello-elementor\/v1","google-site-kit\/v1","elementor\/v1\/documents","elementor-ai\/v1","elementor\/v1\/feedback","wp-optimize\/v1\/onboarding","jetpack\/v4\/stats-app","wpcom\/v2","jetpack-boost\/v1","my-jetpack\/v1","jetpack\/v4\/explat","wpcom\/v3","mcp","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/omegamounting.de\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/batch\/v1"}]}},"\/ithemes-security\/rpc":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ithemes-security\/rpc","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc"}]}},"\/ithemes-security\/rpc\/global\/detect-ip":{"namespace":"ithemes-security\/rpc","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"proxy":{"type":"string","enum":["automatic","manual","disabled"],"required":true},"args":{"type":"object","default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc\/global\/detect-ip"}]}},"\/ithemes-security\/rpc\/notification-center\/notifications":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc\/notification-center\/notifications"}]}},"\/ithemes-security\/rpc\/notification-center\/available-users-roles":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc\/notification-center\/available-users-roles"}]}},"\/ithemes-security\/rpc\/file-writing\/get-config-rules":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc\/file-writing\/get-config-rules"}]}},"\/ithemes-security\/v1":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ithemes-security\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1"}]}},"\/ithemes-security\/v1\/bans":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/bans"}]}},"\/ithemes-security\/v1\/modules":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"status":{"type":"string","enum":["active","inactive"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/modules"}]}},"\/ithemes-security\/v1\/modules\/(?P<id>[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"allow_batch":{"v1":true},"args":{"status":{"title":"Module Status","type":"object","properties":{"selected":{"type":"string","enum":["active","inactive"],"context":["view","edit","embed"]},"default":{"type":"string","enum":["always-active","default-active","default-inactive"],"context":["edit"],"readonly":true}},"required":false},"tools":{"title":"Module Tools","type":"object","additionalProperties":{"type":"object"},"required":false}}}]},"\/ithemes-security\/v1\/settings":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"modules":{"oneOf":[{"type":"string","enum":[":all",":active"]},{"type":"array","items":{"type":"string"}}],"default":":all","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/settings"}]}},"\/ithemes-security\/v1\/settings\/(?P<id>[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["PUT"],"allow_batch":{"v1":true},"args":[]},{"methods":["PATCH"],"allow_batch":{"v1":true},"args":[]},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":[]}]},"\/ithemes-security\/v1\/site-types":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/site-types"}]}},"\/ithemes-security\/v1\/site-types\/(?P<id>[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":{"answers":{"description":"The list of answers.","type":"array","items":{"type":"object","properties":{"question":{"description":"The question id.","type":"string"},"answer":{"description":"The user provided answer.","type":["array","object","boolean","number","integer","string"]},"modules":{"type":"array","readonly":true,"items":{"type":"string"}},"disabled":{"type":"array","readonly":true,"items":{"type":"string"}},"settings":{"type":"object","readonly":true},"user_groups":{"type":"array","readonly":true,"items":{"type":"object"}},"user_groups_settings":{"type":"object","readonly":true,"additionalProperties":{"type":"object"}},"canonical_group_substitutions":{"type":"object","readonly":true,"additionalProperties":{"type":"string"}}}},"required":false}}}]},"\/ithemes-security\/v1\/tools":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/tools"}]}},"\/ithemes-security\/v1\/tools\/(?P<tool>[\\w\\-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":{"enabled":{"type":"boolean","required":false}}},{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/user-actions":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"users":{"type":"array","items":{"type":"integer"},"required":false},"query":{"type":"object","properties":[],"required":false},"actions":{"type":"object","properties":{"force-logout":{"type":"boolean","enum":[true]},"reset-password":{"type":"boolean","enum":[true]},"add-user-groups":{"type":"array","items":{"type":"string","format":"uuid"}}},"additionalProperties":false,"minProperties":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/user-actions"}]}},"\/ithemes-security\/v1\/logs":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"before":{"type":"string","format":"date-time","required":false},"after":{"type":"string","format":"date-time","required":false},"module":{"type":"array","items":{"type":"string"},"required":false},"code":{"type":"array","items":{"type":"string"},"required":false},"type":{"type":"array","items":{"type":"string","oneOf":[{"enum":["critical-issue"],"title":"Critical Issue"},{"enum":["action"],"title":"Action"},{"enum":["fatal"],"title":"Fatal Error"},{"enum":["error"],"title":"Error"},{"enum":["warning"],"title":"Warning"},{"enum":["notice"],"title":"Notice"},{"enum":["debug"],"title":"Debug"},{"enum":["process-start"],"title":"Process"},{"enum":["process-update"],"title":"Process Update"},{"enum":["process-stop"],"title":"Process Stop"}]},"required":false},"user":{"type":"array","items":{"type":"integer"},"required":false},"ip":{"type":"array","items":{"type":"string","format":"ip"},"required":false},"order":{"type":"string","enum":["asc","desc"],"default":"desc","required":false},"orderby":{"type":"string","enum":["created_at","id","module","code","type","request_started_at","user","site"],"default":"created_at","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/logs"}]}},"\/ithemes-security\/v1\/logs\/(?P<id>[\\d]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/geolocate\/(?P<ip>.+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ip":{"type":"string","format":"ip","required":false}}}]},"\/ithemes-security\/rpc\/lockout-stats\/top-blocked-ips":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"default":"30-days","oneOf":[{"type":"object","additionalProperties":false,"properties":{"start":{"type":"string","format":"date-time","required":true},"end":{"type":"string","format":"date-time","required":true}}},{"type":"string","enum":["24-hours","week","30-days"]}],"required":false},"number":{"type":"integer","minimum":0,"maximum":10,"default":5,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc\/lockout-stats\/top-blocked-ips"}]}},"\/ithemes-security\/v1\/lockouts":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/lockouts"}]}},"\/ithemes-security\/v1\/lockouts\/(?P<id>[\\d]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/lockouts\/(?P<id>[\\d]+)\/release-lockout":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/lockouts\/(?P<id>[\\d]+)\/ban-lockout":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/rpc\/discover":{"namespace":"ithemes-security\/rpc","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"url":{"type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/rpc\/discover"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/oembed\/1.0\/proxy"}]}},"\/borlabs-cookie\/v1":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"borlabs-cookie\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1"}]}},"\/borlabs-cookie\/v1\/test\/authorization":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/test\/authorization"}]}},"\/borlabs-cookie\/v1\/cloud-scan":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/cloud-scan"}]}},"\/borlabs-cookie\/v1\/cloud-scan\/(?P<scanId>[0-9]{1,})":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/borlabs-cookie\/v1\/cloud-scan\/suggested-packages\/(?P<scanId>[0-9]{1,})":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/borlabs-cookie\/v1\/consent\/log":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/consent\/log"}]}},"\/borlabs-cookie\/v1\/consent\/history":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/consent\/history"}]}},"\/borlabs-cookie\/v1\/consent\/statistic":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/consent\/statistic"}]}},"\/borlabs-cookie\/v1\/dialog\/visibility":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/dialog\/visibility"}]}},"\/borlabs-cookie\/v1\/download\/geo-ip-database":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/download\/geo-ip-database"}]}},"\/borlabs-cookie\/v1\/download\/iab-tcf-gvl":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/download\/iab-tcf-gvl"}]}},"\/borlabs-cookie\/v1\/download\/page-selection-keyword-list":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/download\/page-selection-keyword-list"}]}},"\/borlabs-cookie\/v1\/setup-assistant\/legal-pages-detection":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/setup-assistant\/legal-pages-detection"}]}},"\/borlabs-cookie\/v1\/package\/install\/(?P<id>\\d+)":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true}}}]},"\/borlabs-cookie\/v1\/package\/post-install":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/package\/post-install"}]}},"\/borlabs-cookie\/v1\/scan":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/scan"}]}},"\/borlabs-cookie\/v1\/scan-request":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/scan-request"}]}},"\/borlabs-cookie\/v1\/scan-result\/(?P<scanRequestId>[a-zA-Z]{12})":{"namespace":"borlabs-cookie\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/borlabs-cookie\/v1\/setup-assistant\/finalize":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/setup-assistant\/finalize"}]}},"\/borlabs-cookie\/v1\/setup-assistant\/generate-files":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/setup-assistant\/generate-files"}]}},"\/borlabs-cookie\/v1\/test":{"namespace":"borlabs-cookie\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/borlabs-cookie\/v1\/test"}]}},"\/jetpack\/v4":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack\/v4","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4"}]}},"\/jetpack\/v4\/backup-helper-script":{"namespace":"jetpack\/v4","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"helper":{"description":"base64 encoded Backup Helper Script body.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"path":{"description":"Path to Backup Helper Script","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/backup-helper-script"}]}},"\/jetpack\/v4\/database-object\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"object_type":{"description":"Type of object to fetch from the database","required":true},"object_id":{"description":"ID of the database object to fetch","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/database-object\/backup"}]}},"\/jetpack\/v4\/options\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"One or more option names to include in the backup","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/options\/backup"}]}},"\/jetpack\/v4\/comments\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/posts\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/terms\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/users\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/site\/backup\/undo-event":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/backup\/undo-event"}]}},"\/jetpack\/v4\/orders\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/site\/backup\/preflight":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/backup\/preflight"}]}},"\/erecht24\/v1":{"namespace":"erecht24\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"erecht24\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/erecht24\/v1"}]}},"\/omgf\/v1":{"namespace":"omgf\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"omgf\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/omgf\/v1"}]}},"\/omgf\/v1\/adminbar-menu\/status":{"namespace":"omgf\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/omgf\/v1\/adminbar-menu\/status"}]}},"\/omgf\/v1\/dashboard\/dismiss-notice":{"namespace":"omgf\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/omgf\/v1\/dashboard\/dismiss-notice"}]}},"\/omgf\/v1\/dashboard\/dismiss-download-failures":{"namespace":"omgf\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/omgf\/v1\/dashboard\/dismiss-download-failures"}]}},"\/jetpack\/v4\/jetpack-ai-jwt":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/jetpack-ai-jwt"}]}},"\/jetpack\/v4\/plans":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/plans"}]}},"\/jetpack\/v4\/products":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/products"}]}},"\/jetpack\/v4\/marketing\/survey":{"namespace":"jetpack\/v4","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/marketing\/survey"}]}},"\/jetpack\/v4\/rewind":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/rewind"}]}},"\/jetpack\/v4\/scan":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/scan"}]}},"\/jetpack\/v4\/connection\/url":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"from":{"type":"string","required":false},"redirect":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/url"}]}},"\/jetpack\/v4\/tracking\/settings":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"tracks_opt_out":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/tracking\/settings"}]}},"\/jetpack\/v4\/site":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site"}]}},"\/jetpack\/v4\/site\/features":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/features"}]}},"\/jetpack\/v4\/site\/products":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/products"}]}},"\/jetpack\/v4\/site\/purchases":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/purchases"}]}},"\/jetpack\/v4\/site\/benefits":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/benefits"}]}},"\/jetpack\/v4\/site\/activity":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/activity"}]}},"\/jetpack\/v4\/module\/all":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/module\/all"}]}},"\/jetpack\/v4\/module\/all\/active":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"modules":{"default":"","type":"array","items":{"type":"string"},"required":true},"active":{"default":true,"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/module\/all\/active"}]}},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"context":{"default":"edit","required":false},"jetpack_blocks_disabled":{"description":"Jetpack Blocks disabled.","type":"boolean","default":false,"required":false},"carousel_background_color":{"description":"Colour scheme.","type":"string","default":"black","enum":["black","white"],"required":false},"carousel_display_exif":{"description":"Show photo metadata (<a href=\"https:\/\/en.wikipedia.org\/wiki\/Exchangeable_image_file_format\" target=\"_blank\">Exif<\/a>) in carousel, when available.","type":"boolean","default":0,"required":false},"carousel_display_comments":{"description":"Show comments area in carousel","type":"boolean","default":1,"required":false},"highlander_comment_form_prompt":{"description":"Greeting Text","type":"string","default":"Leave a Reply","required":false},"jetpack_comment_form_color_scheme":{"description":"Colour scheme","type":"string","default":"light","enum":["light","dark","transparent"],"required":false},"jetpack_portfolio":{"description":"Enable or disable Jetpack portfolio post type.","type":"boolean","default":0,"required":false},"jetpack_portfolio_posts_per_page":{"description":"Number of entries to show at most on Portfolio pages.","type":"integer","default":10,"required":false},"jetpack_testimonial":{"description":"Enable or disable Jetpack testimonial post type.","type":"boolean","default":0,"required":false},"jetpack_testimonial_posts_per_page":{"description":"Number of entries to show at most on Testimonial pages.","type":"integer","default":10,"required":false},"jetpack_waf_automatic_rules":{"description":"Enable automatic rules - Protect your site against untrusted traffic sources with automatic security rules.","type":"boolean","default":false,"required":false},"jetpack_waf_ip_block_list_enabled":{"description":"Block list - Block a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_block_list":{"description":"Blocked IP addresses","type":"string","default":"","required":false},"jetpack_waf_ip_allow_list_enabled":{"description":"Allow list - Allow a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_allow_list":{"description":"Always allowed IP addresses","type":"string","default":"","required":false},"jetpack_waf_share_data":{"description":"Share basic data with Jetpack.","type":"boolean","default":0,"required":false},"jetpack_waf_share_debug_data":{"description":"Share detailed data with Jetpack.","type":"boolean","default":0,"required":false},"tiled_galleries":{"description":"Display all your gallery pictures in a cool mosaic.","type":"boolean","default":0,"required":false},"gravatar_disable_hovercards":{"description":"View people&#039;s profiles when you mouse over their Gravatars","type":"string","default":"enabled","enum":["enabled","disabled"],"required":false},"infinite_scroll":{"description":"To infinity and beyond","type":"boolean","default":1,"required":false},"infinite_scroll_google_analytics":{"description":"Use Google Analytics with Infinite Scroll","type":"boolean","default":0,"required":false},"wpl_default":{"description":"WordPress.com Likes are","type":"string","default":"on","enum":["on","off"],"required":false},"social_notifications_like":{"description":"Send email notification when someone likes a post","type":"boolean","default":1,"required":false},"wpcom_publish_comments_with_markdown":{"description":"Use Markdown for comments.","type":"boolean","default":0,"required":false},"wpcom_publish_posts_with_markdown":{"description":"Use Markdown for posts.","type":"boolean","default":0,"required":false},"monitor_receive_notifications":{"description":"Receive Monitor Email Notifications.","type":"boolean","default":0,"required":false},"post_by_email_address":{"description":"Email Address","type":"string","default":"noop","enum":["noop","create","regenerate","delete"],"required":false},"jetpack_protect_key":{"description":"Protect API key","type":"string","default":"","required":false},"jetpack_protect_global_whitelist":{"description":"Protect global IP allow list","type":"string","default":"","required":false},"sharing_services":{"description":"Enabled Services and those hidden behind a button","type":"object","default":{"visible":["facebook","x"],"hidden":[]},"required":false},"button_style":{"description":"Button Style","type":"string","default":"icon","enum":["icon-text","icon","text","official"],"required":false},"sharing_label":{"description":"Sharing Label","type":"string","default":"","required":false},"show":{"description":"Views where buttons are shown","type":"array","items":{"type":"string"},"default":["post"],"required":false},"jetpack-twitter-cards-site-tag":{"description":"The Twitter username of the owner of this site&#039;s domain.","type":"string","default":"","required":false},"sharedaddy_disable_resources":{"description":"Disable CSS and JS","type":"boolean","default":0,"required":false},"custom":{"description":"Custom sharing services added by user.","type":"object","default":{"sharing_name":"","sharing_url":"","sharing_icon":""},"required":false},"sharing_delete_service":{"description":"Delete custom sharing service.","type":"string","default":"","required":false},"jetpack_sso_require_two_step":{"description":"Require Two-Step Authentication","type":"boolean","default":false,"required":false},"jetpack_sso_match_by_email":{"description":"Match by Email","type":"boolean","default":1,"required":false},"stb_enabled":{"description":"Show a &lt;em&gt;&#039;follow blog&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"stc_enabled":{"description":"Show a &lt;em&gt;&#039;follow comments&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"wpcom_newsletter_categories":{"description":"Array of post category ids that are marked as newsletter categories","type":"array","default":[],"required":false},"wpcom_newsletter_categories_enabled":{"description":"Whether the newsletter categories are enabled or not","type":"boolean","default":0,"required":false},"wpcom_newsletter_send_default":{"description":"Whether to send newsletter emails by default when publishing a post","type":"boolean","default":1,"required":false},"wpcom_featured_image_in_email":{"description":"Whether to include the featured image in the email or not","type":"boolean","default":0,"required":false},"jetpack_gravatar_in_email":{"description":"Whether to show author avatar in the email byline","type":"boolean","default":1,"required":false},"jetpack_author_in_email":{"description":"Whether to show author display name in the email byline","type":"boolean","default":1,"required":false},"jetpack_post_date_in_email":{"description":"Whether to show date in the email byline","type":"boolean","default":1,"required":false},"wpcom_subscription_emails_use_excerpt":{"description":"Whether to use the excerpt in the email or not","type":"boolean","default":0,"required":false},"jetpack_subscriptions_reply_to":{"description":"Reply to email behaviour for newsletters emails","type":"string","default":"comment","required":false},"jetpack_subscriptions_from_name":{"description":"From name for newsletters emails","type":"string","default":"","required":false},"sm_enabled":{"description":"Show popup Subscribe modal to readers.","type":"boolean","default":0,"required":false},"jetpack_subscribe_overlay_enabled":{"description":"Show subscribe overlay on homepage.","type":"boolean","default":0,"required":false},"jetpack_subscribe_floating_button_enabled":{"description":"Show a floating subscribe button.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_post_end_enabled":{"description":"Add Subscribe block at the end of each post.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_login_navigation_enabled":{"description":"Add Subscriber Login block to the navigation.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_navigation_enabled":{"description":"Add Subscribe block to the navigation.","type":"boolean","default":0,"required":false},"social_notifications_subscribe":{"description":"Send email notification when someone subscribes to my blog","type":"boolean","default":0,"required":false},"subscription_options":{"description":"Options used in subscription email templates and the Subscribe block: &#039;invitation&#039;, &#039;welcome&#039;, &#039;comment_follow&#039;, &#039;subscribe_modal_heading&#039;, &#039;free_tier_description&#039; and &#039;hide_free_tier&#039;.","type":"object","default":{"invitation":"","welcome":"","comment_follow":"","subscribe_modal_heading":"","free_tier_description":"","hide_free_tier":false},"required":false},"show_headline":{"description":"Highlight related content with a heading","type":"boolean","default":1,"required":false},"show_thumbnails":{"description":"Show a thumbnail image where available","type":"boolean","default":0,"required":false},"instant_search_enabled":{"description":"Enable Instant Search","type":"boolean","default":0,"required":false},"has_jetpack_search_product":{"description":"Has an active Jetpack Search product purchase","type":"boolean","default":0,"required":false},"search_auto_config":{"description":"Trigger an auto config of instant search","type":"boolean","default":0,"required":false},"google":{"description":"Google Search Console","type":"string","default":"","required":false},"bing":{"description":"Bing Webmaster Centre","type":"string","default":"","required":false},"pinterest":{"description":"Pinterest Site Verification","type":"string","default":"","required":false},"yandex":{"description":"Yandex Site Verification","type":"string","default":"","required":false},"facebook":{"description":"Facebook Domain Verification","type":"string","default":"","required":false},"enable_header_ad":{"description":"Display an ad unit at the top of each page.","type":"boolean","default":1,"required":false},"wordads_approved":{"description":"Is site approved for WordAds?","type":"boolean","default":0,"required":false},"wordads_second_belowpost":{"description":"Display second ad below post?","type":"boolean","default":1,"required":false},"wordads_inline_enabled":{"description":"Display inline ad within post content?","type":"boolean","default":1,"required":false},"wordads_display_front_page":{"description":"Display ads on the front page?","type":"boolean","default":1,"required":false},"wordads_display_post":{"description":"Display ads on posts?","type":"boolean","default":1,"required":false},"wordads_display_page":{"description":"Display ads on pages?","type":"boolean","default":1,"required":false},"wordads_display_archive":{"description":"Display ads on archive pages?","type":"boolean","default":1,"required":false},"wordads_custom_adstxt_enabled":{"description":"Custom ads.txt","type":"boolean","default":0,"required":false},"wordads_custom_adstxt":{"description":"Custom ads.txt entries","type":"string","default":"","required":false},"wordads_ccpa_enabled":{"description":"Enable support for the California Consumer Privacy Act","type":"boolean","default":0,"required":false},"wordads_ccpa_privacy_policy_url":{"description":"Privacy Policy URL","type":"string","default":"","required":false},"wordads_cmp_enabled":{"description":"Enable GDPR Consent Management Banner for WordAds","type":"boolean","default":0,"required":false},"google_analytics_tracking_id":{"description":"Google Analytics","type":"string","default":"","required":false},"jetpack_wga":{"description":"Google Analytics","type":"object","required":false},"admin_bar":{"description":"Include a small chart in your Admin Bar with a 48-hour traffic snapshot.","type":"boolean","default":1,"required":false},"enable_odyssey_stats":{"description":"Preview the new Jetpack Stats experience (Experimental).","type":"boolean","default":1,"required":false},"roles":{"description":"Select the roles that will be able to view stats reports.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"count_roles":{"description":"Count the page views of registered users who are logged in.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"blog_id":{"description":"Blog ID.","type":"boolean","default":0,"required":false},"do_not_track":{"description":"Do not track.","type":"boolean","default":1,"required":false},"version":{"description":"Version.","type":"integer","default":9,"required":false},"collapse_nudges":{"description":"Collapse upgrade nudges","type":"boolean","default":0,"required":false},"wpcom_reader_views_enabled":{"description":"Show post views in the WordPress.com Reader.","type":"boolean","default":1,"required":false},"akismet_show_user_comments_approved":{"description":"","type":"boolean","default":0,"required":false},"wordpress_api_key":{"description":"","type":"string","default":"","required":false},"dismiss_empty_stats_card":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_backup_getting_started":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_agencies_learn_more":{"description":"","type":"boolean","default":0,"required":false},"lang_id":{"description":"Primary language for the site.","type":"string","default":"en_US","required":false},"advanced_seo_front_page_description":{"description":"Front page meta description.","type":"string","default":"","required":false},"advanced_seo_title_formats":{"description":"SEO page title structures.","type":"object","default":{"archives":[],"front_page":[],"groups":[],"pages":[],"posts":[]},"required":false},"jetpack_seo_llms_txt_enabled":{"description":"Generate an llms.txt file to guide AI assistants around your content.","type":"boolean","default":0,"required":false},"jetpack_seo_ai_crawler_overrides":{"description":"AI crawler allow\/block overrides.","type":"object","default":[],"required":false},"videopress_private_enabled_for_site":{"description":"Video Privacy: Restrict views to members of this site","type":"boolean","default":0,"required":false},"ai_seo_enhancer_enabled":{"description":"Automatically generate SEO title, SEO description, and image alt text for new posts.","type":"boolean","default":0,"required":false},"account-protection":{"description":"","type":"boolean","default":0,"required":false},"blaze":{"description":"","type":"boolean","default":0,"required":false},"blocks":{"description":"","type":"boolean","default":0,"required":false},"canonical-urls":{"description":"","type":"boolean","default":0,"required":false},"carousel":{"description":"","type":"boolean","default":0,"required":false},"comment-likes":{"description":"","type":"boolean","default":0,"required":false},"comments":{"description":"","type":"boolean","default":0,"required":false},"contact-form":{"description":"","type":"boolean","default":0,"required":false},"copy-post":{"description":"","type":"boolean","default":0,"required":false},"custom-content-types":{"description":"","type":"boolean","default":0,"required":false},"google-fonts":{"description":"","type":"boolean","default":0,"required":false},"gravatar-hovercards":{"description":"","type":"boolean","default":0,"required":false},"infinite-scroll":{"description":"","type":"boolean","default":0,"required":false},"json-api":{"description":"","type":"boolean","default":0,"required":false},"latex":{"description":"","type":"boolean","default":0,"required":false},"likes":{"description":"","type":"boolean","default":0,"required":false},"markdown":{"description":"","type":"boolean","default":0,"required":false},"monitor":{"description":"","type":"boolean","default":0,"required":false},"notes":{"description":"","type":"boolean","default":0,"required":false},"photon-cdn":{"description":"","type":"boolean","default":0,"required":false},"photon":{"description":"","type":"boolean","default":0,"required":false},"podcast":{"description":"","type":"boolean","default":0,"required":false},"post-by-email":{"description":"","type":"boolean","default":0,"required":false},"post-list":{"description":"","type":"boolean","default":0,"required":false},"protect":{"description":"","type":"boolean","default":0,"required":false},"publicize":{"description":"","type":"boolean","default":0,"required":false},"related-posts":{"description":"","type":"boolean","default":0,"required":false},"search":{"description":"","type":"boolean","default":0,"required":false},"seo-tools":{"description":"","type":"boolean","default":0,"required":false},"sharedaddy":{"description":"","type":"boolean","default":0,"required":false},"shortcodes":{"description":"","type":"boolean","default":0,"required":false},"shortlinks":{"description":"","type":"boolean","default":0,"required":false},"sitemaps":{"description":"","type":"boolean","default":0,"required":false},"sso":{"description":"","type":"boolean","default":0,"required":false},"stats":{"description":"","type":"boolean","default":0,"required":false},"subscriptions":{"description":"","type":"boolean","default":0,"required":false},"tiled-gallery":{"description":"","type":"boolean","default":0,"required":false},"vaultpress":{"description":"","type":"boolean","default":0,"required":false},"verification-tools":{"description":"","type":"boolean","default":0,"required":false},"videopress":{"description":"","type":"boolean","default":0,"required":false},"waf":{"description":"","type":"boolean","default":0,"required":false},"widget-visibility":{"description":"","type":"boolean","default":0,"required":false},"widgets":{"description":"","type":"boolean","default":0,"required":false},"woocommerce-analytics":{"description":"","type":"boolean","default":0,"required":false},"wordads":{"description":"","type":"boolean","default":0,"required":false},"wpcom-reader":{"description":"","type":"boolean","default":0,"required":false}}}]},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)\/active":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"active":{"default":true,"type":"boolean","required":true}}}]},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"range":{"default":"day","type":"string","required":false}}}]},"\/jetpack\/v4\/module\/(?P<service>[a-z\\-]+)\/key\/check":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"api_key":{"default":"","type":"string","required":false}}}]},"\/jetpack\/v4\/settings":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"context":{"default":"edit","required":false},"jetpack_blocks_disabled":{"description":"Jetpack Blocks disabled.","type":"boolean","default":false,"required":false},"carousel_background_color":{"description":"Colour scheme.","type":"string","default":"black","enum":["black","white"],"required":false},"carousel_display_exif":{"description":"Show photo metadata (<a href=\"https:\/\/en.wikipedia.org\/wiki\/Exchangeable_image_file_format\" target=\"_blank\">Exif<\/a>) in carousel, when available.","type":"boolean","default":0,"required":false},"carousel_display_comments":{"description":"Show comments area in carousel","type":"boolean","default":1,"required":false},"highlander_comment_form_prompt":{"description":"Greeting Text","type":"string","default":"Leave a Reply","required":false},"jetpack_comment_form_color_scheme":{"description":"Colour scheme","type":"string","default":"light","enum":["light","dark","transparent"],"required":false},"jetpack_portfolio":{"description":"Enable or disable Jetpack portfolio post type.","type":"boolean","default":0,"required":false},"jetpack_portfolio_posts_per_page":{"description":"Number of entries to show at most on Portfolio pages.","type":"integer","default":10,"required":false},"jetpack_testimonial":{"description":"Enable or disable Jetpack testimonial post type.","type":"boolean","default":0,"required":false},"jetpack_testimonial_posts_per_page":{"description":"Number of entries to show at most on Testimonial pages.","type":"integer","default":10,"required":false},"jetpack_waf_automatic_rules":{"description":"Enable automatic rules - Protect your site against untrusted traffic sources with automatic security rules.","type":"boolean","default":false,"required":false},"jetpack_waf_ip_block_list_enabled":{"description":"Block list - Block a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_block_list":{"description":"Blocked IP addresses","type":"string","default":"","required":false},"jetpack_waf_ip_allow_list_enabled":{"description":"Allow list - Allow a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_allow_list":{"description":"Always allowed IP addresses","type":"string","default":"","required":false},"jetpack_waf_share_data":{"description":"Share basic data with Jetpack.","type":"boolean","default":0,"required":false},"jetpack_waf_share_debug_data":{"description":"Share detailed data with Jetpack.","type":"boolean","default":0,"required":false},"tiled_galleries":{"description":"Display all your gallery pictures in a cool mosaic.","type":"boolean","default":0,"required":false},"gravatar_disable_hovercards":{"description":"View people&#039;s profiles when you mouse over their Gravatars","type":"string","default":"enabled","enum":["enabled","disabled"],"required":false},"infinite_scroll":{"description":"To infinity and beyond","type":"boolean","default":1,"required":false},"infinite_scroll_google_analytics":{"description":"Use Google Analytics with Infinite Scroll","type":"boolean","default":0,"required":false},"wpl_default":{"description":"WordPress.com Likes are","type":"string","default":"on","enum":["on","off"],"required":false},"social_notifications_like":{"description":"Send email notification when someone likes a post","type":"boolean","default":1,"required":false},"wpcom_publish_comments_with_markdown":{"description":"Use Markdown for comments.","type":"boolean","default":0,"required":false},"wpcom_publish_posts_with_markdown":{"description":"Use Markdown for posts.","type":"boolean","default":0,"required":false},"monitor_receive_notifications":{"description":"Receive Monitor Email Notifications.","type":"boolean","default":0,"required":false},"post_by_email_address":{"description":"Email Address","type":"string","default":"noop","enum":["noop","create","regenerate","delete"],"required":false},"jetpack_protect_key":{"description":"Protect API key","type":"string","default":"","required":false},"jetpack_protect_global_whitelist":{"description":"Protect global IP allow list","type":"string","default":"","required":false},"sharing_services":{"description":"Enabled Services and those hidden behind a button","type":"object","default":{"visible":["facebook","x"],"hidden":[]},"required":false},"button_style":{"description":"Button Style","type":"string","default":"icon","enum":["icon-text","icon","text","official"],"required":false},"sharing_label":{"description":"Sharing Label","type":"string","default":"","required":false},"show":{"description":"Views where buttons are shown","type":"array","items":{"type":"string"},"default":["post"],"required":false},"jetpack-twitter-cards-site-tag":{"description":"The Twitter username of the owner of this site&#039;s domain.","type":"string","default":"","required":false},"sharedaddy_disable_resources":{"description":"Disable CSS and JS","type":"boolean","default":0,"required":false},"custom":{"description":"Custom sharing services added by user.","type":"object","default":{"sharing_name":"","sharing_url":"","sharing_icon":""},"required":false},"sharing_delete_service":{"description":"Delete custom sharing service.","type":"string","default":"","required":false},"jetpack_sso_require_two_step":{"description":"Require Two-Step Authentication","type":"boolean","default":false,"required":false},"jetpack_sso_match_by_email":{"description":"Match by Email","type":"boolean","default":1,"required":false},"stb_enabled":{"description":"Show a &lt;em&gt;&#039;follow blog&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"stc_enabled":{"description":"Show a &lt;em&gt;&#039;follow comments&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"wpcom_newsletter_categories":{"description":"Array of post category ids that are marked as newsletter categories","type":"array","default":[],"required":false},"wpcom_newsletter_categories_enabled":{"description":"Whether the newsletter categories are enabled or not","type":"boolean","default":0,"required":false},"wpcom_newsletter_send_default":{"description":"Whether to send newsletter emails by default when publishing a post","type":"boolean","default":1,"required":false},"wpcom_featured_image_in_email":{"description":"Whether to include the featured image in the email or not","type":"boolean","default":0,"required":false},"jetpack_gravatar_in_email":{"description":"Whether to show author avatar in the email byline","type":"boolean","default":1,"required":false},"jetpack_author_in_email":{"description":"Whether to show author display name in the email byline","type":"boolean","default":1,"required":false},"jetpack_post_date_in_email":{"description":"Whether to show date in the email byline","type":"boolean","default":1,"required":false},"wpcom_subscription_emails_use_excerpt":{"description":"Whether to use the excerpt in the email or not","type":"boolean","default":0,"required":false},"jetpack_subscriptions_reply_to":{"description":"Reply to email behaviour for newsletters emails","type":"string","default":"comment","required":false},"jetpack_subscriptions_from_name":{"description":"From name for newsletters emails","type":"string","default":"","required":false},"sm_enabled":{"description":"Show popup Subscribe modal to readers.","type":"boolean","default":0,"required":false},"jetpack_subscribe_overlay_enabled":{"description":"Show subscribe overlay on homepage.","type":"boolean","default":0,"required":false},"jetpack_subscribe_floating_button_enabled":{"description":"Show a floating subscribe button.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_post_end_enabled":{"description":"Add Subscribe block at the end of each post.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_login_navigation_enabled":{"description":"Add Subscriber Login block to the navigation.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_navigation_enabled":{"description":"Add Subscribe block to the navigation.","type":"boolean","default":0,"required":false},"social_notifications_subscribe":{"description":"Send email notification when someone subscribes to my blog","type":"boolean","default":0,"required":false},"subscription_options":{"description":"Options used in subscription email templates and the Subscribe block: &#039;invitation&#039;, &#039;welcome&#039;, &#039;comment_follow&#039;, &#039;subscribe_modal_heading&#039;, &#039;free_tier_description&#039; and &#039;hide_free_tier&#039;.","type":"object","default":{"invitation":"","welcome":"","comment_follow":"","subscribe_modal_heading":"","free_tier_description":"","hide_free_tier":false},"required":false},"show_headline":{"description":"Highlight related content with a heading","type":"boolean","default":1,"required":false},"show_thumbnails":{"description":"Show a thumbnail image where available","type":"boolean","default":0,"required":false},"instant_search_enabled":{"description":"Enable Instant Search","type":"boolean","default":0,"required":false},"has_jetpack_search_product":{"description":"Has an active Jetpack Search product purchase","type":"boolean","default":0,"required":false},"search_auto_config":{"description":"Trigger an auto config of instant search","type":"boolean","default":0,"required":false},"google":{"description":"Google Search Console","type":"string","default":"","required":false},"bing":{"description":"Bing Webmaster Centre","type":"string","default":"","required":false},"pinterest":{"description":"Pinterest Site Verification","type":"string","default":"","required":false},"yandex":{"description":"Yandex Site Verification","type":"string","default":"","required":false},"facebook":{"description":"Facebook Domain Verification","type":"string","default":"","required":false},"enable_header_ad":{"description":"Display an ad unit at the top of each page.","type":"boolean","default":1,"required":false},"wordads_approved":{"description":"Is site approved for WordAds?","type":"boolean","default":0,"required":false},"wordads_second_belowpost":{"description":"Display second ad below post?","type":"boolean","default":1,"required":false},"wordads_inline_enabled":{"description":"Display inline ad within post content?","type":"boolean","default":1,"required":false},"wordads_display_front_page":{"description":"Display ads on the front page?","type":"boolean","default":1,"required":false},"wordads_display_post":{"description":"Display ads on posts?","type":"boolean","default":1,"required":false},"wordads_display_page":{"description":"Display ads on pages?","type":"boolean","default":1,"required":false},"wordads_display_archive":{"description":"Display ads on archive pages?","type":"boolean","default":1,"required":false},"wordads_custom_adstxt_enabled":{"description":"Custom ads.txt","type":"boolean","default":0,"required":false},"wordads_custom_adstxt":{"description":"Custom ads.txt entries","type":"string","default":"","required":false},"wordads_ccpa_enabled":{"description":"Enable support for the California Consumer Privacy Act","type":"boolean","default":0,"required":false},"wordads_ccpa_privacy_policy_url":{"description":"Privacy Policy URL","type":"string","default":"","required":false},"wordads_cmp_enabled":{"description":"Enable GDPR Consent Management Banner for WordAds","type":"boolean","default":0,"required":false},"google_analytics_tracking_id":{"description":"Google Analytics","type":"string","default":"","required":false},"jetpack_wga":{"description":"Google Analytics","type":"object","required":false},"admin_bar":{"description":"Include a small chart in your Admin Bar with a 48-hour traffic snapshot.","type":"boolean","default":1,"required":false},"enable_odyssey_stats":{"description":"Preview the new Jetpack Stats experience (Experimental).","type":"boolean","default":1,"required":false},"roles":{"description":"Select the roles that will be able to view stats reports.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"count_roles":{"description":"Count the page views of registered users who are logged in.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"blog_id":{"description":"Blog ID.","type":"boolean","default":0,"required":false},"do_not_track":{"description":"Do not track.","type":"boolean","default":1,"required":false},"version":{"description":"Version.","type":"integer","default":9,"required":false},"collapse_nudges":{"description":"Collapse upgrade nudges","type":"boolean","default":0,"required":false},"wpcom_reader_views_enabled":{"description":"Show post views in the WordPress.com Reader.","type":"boolean","default":1,"required":false},"akismet_show_user_comments_approved":{"description":"","type":"boolean","default":0,"required":false},"wordpress_api_key":{"description":"","type":"string","default":"","required":false},"dismiss_empty_stats_card":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_backup_getting_started":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_agencies_learn_more":{"description":"","type":"boolean","default":0,"required":false},"lang_id":{"description":"Primary language for the site.","type":"string","default":"en_US","required":false},"advanced_seo_front_page_description":{"description":"Front page meta description.","type":"string","default":"","required":false},"advanced_seo_title_formats":{"description":"SEO page title structures.","type":"object","default":{"archives":[],"front_page":[],"groups":[],"pages":[],"posts":[]},"required":false},"jetpack_seo_llms_txt_enabled":{"description":"Generate an llms.txt file to guide AI assistants around your content.","type":"boolean","default":0,"required":false},"jetpack_seo_ai_crawler_overrides":{"description":"AI crawler allow\/block overrides.","type":"object","default":[],"required":false},"videopress_private_enabled_for_site":{"description":"Video Privacy: Restrict views to members of this site","type":"boolean","default":0,"required":false},"ai_seo_enhancer_enabled":{"description":"Automatically generate SEO title, SEO description, and image alt text for new posts.","type":"boolean","default":0,"required":false},"account-protection":{"description":"","type":"boolean","default":0,"required":false},"blaze":{"description":"","type":"boolean","default":0,"required":false},"blocks":{"description":"","type":"boolean","default":0,"required":false},"canonical-urls":{"description":"","type":"boolean","default":0,"required":false},"carousel":{"description":"","type":"boolean","default":0,"required":false},"comment-likes":{"description":"","type":"boolean","default":0,"required":false},"comments":{"description":"","type":"boolean","default":0,"required":false},"contact-form":{"description":"","type":"boolean","default":0,"required":false},"copy-post":{"description":"","type":"boolean","default":0,"required":false},"custom-content-types":{"description":"","type":"boolean","default":0,"required":false},"google-fonts":{"description":"","type":"boolean","default":0,"required":false},"gravatar-hovercards":{"description":"","type":"boolean","default":0,"required":false},"infinite-scroll":{"description":"","type":"boolean","default":0,"required":false},"json-api":{"description":"","type":"boolean","default":0,"required":false},"latex":{"description":"","type":"boolean","default":0,"required":false},"likes":{"description":"","type":"boolean","default":0,"required":false},"markdown":{"description":"","type":"boolean","default":0,"required":false},"monitor":{"description":"","type":"boolean","default":0,"required":false},"notes":{"description":"","type":"boolean","default":0,"required":false},"photon-cdn":{"description":"","type":"boolean","default":0,"required":false},"photon":{"description":"","type":"boolean","default":0,"required":false},"podcast":{"description":"","type":"boolean","default":0,"required":false},"post-by-email":{"description":"","type":"boolean","default":0,"required":false},"post-list":{"description":"","type":"boolean","default":0,"required":false},"protect":{"description":"","type":"boolean","default":0,"required":false},"publicize":{"description":"","type":"boolean","default":0,"required":false},"related-posts":{"description":"","type":"boolean","default":0,"required":false},"search":{"description":"","type":"boolean","default":0,"required":false},"seo-tools":{"description":"","type":"boolean","default":0,"required":false},"sharedaddy":{"description":"","type":"boolean","default":0,"required":false},"shortcodes":{"description":"","type":"boolean","default":0,"required":false},"shortlinks":{"description":"","type":"boolean","default":0,"required":false},"sitemaps":{"description":"","type":"boolean","default":0,"required":false},"sso":{"description":"","type":"boolean","default":0,"required":false},"stats":{"description":"","type":"boolean","default":0,"required":false},"subscriptions":{"description":"","type":"boolean","default":0,"required":false},"tiled-gallery":{"description":"","type":"boolean","default":0,"required":false},"vaultpress":{"description":"","type":"boolean","default":0,"required":false},"verification-tools":{"description":"","type":"boolean","default":0,"required":false},"videopress":{"description":"","type":"boolean","default":0,"required":false},"waf":{"description":"","type":"boolean","default":0,"required":false},"widget-visibility":{"description":"","type":"boolean","default":0,"required":false},"widgets":{"description":"","type":"boolean","default":0,"required":false},"woocommerce-analytics":{"description":"","type":"boolean","default":0,"required":false},"wordads":{"description":"","type":"boolean","default":0,"required":false},"wpcom-reader":{"description":"","type":"boolean","default":0,"required":false}}},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/settings"}]}},"\/jetpack\/v4\/settings\/(?P<slug>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"context":{"default":"edit","required":false}}}]},"\/jetpack\/v4\/options\/(?P<options>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/updates\/plugins":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/updates\/plugins"}]}},"\/jetpack\/v4\/notice\/(?P<notice>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/plugins":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false},"source":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/plugins"}]}},"\/jetpack\/v4\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"status":{"type":"string","required":true},"source":{"type":"string","required":false}}}]},"\/jetpack\/v4\/plugin\/(?P<plugin>[a-z\\\/\\.\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/widgets\/(?P<id>[0-9a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/verify-site\/(?P<service>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"keyring_id":{"type":"integer","required":true}}}]},"\/jetpack\/v4\/verify-site\/(?P<service>[a-z\\-_]+)\/(?<keyring_id>[0-9]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/recommendations\/data":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/recommendations\/data"}]}},"\/jetpack\/v4\/recommendations\/step":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"step":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/recommendations\/step"}]}},"\/jetpack\/v4\/recommendations\/product-suggestions":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/recommendations\/product-suggestions"}]}},"\/jetpack\/v4\/recommendations\/upsell":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/recommendations\/upsell"}]}},"\/jetpack\/v4\/recommendations\/conditional":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/recommendations\/conditional"}]}},"\/jetpack\/v4\/site\/discount":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/site\/discount"}]}},"\/jetpack\/v4\/jetpack_crm":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"extension":{"type":"text","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/jetpack_crm"}]}},"\/jetpack\/v4\/purchase-token":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/purchase-token"}]}},"\/jetpack\/v4\/seen-wc-connection-modal":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/seen-wc-connection-modal"}]}},"\/jetpack\/v4\/intro-offers":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/intro-offers"}]}},"\/jetpack\/v4\/subscribers\/auth":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"redirect_url":{"description":"The URL to redirect to.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/subscribers\/auth"}]}},"\/jetpack\/v4\/features\/available":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/features\/available"}]}},"\/jetpack\/v4\/features\/enabled":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/features\/enabled"}]}},"\/jetpack\/v4\/licensing\/error":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"error":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/licensing\/error"}]}},"\/jetpack\/v4\/licensing\/set-license":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"license":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/licensing\/set-license"}]}},"\/jetpack\/v4\/licensing\/user\/licenses":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/licensing\/user\/licenses"}]}},"\/jetpack\/v4\/licensing\/user\/counts":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/licensing\/user\/counts"}]}},"\/jetpack\/v4\/licensing\/user\/activation-notice-dismiss":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"last_detached_count":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/licensing\/user\/activation-notice-dismiss"}]}},"\/jetpack\/v4\/licensing\/attach-licenses":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"licenses":{"type":"array","items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/licensing\/attach-licenses"}]}},"\/redirection\/v1":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"redirection\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1"}]}},"\/redirection\/v1\/redirect":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/redirect"}]}},"\/redirection\/v1\/redirect\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/redirection\/v1\/redirect\/post":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"text":{"description":"Text to match","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/redirect\/post"}]}},"\/redirection\/v1\/bulk\/redirect\/(?P<bulk>delete|enable|disable|reset)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"global":{"description":"Apply bulk action globally, as per filters","type":"boolean","required":false},"items":{"description":"Array of IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/group":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/group"}]}},"\/redirection\/v1\/group\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false}}}]},"\/redirection\/v1\/bulk\/group\/(?P<bulk>delete|enable|disable)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/log":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/log"}]}},"\/redirection\/v1\/bulk\/log\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/404":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/404"}]}},"\/redirection\/v1\/bulk\/404\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/setting":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/setting"}]}},"\/redirection\/v1\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Name","type":"string","required":false},"value":{"description":"Value","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/plugin"}]}},"\/redirection\/v1\/plugin\/delete":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/plugin\/delete"}]}},"\/redirection\/v1\/plugin\/test":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/plugin\/test"}]}},"\/redirection\/v1\/plugin\/data":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"upgrade":{"description":"Upgrade parameter","type":"string","enum":["stop","skip","retry"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/plugin\/data"}]}},"\/redirection\/v1\/plugin\/finish":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/plugin\/finish"}]}},"\/redirection\/v1\/plugin\/fix":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"reason":{"description":"Reason for fix","type":"string","required":true},"current":{"description":"Current version","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/plugin\/fix"}]}},"\/redirection\/v1\/import\/file\/(?P<group_id>\\d+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"dry_run":{"required":false},"duplicate_mode":{"required":false},"deduplicate":{"required":false},"import_sections":{"required":false}}}]},"\/redirection\/v1\/import\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"delete_source":{"required":false},"duplicate_mode":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/import\/plugin"}]}},"\/redirection\/v1\/import\/plugin\/(?P<plugin>[a-z0-9-]+)\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"delete_source":{"required":false},"duplicate_mode":{"required":false}}}]},"\/redirection\/v1\/export\/(?P<module>1|2|3|all)\/(?P<format>csv|apache|nginx|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/redirection\/v1\/export\/redirect\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/export\/redirect\/preview"}]}},"\/redirection\/v1\/export\/redirect":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/export\/redirect"}]}},"\/redirection\/v1\/export\/log\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/export\/log\/preview"}]}},"\/redirection\/v1\/export\/group\/(?P<format>csv|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/redirection\/v1\/export\/log\/(?P<format>csv|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/redirection\/v1\/export\/404\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/export\/404\/preview"}]}},"\/redirection\/v1\/export\/404\/(?P<format>csv|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/redirection\/v1\/export\/bundle":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/export\/bundle"}]}},"\/redirection\/v1\/export\/bundle\/preview":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/redirection\/v1\/export\/bundle\/preview"}]}},"\/webp-converter\/v1":{"namespace":"webp-converter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"webp-converter\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/webp-converter\/v1"}]}},"\/webp-converter\/v1\/cron-conversion":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/webp-converter\/v1\/cron-conversion"}]}},"\/webp-converter\/v1\/images-stats":{"namespace":"webp-converter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/webp-converter\/v1\/images-stats"}]}},"\/webp-converter\/v1\/paths":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"regenerate_force":{"description":"Option to force all images to be converted again (set `1` to enable)","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/webp-converter\/v1\/paths"}]}},"\/webp-converter\/v1\/regenerate":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"regenerate_force":{"description":"Option to force all images to be converted again (set `1` to enable)","default":false,"required":false},"paths":{"description":"Array of file paths (server paths)","default":[],"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/webp-converter\/v1\/regenerate"}]}},"\/webp-converter\/v1\/regenerate-attachment":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"Attachment ID","required":true},"quality_level":{"description":"Conversion strategy","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/webp-converter\/v1\/regenerate-attachment"}]}},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/bulk_editor\/posts_content":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ids":{"type":"array","minItems":1,"maxItems":20,"items":{"type":"integer","minimum":1},"description":"The IDs of the posts to return the content of. Accepts a comma separated list.","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/posts_content"}]}},"\/yoast\/v1\/bulk_editor\/posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"content_type":{"type":"string","description":"The content type to fetch posts for.","required":true},"per_page":{"type":"integer","default":20,"minimum":1,"maximum":100,"description":"The number of posts to fetch.","required":false},"page":{"type":"integer","default":1,"minimum":1,"description":"The page of posts to fetch.","required":false},"search":{"type":"string","default":"","description":"The term to search posts by.","required":false},"status":{"type":"array","default":["publish","draft","pending","future"],"items":{"type":"string","enum":["publish","draft","pending","future"]},"description":"The post statuses to include.","required":false},"needs_improvement":{"type":"array","default":[],"items":{"type":"string","enum":["seo_title","meta_description","social_title","social_description"]},"description":"The fields to filter posts by; a field matches when it is empty, or (for search fields, while SEO analysis is enabled and the content type shows Yoast's controls and assessments) when its score needs improvement.","required":false},"include":{"type":"array","default":[],"maxItems":100,"items":{"type":"integer","minimum":1},"description":"Limits the posts to these post IDs, e.g. a selection carried over from the posts overview.","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/posts"}]}},"\/yoast\/v1\/bulk_editor\/update_scores":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post score updates to apply.","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/update_scores"}]}},"\/yoast\/v1\/bulk_editor\/update_search":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post updates to apply.","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/update_search"}]}},"\/yoast\/v1\/bulk_editor\/update_social":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post updates to apply.","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/update_social"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/site_kit_configuration_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/site_kit_configuration_permanent_dismissal"}]}},"\/yoast\/v1\/site_kit_manage_consent":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"consent":{"type":"bool","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/site_kit_manage_consent"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/time_based_seo_metrics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"limit":{"type":"int","default":5,"required":false},"options":{"type":"object","properties":{"widget":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/time_based_seo_metrics"}]}},"\/yoast\/v1\/setup_steps_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"setup_widget_loaded":{"type":"string","enum":["yes","no"],"required":false},"first_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"last_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"setup_widget_temporarily_dismissed":{"type":"string","enum":["yes","no"],"required":false},"setup_widget_permanently_dismissed":{"type":"string","enum":["yes","no"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/setup_steps_tracking"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/workouts"}]}},"\/yoast\/v1\/complete_task":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"options":{"type":"object","properties":{"task":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/complete_task"}]}},"\/yoast\/v1\/get_tasks":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"options":{"type":"object","properties":{"filter":{"type":"string","required":false,"sanitize_callback":"sanitize_text_field"},"limit":{"type":"int","required":false,"sanitize_callback":"absint"}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/get_tasks"}]}},"\/yoast\/v1\/action_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/yoast\/v1\/action_tracking"}]}},"\/jetpack\/v4\/heartbeat\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"prefix":{"description":"Prefix to add before the stats identifiers.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/heartbeat\/data"}]}},"\/ithemes-security\/v1\/dashboard-available-cards":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/dashboard-available-cards"}]}},"\/ithemes-security\/v1\/dashboard-available-cards\/(?P<card>[\\w_-]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/ithemes-security\/v1\/dashboard-static":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"default":"30-days","oneOf":[{"type":"object","additionalProperties":false,"properties":{"start":{"type":"string","format":"date-time","required":true},"end":{"type":"string","format":"date-time","required":true}}},{"type":"string","enum":["24-hours","week","30-days"]}],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/dashboard-static"}]}},"\/ithemes-security\/v1\/dashboard\/events":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"default":"30-days","oneOf":[{"type":"object","additionalProperties":false,"properties":{"start":{"type":"string","format":"date-time","required":true},"end":{"type":"string","format":"date-time","required":true}}},{"type":"string","enum":["24-hours","week","30-days"]}],"required":false},"events":{"type":"array","items":{"type":"string"},"uniqueItems":true,"minItems":1,"maxItems":10,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/dashboard\/events"}]}},"\/ithemes-security\/v1\/admin-notices":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/admin-notices"}]}},"\/ithemes-security\/v1\/admin-notices\/(?P<notice>[\\w\\-\\.]+)\/(?P<action>[\\w\\-]+)":{"namespace":"ithemes-security\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/ithemes-security\/v1\/admin-notices\/settings":{"namespace":"ithemes-security\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/admin-notices\/settings"}]}},"\/ithemes-security\/v1\/actors":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/actors"}]}},"\/ithemes-security\/v1\/actors\/(?P<type>[\\w\\-\\_]+)\/search":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/elementor-mcp-composer\/v1.0.19":{"namespace":"elementor-mcp-composer\/v1.0.19","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-mcp-composer\/v1.0.19","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-mcp-composer\/v1.0.19"}]}},"\/elementor-mcp-composer\/v1.0.19\/mcp-settings":{"namespace":"elementor-mcp-composer\/v1.0.19","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"enabled":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-mcp-composer\/v1.0.19\/mcp-settings"}]}},"\/elementor-mcp-composer\/v1.0.19\/mcp-credentials":{"namespace":"elementor-mcp-composer\/v1.0.19","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"client":{"type":"string","enum":["claude-code","claude-desktop","codex","cursor","other"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-mcp-composer\/v1.0.19\/mcp-credentials"}]}},"\/elementor-one\/v1":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-one\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1"}]}},"\/elementor-one\/v1\/connect\/authorize":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/connect\/authorize"}]}},"\/elementor-one\/v1\/connect\/disconnect":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/connect\/disconnect"}]}},"\/elementor-one\/v1\/connect\/switch-domain":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/connect\/switch-domain"}]}},"\/elementor-one\/v1\/connect\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/connect\/deactivate"}]}},"\/elementor-one\/v1\/top-bar\/notifications":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"app_name":{"type":"string","required":true},"app_version":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/top-bar\/notifications"}]}},"\/elementor-one\/v1\/top-bar\/feedback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product":{"type":"string","required":true},"subject":{"type":"string","required":true},"title":{"type":"string","required":true},"description":{"type":"string","required":true},"countryCode":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/top-bar\/feedback"}]}},"\/elementor-one\/v1\/themes":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The theme activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/themes"}]}},"\/elementor-one\/v1\/themes\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true}}}]},"\/elementor-one\/v1\/plugins":{"namespace":"elementor-one\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/plugins"}]}},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/upgrade":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["active"],"required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/run":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez"},"required":true},"force":{"type":"boolean","default":true,"description":"Force migration even if the plugin is already connected.","required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/rollback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez"},"required":true}}}]},"\/elementor-one\/v1\/settings":{"namespace":"elementor-one\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/settings"}]}},"\/elementor-one\/v1\/manage-dashboard-widget\/state":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/manage-dashboard-widget\/state"}]}},"\/elementor-one\/v1\/logs":{"namespace":"elementor-one\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-one\/v1\/logs"}]}},"\/jetpack\/v4\/verify_xmlrpc_error":{"namespace":"jetpack\/v4","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"nonce":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/verify_xmlrpc_error"}]}},"\/jetpack\/v4\/sync\/full-sync":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"modules":{"description":"Data Modules that should be included in Full Sync","type":"array","required":false},"users":{"description":"User IDs to include in Full Sync or \"initial\"","required":false},"posts":{"description":"Post IDs to include in Full Sync","type":"array","required":false},"comments":{"description":"Comment IDs to include in Full Sync","type":"array","required":false},"context":{"description":"Context for the Full Sync","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/full-sync"}]}},"\/jetpack\/v4\/sync\/status":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"fields":{"description":"Comma-separated list of additional fields that should be included in status.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/status"}]}},"\/jetpack\/v4\/sync\/health":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"status":{"description":"New Sync health status","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/health"}]}},"\/jetpack\/v4\/sync\/settings":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/settings"}]}},"\/jetpack\/v4\/sync\/object":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"module_name":{"description":"Name of Sync module","type":"string","required":false},"object_type":{"description":"Object Type","type":"string","required":false},"object_ids":{"description":"Objects Identifiers","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/object"}]}},"\/jetpack\/v4\/sync\/now":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"queue":{"description":"Name of Sync queue.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/now"}]}},"\/jetpack\/v4\/sync\/checkout":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"queue":{"description":"Name of Sync queue.","type":"string","required":false},"number_of_items":{"description":"Number of items to checkout from the queue.","type":"integer","required":false},"pop":{"description":"Pop items from the queue instead of checking out.","type":"boolean","required":false},"force":{"description":"Force unlock the queue before checkout.","type":"boolean","required":false},"encode":{"description":"Encode the items before sending.","type":"boolean","default":true,"required":false},"use_memory_limit":{"description":"Use memory-based checkout instead of fixed item count.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/checkout"}]}},"\/jetpack\/v4\/sync\/close":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/close"}]}},"\/jetpack\/v4\/sync\/unlock":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"queue":{"description":"Name of Sync queue.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/unlock"}]}},"\/jetpack\/v4\/sync\/object-id-range":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"sync_module":{"description":"Name of Sync module.","type":"string","required":true},"batch_size":{"description":"Size of batches","type":"int","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/object-id-range"}]}},"\/jetpack\/v4\/sync\/data-check":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"perform_text_conversion":{"description":"If text fields should be converted to latin1 in checksum calculation.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/data-check"}]}},"\/jetpack\/v4\/sync\/data-histogram":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"columns":{"description":"Column mappings","type":"array","required":false},"object_type":{"description":"Object Type","type":"string","required":false},"buckets":{"description":"Number of histogram buckets.","type":"int","required":false},"start_id":{"description":"Start ID for the histogram","type":"int","required":false},"end_id":{"description":"End ID for the histogram","type":"int","required":false},"strip_non_ascii":{"description":"Strip non-ASCII characters?","type":"boolean","required":false},"shared_salt":{"description":"Shared Salt to use when generating checksum","type":"string","required":false},"only_range_edges":{"description":"Should only range edges be returned","type":"boolean","required":false},"detailed_drilldown":{"description":"Do we want the checksum or object IDs?","type":"boolean","required":false},"perform_text_conversion":{"description":"If text fields should be converted to latin1 in checksum calculation.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/data-histogram"}]}},"\/jetpack\/v4\/sync\/spawn-sync":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/spawn-sync"}]}},"\/jetpack\/v4\/sync\/locks":{"namespace":"jetpack\/v4","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/locks"}]}},"\/jetpack\/v4\/sync\/clear-queue":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/sync\/clear-queue"}]}},"\/jetpack\/v4\/jitm":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/jitm"}]}},"\/jetpack\/v4\/identity-crisis\/confirm-safe-mode":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/identity-crisis\/confirm-safe-mode"}]}},"\/jetpack\/v4\/identity-crisis\/migrate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/identity-crisis\/migrate"}]}},"\/jetpack\/v4\/identity-crisis\/start-fresh":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"redirect_uri":{"description":"URI of the admin page where the user should be redirected after connection flow","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/identity-crisis\/start-fresh"}]}},"\/jetpack\/v4\/identity-crisis\/idc-url-validation":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/identity-crisis\/idc-url-validation"}]}},"\/jetpack\/v4\/identity-crisis\/url-secret":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/identity-crisis\/url-secret"}]}},"\/jetpack\/v4\/identity-crisis\/compare-url-secret":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"secret":{"description":"URL secret to compare to the ones stored in the database.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/identity-crisis\/compare-url-secret"}]}},"\/jetpack\/v4\/search\/plan":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/plan"}]}},"\/jetpack\/v4\/search\/settings":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/settings"}]}},"\/jetpack\/v4\/search\/stats":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/stats"}]}},"\/jetpack\/v4\/search\/pricing":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/pricing"}]}},"\/jetpack\/v4\/search\/templates\/(?P<post_type>[a-z0-9_-]+)":{"namespace":"jetpack\/v4","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"post_type":{"required":true}}}]},"\/jetpack\/v4\/search\/plan\/activate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/plan\/activate"}]}},"\/jetpack\/v4\/search\/plan\/deactivate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/plan\/deactivate"}]}},"\/jetpack\/v4\/search":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search"}]}},"\/jetpack\/v4\/search\/local-stats":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/search\/local-stats"}]}},"\/jetpack\/v4\/waf":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/waf"}]}},"\/jetpack\/v4\/waf\/update-rules":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/waf\/update-rules"}]}},"\/duplicate-post\/v1":{"namespace":"duplicate-post\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"duplicate-post\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/duplicate-post\/v1"}]}},"\/duplicate-post\/v1\/original\/(?P<post_id>\\d+)":{"namespace":"duplicate-post\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"post_id":{"description":"The ID of the post to remove the original reference from.","type":"integer","required":true}}}]},"\/elementor\/v1":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1"}]}},"\/elementor\/v1\/site-editor":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/site-editor"}]}},"\/elementor\/v1\/site-editor\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/site-editor\/templates"}]}},"\/elementor\/v1\/site-editor\/templates\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/conditions-config":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/site-editor\/conditions-config"}]}},"\/elementor\/v1\/site-editor\/templates-conditions\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/templates-conditions-conflicts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/site-editor\/templates-conditions-conflicts"}]}},"\/elementor-pro\/v1":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-pro\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1"}]}},"\/elementor-pro\/v1\/license\/tier-features":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1\/license\/tier-features"}]}},"\/elementor-pro\/v1\/license\/get-license-status":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1\/license\/get-license-status"}]}},"\/ea11y\/v1":{"namespace":"ea11y\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ea11y\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1"}]}},"\/ea11y\/v1\/connect\/authorize":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/connect\/authorize"}]}},"\/ea11y\/v1\/connect\/disconnect":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/connect\/disconnect"}]}},"\/ea11y\/v1\/connect\/switch-domain":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/connect\/switch-domain"}]}},"\/ea11y\/v1\/connect\/deactivate":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/connect\/deactivate"}]}},"\/ea11y\/v1\/settings\/get-settings":{"namespace":"ea11y\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/settings\/get-settings"}]}},"\/ea11y\/v1\/settings\/get-media":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/settings\/get-media"}]}},"\/ea11y\/v1\/analytics\/statistic":{"namespace":"ea11y\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/analytics\/statistic"}]}},"\/ea11y\/v1\/remediation\/register":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/register"}]}},"\/ea11y\/v1\/remediation\/set-alt-text":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/set-alt-text"}]}},"\/ea11y\/v1\/remediation\/items":{"namespace":"ea11y\/v1","methods":["GET","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/items"}]}},"\/ea11y\/v1\/remediation\/item":{"namespace":"ea11y\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["PUT"],"args":[]},{"methods":["PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/item"}]}},"\/ea11y\/v1\/remediation\/global-item":{"namespace":"ea11y\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["PUT"],"args":[]},{"methods":["PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/global-item"}]}},"\/ea11y\/v1\/remediation\/global-items":{"namespace":"ea11y\/v1","methods":["PUT","PATCH","DELETE"],"endpoints":[{"methods":["PUT"],"args":[]},{"methods":["PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/global-items"}]}},"\/ea11y\/v1\/remediation\/global-items-group":{"namespace":"ea11y\/v1","methods":["PUT","PATCH"],"endpoints":[{"methods":["PUT"],"args":[]},{"methods":["PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/global-items-group"}]}},"\/ea11y\/v1\/remediation\/trigger-save":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/trigger-save"}]}},"\/ea11y\/v1\/remediation\/heading-level":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/heading-level"}]}},"\/ea11y\/v1\/remediation\/dismiss-heading-issue":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/dismiss-heading-issue"}]}},"\/ea11y\/v1\/remediation\/clear-cache":{"namespace":"ea11y\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/remediation\/clear-cache"}]}},"\/ea11y\/v1\/reviews\/review":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ea11y\/v1\/reviews\/review"}]}},"\/backwpup\/v1":{"namespace":"backwpup\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"backwpup\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1"}]}},"\/backwpup\/v1\/storagelistcompact":{"namespace":"backwpup\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/storagelistcompact"}]}},"\/backwpup\/v1\/cloud_is_authenticated":{"namespace":"backwpup\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/cloud_is_authenticated"}]}},"\/backwpup\/v1\/authenticate_cloud":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/authenticate_cloud"}]}},"\/backwpup\/v1\/delete_auth_cloud":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/delete_auth_cloud"}]}},"\/backwpup\/v1\/cloudsaveandtest":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/cloudsaveandtest"}]}},"\/backwpup\/v2":{"namespace":"backwpup\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"backwpup\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v2"}]}},"\/backwpup\/v2\/storages":{"namespace":"backwpup\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v2\/storages"}]}},"\/backwpup\/v2\/messages":{"namespace":"backwpup\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v2\/messages"}]}},"\/backwpup\/v1\/chatbot-context":{"namespace":"backwpup\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["GET"],"args":{"context_id":{"required":true},"context_token":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/chatbot-context"}]}},"\/backwpup\/v1\/updatejob":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"job_id":{"required":true},"activ":{"required":false},"storage_destinations":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/updatejob"}]}},"\/backwpup\/v1\/update-job-title":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"job_id":{"required":true},"title":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/update-job-title"}]}},"\/backwpup\/v1\/addjob":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/addjob"}]}},"\/backwpup\/v1\/delete_job":{"namespace":"backwpup\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"job_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/delete_job"}]}},"\/backwpup\/v1\/save_job_settings":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/save_job_settings"}]}},"\/backwpup\/v2\/save_job_format":{"namespace":"backwpup\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v2\/save_job_format"}]}},"\/backwpup\/v1\/save_files_exclusions":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"job_id":{"required":true},"backuproot":{"required":false},"backupplugins":{"required":false},"backupthemes":{"required":false},"backupuploads":{"required":false},"backupcontent":{"required":false},"fileexclude":{"required":false},"add":{"required":false},"backuppluginsexcludedirs":{"required":false},"backupthemesexcludedirs":{"required":false},"backupcontentexcludedirs":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/save_files_exclusions"}]}},"\/backwpup\/v1\/save_excluded_tables":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"job_id":{"required":true},"tabledb":{"required":false},"dbdumpfile":{"required":false},"dbdumpwpdbsettings":{"required":false},"dbdumpfilecompression":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/save_excluded_tables"}]}},"\/backwpup\/v1\/save_site_option":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/save_site_option"}]}},"\/backwpup\/v2\/backups\/(?P<id>\\d+)\/type":{"namespace":"backwpup\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true},"type":{"required":true}}}]},"\/backwpup\/v1\/getjobslist":{"namespace":"backwpup\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/getjobslist"}]}},"\/backwpup\/v1\/job-abort-status":{"namespace":"backwpup\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"job_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/job-abort-status"}]}},"\/backwpup\/v1\/startbackup":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"job_id":{"required":false},"first_backup":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/startbackup"}]}},"\/backwpup\/v1\/process_bulk_actions":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"required":true},"backups":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/process_bulk_actions"}]}},"\/backwpup\/v1\/backups":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"page":{"default":1,"required":false},"length":{"default":10,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/backups"}]}},"\/backwpup\/v1\/pagination":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"page":{"default":1,"required":false},"max_pages":{"default":10,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/pagination"}]}},"\/backwpup\/v1\/getblock":{"namespace":"backwpup\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/backwpup\/v1\/getblock"}]}},"\/jetpack\/v4\/activity-log":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"description":"Number of items to return per page.","type":"integer","minimum":1,"maximum":1000,"required":false},"page":{"description":"1-indexed page number.","type":"integer","minimum":1,"required":false},"sort_order":{"description":"Sort direction.","type":"string","enum":["asc","desc"],"required":false},"after":{"description":"ISO 8601 lower bound on event timestamp.","type":"string","format":"date-time","required":false},"before":{"description":"ISO 8601 upper bound on event timestamp.","type":"string","format":"date-time","required":false},"group":{"description":"Only return events in these groups.","type":"array","items":{"type":"string"},"required":false},"not_group":{"description":"Exclude events in these groups.","type":"array","items":{"type":"string"},"required":false},"text_search":{"description":"Full-text search string.","type":"string","required":false},"actor":{"description":"Only return events performed by these actor IDs.","type":"array","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/activity-log"}]}},"\/jetpack\/v4\/activity-log\/count\/group":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"description":"Cap on the number of events considered when counting groups.","type":"integer","minimum":1,"maximum":1000,"required":false},"after":{"description":"ISO 8601 lower bound on event timestamp.","type":"string","format":"date-time","required":false},"before":{"description":"ISO 8601 upper bound on event timestamp.","type":"string","format":"date-time","required":false},"group":{"description":"Only count events in these groups.","type":"array","items":{"type":"string"},"required":false},"not_group":{"description":"Exclude events in these groups.","type":"array","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/activity-log\/count\/group"}]}},"\/jetpack\/v4\/activity-log\/actors":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"description":"Cap on the number of events considered when collecting actors.","type":"integer","minimum":1,"maximum":1000,"required":false},"after":{"description":"ISO 8601 lower bound on event timestamp.","type":"string","format":"date-time","required":false},"before":{"description":"ISO 8601 upper bound on event timestamp.","type":"string","format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/activity-log\/actors"}]}},"\/elementor-hello-elementor\/v1":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-hello-elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-hello-elementor\/v1"}]}},"\/elementor-hello-elementor\/v1\/promotions":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-hello-elementor\/v1\/promotions"}]}},"\/elementor-hello-elementor\/v1\/admin-settings":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-hello-elementor\/v1\/admin-settings"}]}},"\/elementor-hello-elementor\/v1\/theme-settings":{"namespace":"elementor-hello-elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-hello-elementor\/v1\/theme-settings"}]}},"\/elementor-hello-elementor\/v1\/whats-new":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-hello-elementor\/v1\/whats-new"}]}},"\/jetpack\/v4\/feature\/custom-content-types":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/feature\/custom-content-types"}]}},"\/jetpack\/v4\/hints":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"hint":{"default":"","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/hints"}]}},"\/google-site-kit\/v1":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"google-site-kit\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1"}]}},"\/google-site-kit\/v1\/core\/site\/data\/setup-tag":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/setup-tag"}]}},"\/google-site-kit\/v1\/core\/site\/data\/connection":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/connection"}]}},"\/google-site-kit\/v1\/core\/user\/data\/authentication":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/authentication"}]}},"\/google-site-kit\/v1\/core\/user\/data\/disconnect":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/disconnect"}]}},"\/google-site-kit\/v1\/core\/user\/data\/get-token":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/get-token"}]}},"\/google-site-kit\/v1\/core\/user\/data\/user-input-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"questions":{"purpose":{"type":"array","items":{"type":"string"}},"postFrequency":{"type":"array","items":{"type":"string"}},"goals":{"type":"array","items":{"type":"string"}},"includeConversionEvents":{"type":"array","items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/user-input-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/audience-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"configuredAudiences":{"type":"array","items":{"type":"string"}},"isAudienceSegmentationWidgetHidden":{"type":"boolean"},"didSetAudiences":{"type":"boolean"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/audience-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/conversion-reporting-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"newEventsCalloutDismissedAt":{"type":"integer"},"lostEventsCalloutDismissedAt":{"type":"integer"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/conversion-reporting-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/email-reporting-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"frequency":{"type":"string","enum":["weekly","monthly","quarterly"]},"subscribed":{"type":"boolean"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/email-reporting-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/email-reporting-next-report":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/email-reporting-next-report"}]}},"\/google-site-kit\/v1\/core\/user\/data\/initial-setup-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"hasSitePurposeAnswer":{"type":"boolean"},"isAnalyticsSetupComplete":{"type":"boolean"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/initial-setup-settings"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/list":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/list"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/activation":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/activation"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/info":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/info"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/check-access":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/check-access"}]}},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/notifications":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false},"data":{"type":"object","description":"Settings to set.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/data-available":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/(?P<datapoint>[a-z\\-]+)":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false},"datapoint":{"type":"string","description":"Module data point to address.","default":null,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false},"datapoint":{"type":"string","description":"Module data point to address.","default":null,"required":false},"data":{"type":"object","description":"Data to set.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/core\/modules\/data\/recover-modules":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/recover-modules"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/sharing-settings":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/sharing-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismissed-items":{"namespace":"google-site-kit\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":{"data":{"type":"object","description":"","default":null,"minProperties":1,"additionalProperties":false,"properties":{"slugs":{"type":"array","required":true,"items":{"type":"string"}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismissed-items"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismiss-item":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismiss-item"}]}},"\/google-site-kit\/v1\/core\/user\/data\/expirable-items":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/expirable-items"}]}},"\/google-site-kit\/v1\/core\/user\/data\/set-expirable-item-timers":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"array","description":"","default":null,"items":{"type":"object","additionalProperties":false,"properties":{"slug":{"type":"string","required":true},"expiration":{"type":"integer","required":true}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/set-expirable-item-timers"}]}},"\/google-site-kit\/v1\/core\/user\/data\/permissions":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/permissions"}]}},"\/google-site-kit\/v1\/core\/user\/data\/nonces":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/nonces"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey-trigger":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"triggerID":{"type":"string","required":true},"ttl":{"type":"integer","minimum":0}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey-trigger"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey-event":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"session":{"type":"object","required":true,"properties":{"session_id":{"type":"string","required":true},"session_token":{"type":"string","required":true}}},"event":{"type":"object","required":true,"properties":{"survey_shown":{"type":"object"},"survey_closed":{"type":"object"},"question_answered":{"type":"object"},"completion_shown":{"type":"object"},"follow_up_link_clicked":{"type":"object"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey-event"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey-timeouts":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey-timeouts"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey"}]}},"\/google-site-kit\/v1\/core\/site\/data\/reset":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/reset"}]}},"\/google-site-kit\/v1\/core\/site\/data\/reset-persistent":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/reset-persistent"}]}},"\/google-site-kit\/v1\/core\/site\/data\/developer-plugin":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/developer-plugin"}]}},"\/google-site-kit\/v1\/core\/user\/data\/tracking":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"enabled":{"type":"boolean","required":true}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/tracking"}]}},"\/google-site-kit\/v1\/core\/search\/data\/entity-search":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"query":{"type":"string","description":"Text content to search for.","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/search\/data\/entity-search"}]}},"\/google-site-kit\/v1\/core\/site\/data\/admin-bar-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"enabled":{"type":"boolean","required":false}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/admin-bar-settings"}]}},"\/google-site-kit\/v1\/core\/site\/data\/notifications":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/notifications"}]}},"\/google-site-kit\/v1\/core\/site\/data\/mark-notification":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/mark-notification"}]}},"\/google-site-kit\/v1\/core\/site\/data\/site-health-tag-placement-test":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/site-health-tag-placement-test"}]}},"\/google-site-kit\/v1\/core\/site\/data\/health-checks":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/health-checks"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismissed-tours":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismissed-tours"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismiss-tour":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismiss-tour"}]}},"\/google-site-kit\/v1\/core\/user\/data\/key-metrics":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"properties":{"isWidgetHidden":{"type":"boolean","required":true},"widgetSlugs":{"type":"array","required":false,"maxItems":8,"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/key-metrics"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismissed-prompts":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismissed-prompts"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismiss-prompt":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismiss-prompt"}]}},"\/google-site-kit\/v1\/core\/site\/data\/consent-mode":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"enabled":{"type":"boolean"},"regions":{"type":"array","items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/consent-mode"}]}},"\/google-site-kit\/v1\/core\/site\/data\/consent-api-info":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/consent-api-info"}]}},"\/google-site-kit\/v1\/core\/site\/data\/consent-api-activate":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/consent-api-activate"}]}},"\/google-site-kit\/v1\/core\/site\/data\/ads-measurement-status":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/ads-measurement-status"}]}},"\/google-site-kit\/v1\/core\/site\/data\/conversion-tracking":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"properties":{"enabled":{"type":"boolean","required":true}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/conversion-tracking"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"enabled":{"type":"boolean","required":true}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-eligible-subscribers":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","description":"","default":1,"minimum":1,"required":false},"per_page":{"type":"integer","description":"","default":20,"minimum":1,"maximum":100,"required":false},"search":{"type":"string","description":"","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-eligible-subscribers"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-subscribed-users":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","description":"","default":1,"minimum":1,"required":false},"per_page":{"type":"integer","description":"","default":20,"minimum":1,"maximum":100,"required":false},"search":{"type":"string","description":"","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-subscribed-users"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-unsubscribe-user":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"userID":{"type":"integer","required":true,"minimum":1}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-unsubscribe-user"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-errors":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-errors"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-invite-user":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"userID":{"type":"integer","required":true,"minimum":1}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-invite-user"}]}},"\/elementor\/v1\/documents":{"namespace":"elementor\/v1\/documents","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/documents","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/documents"}]}},"\/elementor\/v1\/documents\/(?P<id>\\d+)\/media\/import":{"namespace":"elementor\/v1\/documents","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true}}}]},"\/elementor\/v1\/cache":{"namespace":"elementor\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/cache"}]}},"\/elementor\/v1\/globals":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/globals"}]}},"\/elementor\/v1\/globals\/colors":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/globals\/colors"}]}},"\/elementor\/v1\/globals\/colors\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/globals\/typography":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/globals\/typography"}]}},"\/elementor\/v1\/globals\/typography\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/mcp-proxy":{"namespace":"elementor\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"tool":{"type":"string","required":true},"input":{"type":"object","required":true}}},{"methods":["GET"],"args":{"uri":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/mcp-proxy"}]}},"\/elementor\/v1\/settings\/(?P<key>[\\w_-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/elementor\/v1\/post":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included post types","type":"array","default":null,"required":false},"excluded_types":{"description":"Post type to exclude","type":"array","default":["e-floating-buttons","e-landing-page","elementor_library","attachment","revision","nav_menu_item","custom_css","customize_changeset"],"required":false},"term":{"description":"Posts to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"ID":"id","post_title":"label","post_type":"groupLabel"},"required":false},"items_count":{"description":"Posts per page","type":"integer","default":100,"required":false},"is_public":{"description":"Whether to include only public post types","type":"boolean","default":true,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false},"tax_query":{"description":"WP_Query tax_query array","type":"array","default":null,"required":false},"search_in_content":{"description":"Whether to search within post content and excerpt in addition to title","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/post"}]}},"\/elementor\/v1\/term":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"excluded_types":{"description":"Excluded taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"term":{"description":"Terms to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"term_id":"id","name":"label","taxonomy":"groupLabel"},"required":false},"items_count":{"description":"Terms per request","type":"integer","default":100,"required":false},"hide_empty":{"description":"Whether to include only public terms","type":"boolean","default":false,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/term"}]}},"\/elementor\/v1\/user":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term":{"description":"Users to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":["array","string"],"default":{"ID":"id","display_name":"label","role":"groupLabel"},"required":false},"items_count":{"description":"Number of users to return","type":"integer","default":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/user"}]}},"\/elementor-ai\/v1":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-ai\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-ai\/v1"}]}},"\/elementor-ai\/v1\/permissions":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-ai\/v1\/permissions"}]}},"\/elementor\/v1\/favorites":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/favorites"}]}},"\/elementor\/v1\/favorites\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to create.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to delete.","type":"string","required":true}}}]},"\/elementor\/v1\/kit-elements-defaults":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/kit-elements-defaults"}]}},"\/elementor\/v1\/kit-elements-defaults\/(?P<type>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","description":"The type of the element.","required":true},"settings":{"description":"All the default values for the requested type","type":"object","required":true}}},{"methods":["DELETE"],"args":{"type":{"type":"string","description":"The type of the element.","required":true}}}]},"\/elementor\/v1\/site-navigation\/recent-posts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"posts_per_page":{"description":"Number of posts to return","type":"integer","required":true},"post_type":{"description":"Post types to retrieve","type":"array","default":["page","post","elementor_library"],"required":false},"post__not_in":{"description":"Post id`s to exclude","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/site-navigation\/recent-posts"}]}},"\/elementor\/v1\/site-navigation\/add-new-post":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"Post type to create","type":"string","default":"post","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/site-navigation\/add-new-post"}]}},"\/elementor\/v1\/design-system-sync\/stylesheet":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/design-system-sync\/stylesheet"}]}},"\/elementor\/v1\/operations\/opt-in-v4":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/operations\/opt-in-v4"}]}},"\/elementor\/v1\/feedback":{"namespace":"elementor\/v1\/feedback","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/feedback","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/feedback"}]}},"\/elementor\/v1\/feedback\/submit":{"namespace":"elementor\/v1\/feedback","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/feedback\/submit"}]}},"\/elementor\/v1\/angie\/consent":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/angie\/consent"}]}},"\/elementor\/v1\/template-library\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"title":{"type":"string","description":"The title of the document","required":false},"type":{"description":"The document type.","type":"string","enum":["page","section","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item"],"required":true},"content":{"description":"Elementor data object","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/template-library\/templates"}]}},"\/elementor\/v1\/system-info":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/system-info"}]}},"\/elementor\/v1\/user-data\/current-user":{"namespace":"elementor\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":{"suppressedMessages":{"type":"array","description":"Array of suppressed message keys","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/user-data\/current-user"}]}},"\/elementor\/v1\/global-widget\/templates":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/global-widget\/templates"}]}},"\/elementor-pro\/v1\/posts-widget":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1\/posts-widget"}]}},"\/elementor\/v1\/form-submissions":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false}}},{"methods":["DELETE"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/form-submissions"}]}},"\/elementor\/v1\/form-submissions\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false},"values":{"description":"Form field values, receive an array, the key should be the form field id and the value should be the value.","type":"object","required":false}}}]},"\/elementor\/v1\/form-submissions\/restore\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/form-submissions\/restore":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/form-submissions\/restore"}]}},"\/elementor\/v1\/form-submissions\/export":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":10000,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"additionalProperties":{"context":"filter"},"required":false},"format":{"description":"The format of the export (for now only csv).","enum":["csv"],"default":"csv","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/form-submissions\/export"}]}},"\/elementor\/v1\/form-submissions\/referer":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"value":{"description":"Limit results specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/form-submissions\/referer"}]}},"\/elementor\/v1\/forms":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/forms"}]}},"\/elementor-pro\/v1\/get-post-type-taxonomies":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"The post type for which to fetch the list of taxonomies.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1\/get-post-type-taxonomies"}]}},"\/elementor-pro\/v1\/refresh-loop":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_filters":{"description":"The filters for the loop widget.","type":"object","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false},"pagination_base_url":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1\/refresh-loop"}]}},"\/elementor-pro\/v1\/refresh-search":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false},"breakpoint":{"description":"Active Elementor responsive device key (e.g. mobile, tablet, desktop).","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor-pro\/v1\/refresh-search"}]}},"\/elementor\/v1\/notes":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"status":{"type":"string","description":"The note status (e.g. \"publish\", \"draft\").","enum":["publish","draft"],"default":"publish","required":false},"is_resolved":{"type":"boolean","description":"Whether the note is resolved or not.","required":false},"parent_id":{"type":"integer","description":"The note's parent id (use 0 for top-level).","required":false},"post_id":{"type":"integer","description":"The ID of the post that the note is attached to.","required":false},"only_unread":{"type":"boolean","description":"Show only unread notes (represents an unread thread if one of its replies is unread).","required":false},"only_relevant":{"type":"boolean","description":"Show only notes that are relevant to the current user.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"last_activity_at","enum":["last_activity_at","created_at"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"desc","enum":["asc","desc"],"required":false}}},{"methods":["POST"],"args":{"post_id":{"type":"integer","description":"The id of the post where the note was created at (can be template, post, page, etc.).","required":true},"element_id":{"type":"string","description":"Each note must be attached to an elementor element.","required":true},"content":{"type":"string","description":"The content of the note.","required":true},"position":{"type":"object","properties":{"x":{"required":true,"type":"number"},"y":{"required":true,"type":"number"}},"description":"The position of the note.","required":true},"mentioned_usernames":{"type":"array","description":"List of user names that have been mentioned in the note's content.","default":[],"items":{"type":"string","sanitize_callback":{}},"required":false},"route_post_id":{"description":"The ID of the post that's associated with the route (doesn't always exist, e.g: home page, archive)","required":false},"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"route_title":{"type":"string","description":"The title of the route where the note was created at.","required":false},"parent_id":{"type":"integer","description":"If the new note is a reply to another note, the parent_id should be the thread's id.","default":0,"required":false},"is_public":{"type":"boolean","description":"Should this note be visible for everyone or just for its author.","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/notes"}]}},"\/elementor\/v1\/notes\/read-status":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","description":"The id's of the notes.","items":{"type":"integer"},"required":true}}},{"methods":["DELETE"],"args":{"ids":{"type":"array","description":"The id's of the notes.","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/notes\/read-status"}]}},"\/elementor\/v1\/notes\/summary":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"status":{"type":"string","description":"The note status (e.g. \"publish\", \"draft\").","enum":["publish","draft"],"default":"publish","required":false},"is_resolved":{"type":"boolean","description":"Whether the note is resolved or not.","required":false},"parent_id":{"type":"integer","description":"The note's parent id (use 0 for top-level).","required":false},"post_id":{"type":"integer","description":"The ID of the post that the note is attached to.","required":false},"only_unread":{"type":"boolean","description":"Show only unread notes (represents an unread thread if one of its replies is unread).","required":false},"only_relevant":{"type":"boolean","description":"Show only notes that are relevant to the current user.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"last_activity_at","enum":["last_activity_at","created_at"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"desc","enum":["asc","desc"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/notes\/summary"}]}},"\/elementor\/v1\/notes\/users":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"limit":{"type":"integer","description":"Limit the results.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"display_name","enum":["user_nicename","display_name","user_registered"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"asc","enum":["asc","desc"],"required":false},"search":{"type":"string","description":"Filter users by a search term.","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/notes\/users"}]}},"\/elementor\/v1\/notes\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","description":"Note ID to find.","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","description":"The id the note.","required":true},"content":{"type":"string","description":"The content of the note.","required":false},"mentioned_usernames":{"type":"array","description":"List of user names that have been mentioned in the note's content.","items":{"type":"string","sanitize_callback":{}},"required":false},"status":{"type":"string","description":"Note status can be draft or publish.","enum":["publish","draft"],"required":false},"is_public":{"type":"boolean","description":"Should this note be visible for everyone or just for its author.","required":false},"is_resolved":{"type":"boolean","description":"Is this note resolved and should be hidden.","required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","description":"The id of the note.","required":true},"force":{"type":"boolean","description":"Determine if it should be deleted permanently or change the status to trash.","default":false,"required":false}}}]},"\/wp-optimize\/v1\/onboarding":{"namespace":"wp-optimize\/v1\/onboarding","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-optimize\/v1\/onboarding","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-optimize\/v1\/onboarding"}]}},"\/wp-optimize\/v1\/onboarding\/do_action\/(?P<action>[a-z\\_\\-]+)":{"namespace":"wp-optimize\/v1\/onboarding","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/firewall\/rules":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"provider":{"type":"array","items":{"type":"string"},"required":false},"vulnerability":{"type":"array","items":{"type":"string"},"required":false},"paused":{"type":"boolean","required":false}}},{"methods":["POST"],"args":{"name":{"type":"string","minLength":1,"required":true},"config":{"type":"object","properties":{"rules":{"type":"array","items":{"type":"object","properties":{"parameter":{"type":["string","array"],"required":true,"items":{"type":"string"}}}},"required":true,"minItems":1,"uniqueItems":true},"type":{"type":"string","enum":["BLOCK","LOG","REDIRECT","WHITELIST"],"required":true},"type_params":{"type":"string","format":"uri"}},"required":true},"paused_at":{"type":["string","null"],"format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/firewall\/rules"}]}},"\/ithemes-security\/v1\/firewall\/rules\/(?P<id>[\\d]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"args":{"name":{"type":"string","minLength":1,"required":false},"config":{"type":"object","properties":{"rules":{"type":"array","items":{"type":"object","properties":{"parameter":{"type":["string","array"],"required":true,"items":{"type":"string"}}}},"required":true,"minItems":1,"uniqueItems":true},"type":{"type":"string","enum":["BLOCK","LOG","REDIRECT","WHITELIST"],"required":true},"type_params":{"type":"string","format":"uri"}},"required":false},"paused_at":{"type":["string","null"],"format":"date-time","required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/user-groups":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"label":{"type":"string","minLength":1,"required":true},"users":{"type":"array","items":{"type":"integer","minimum":0},"uniqueItems":true,"required":false},"roles":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor","backwpup_admin","backwpup_check","backwpup_helper"]},"required":false},"canonical":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber"]},"required":false},"min_role":{"type":"string","enum":["","administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor","backwpup_admin","backwpup_check","backwpup_helper"],"required":false},"ignore_duplicate":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/user-groups"}]}},"\/ithemes-security\/v1\/user-groups\/(?P<id>[\\w_:-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"label":{"type":"string","minLength":1,"required":false},"users":{"type":"array","items":{"type":"integer","minimum":0},"uniqueItems":true,"required":false},"roles":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor","backwpup_admin","backwpup_check","backwpup_helper"]},"required":false},"canonical":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber"]},"required":false},"min_role":{"type":"string","enum":["","administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor","backwpup_admin","backwpup_check","backwpup_helper"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/user-matchables":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/user-matchables"}]}},"\/ithemes-security\/v1\/user-matchable-settings":{"namespace":"ithemes-security\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"include":{"type":"array","items":{"type":"string"},"required":false}}},{"methods":["PATCH"],"args":{"global":{"title":"Global Settings","type":"object","properties":{"manage_group":{"title":"Manage Kadence Security","description":"Allow users to manage Kadence Security.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"dashboard":{"title":"Security Dashboard","type":"object","properties":{"group":{"title":"Enable Dashboard Creation","description":"Allow users to create new Kadence Security Dashboards.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"password-requirements":{"title":"Password Requirements","type":"object","properties":{"requirement_settings.strength.group":{"title":"Strong Passwords","description":"Require strong passwords approved by the WordPress password strength meter.","type":"boolean","context":["view","edit","embed"]},"requirement_settings.hibp.group":{"title":"Refuse Compromised Passwords","description":"Reject passwords that have appeared in password breaches tracked by haveibeenpwned.com. This is a secure API call that does not transmit complete, unhashed passwords.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"include":{"type":"array","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/user-matchable-settings"}]}},"\/ithemes-security\/v1\/user-matchable-settings\/(?P<id>.*)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"global":{"title":"Global Settings","type":"object","properties":{"manage_group":{"title":"Manage Kadence Security","description":"Allow users to manage Kadence Security.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"dashboard":{"title":"Security Dashboard","type":"object","properties":{"group":{"title":"Enable Dashboard Creation","description":"Allow users to create new Kadence Security Dashboards.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"password-requirements":{"title":"Password Requirements","type":"object","properties":{"requirement_settings.strength.group":{"title":"Strong Passwords","description":"Require strong passwords approved by the WordPress password strength meter.","type":"boolean","context":["view","edit","embed"]},"requirement_settings.hibp.group":{"title":"Refuse Compromised Passwords","description":"Reject passwords that have appeared in password breaches tracked by haveibeenpwned.com. This is a secure API call that does not transmit complete, unhashed passwords.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false}}}]},"\/ithemes-security\/v1\/strong-passwords\/scan":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/strong-passwords\/scan"}]}},"\/ithemes-security\/v1\/strong-passwords\/scan\/(?P<id>[\\d]+)\/mute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/strong-passwords\/scan\/(?P<id>[\\d]+)\/unmute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/site-scanner\/scans":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"code":{"type":"array","items":{"type":"string"},"required":false},"before":{"type":"string","format":"date-time","required":false},"after":{"type":"string","format":"date-time","required":false}}},{"methods":["POST"],"args":{"site_id":{"type":"integer","default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/site-scanner\/scans"}]}},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P<id>\\d+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P<scan_id>\\d+)\/issues":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"entry":{"type":"array","items":{"type":"string","enum":["vulnerabilities","blacklist","malware"]},"required":false},"scan_id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P<scan_id>\\d+)\/issues\/(?P<issue_id>[\\w_-]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"scan_id":{"type":"integer","required":false},"issue_id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P<scan_id>\\d+)\/issues\/(?P<issue_id>[\\w_-]+)\/fix":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"scan_id":{"type":"integer","required":false},"issue_id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/muted-issues":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"id":{"type":"string","required":false},"muted_by":{"type":"integer","required":false},"muted_at":{"type":"string","format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/site-scanner\/muted-issues"}]}},"\/ithemes-security\/v1\/site-scanner\/muted-issues\/(?P<id>[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"resolution":{"type":"array","items":{"type":"string","enum":["","unresolved","patched","muted","deactivated","deleted","updated","auto-updated"]},"required":false},"software_type":{"type":"array","items":{"type":"string","enum":["plugin","theme","wordpress"]},"required":false},"patchable":{"type":"boolean","required":false},"first_seen_after":{"type":"string","format":"date-time","required":false},"first_seen_before":{"type":"string","format":"date-time","required":false},"last_seen_after":{"type":"string","format":"date-time","required":false},"last_seen_before":{"type":"string","format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/site-scanner\/vulnerabilities"}]}},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P<id>[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P<id>[\\w-]+)\/mute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P<id>[\\w-]+)\/unmute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P<id>[\\w-]+)\/fix":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P<id>[\\w-]+)\/deactivate-software":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/verify-scan":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"secret":{"type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/ithemes-security\/v1\/site-scanner\/verify-scan"}]}},"\/jetpack\/v4\/stats-app":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack\/v4\/stats-app","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/(?P<resource>[\\-\\w]+)\/(?P<resource_id>[\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/(?P<resource>[\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/posts\/(?P<resource_id>[\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/posts\/(?P<resource_id>[\\d]+)\/likes":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/stats"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/site-has-never-published-post":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/site-has-never-published-post"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/posts":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/posts"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/subscribers\/counts":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/subscribers\/counts"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats\/usage":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats\/usage"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats\/user-feedback":{"namespace":"jetpack\/v4\/stats-app","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats\/user-feedback"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/wordads\/earnings":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/wordads\/earnings"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/wordads\/stats":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/wordads\/stats"}]}},"\/jetpack\/v4\/stats-app\/stats\/notices":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","description":"ID of the notice","required":true},"status":{"type":"string","description":"Status of the notice","required":true},"postponed_for":{"type":"number","default":null,"description":"Postponed for (in seconds)","minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/stats\/notices"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats-dashboard\/notices":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","description":"ID of the notice","required":true},"status":{"type":"string","description":"Status of the notice","required":true},"postponed_for":{"type":"number","default":null,"description":"Postponed for (in seconds)","minimum":0,"required":false}}},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats-dashboard\/notices"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/referrers\/spam":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/referrers\/spam"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/referrers\/spam\/new":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"domain":{"type":"string","description":"Domain of the referrer","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/referrers\/spam\/new"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/referrers\/spam\/delete":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"domain":{"type":"string","description":"Domain of the referrer","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/referrers\/spam\/delete"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats-dashboard\/modules":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats-dashboard\/modules"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats-dashboard\/module-settings":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/jetpack-stats-dashboard\/module-settings"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/emails\/(?P<resource>[\\-\\w\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/opens\/emails\/(?P<post_id>[\\d]+)\/(?P<resource>[\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/clicks\/emails\/(?P<post_id>[\\d]+)\/(?P<resource>[\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/(?P<resource>[\\-\\w]+)\/emails\/(?P<post_id>[\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/utm\/(?P<utm_params>[_,\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/devices\/(?P<device_property>[\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/256915283\/commercial-classification":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/commercial-classification"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/purchases":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/stats-app\/sites\/256915283\/purchases"}]}},"\/jetpack\/v4\/stats-app\/sites\/256915283\/stats\/location-views\/(?P<geo_mode>country|region|city)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/wpcom\/v2":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpcom\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2"}]}},"\/wpcom\/v2\/videopress\/meta":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The post ID for the attachment.","type":"integer","required":true},"title":{"description":"The title of the video.","type":"string","required":false},"description":{"description":"The description of the video.","type":"string","required":false},"caption":{"description":"The caption of the video.","type":"string","required":false},"rating":{"description":"The video content rating. One of G, PG-13, or R-17","type":"string","required":false},"display_embed":{"description":"Display the share menu in the player.","type":"boolean","required":false},"allow_download":{"description":"Display download option and allow viewers to download this video","type":"boolean","required":false},"privacy_setting":{"description":"How to determine if the video should be public or private","type":"integer","enum":[0,1,2],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/videopress\/meta"}]}},"\/wpcom\/v2\/videopress\/(?P<video_guid>[A-Za-z0-9]{8})\/poster":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"video_guid":{"description":"The VideoPress GUID.","type":"string","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"video_guid":{"description":"The VideoPress GUID.","type":"string","required":true},"at_time":{"description":"The time in the video to use as the poster frame.","type":"integer","required":false},"is_millisec":{"description":"Whether the time is in milliseconds or seconds.","type":"boolean","required":false},"poster_attachment_id":{"description":"The attachment id of the poster image.","type":"integer","required":false}}}]},"\/wpcom\/v2\/videopress\/(?P<video_guid>[A-Za-z0-9]{8})\/check-ownership\/(?P<post_id>\\d+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"video_guid":{"description":"The VideoPress GUID.","type":"string","required":true},"post_id":{"description":"The post ID for the attachment.","type":"integer","required":true}}}]},"\/wpcom\/v2\/videopress\/upload-jwt":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/videopress\/upload-jwt"}]}},"\/wpcom\/v2\/videopress\/playback-jwt\/(?P<video_guid>[A-Za-z0-9]{8})":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"video_guid":{"description":"The VideoPress GUID.","type":"string","required":true},"post_id":{"description":"The post the video is embedded in, used to authorise access.","type":"integer","required":false},"subscription_plan_id":{"description":"The subscription plan the premium-content block gating the video uses.","type":"integer","required":false}}}]},"\/wpcom\/v2\/videopress\/settings":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"videopress_videos_private_for_site":{"description":"If the VideoPress videos should be private by default","type":"boolean","required":false},"videopress_auto_subtitles_disabled":{"description":"If auto-generated subtitles should be skipped for new videos","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/videopress\/settings"}]}},"\/wpcom\/v2\/videopress\/promote\/(?P<attachment_id>\\d+)":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"attachment_id":{"description":"The attachment id of the video to promote.","type":"integer","required":true}}}]},"\/wpcom\/v2\/videopress\/caption-tracks":{"namespace":"wpcom\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"guid":{"description":"VideoPress GUID.","type":"string","required":true}}},{"methods":["POST"],"args":{"guid":{"description":"VideoPress GUID.","type":"string","required":false},"title":{"description":"Caption track title.","type":"string","required":false},"content":{"description":"Serialised caption-cue block content.","type":"string","required":false},"status":{"description":"Caption track status.","type":"string","enum":["draft","publish"],"required":false},"meta":{"description":"Caption track metadata.","type":"object","properties":{"_videopress_guid":{"type":"string"},"_videopress_caption_kind":{"type":"string"},"_videopress_caption_src_lang":{"type":"string"},"_videopress_caption_label":{"type":"string"},"_videopress_source_track_kind":{"type":"string"},"_videopress_source_track_src_lang":{"type":"string"},"_videopress_source_track_src":{"type":"string"}},"additionalProperties":false,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/videopress\/caption-tracks"}]}},"\/wpcom\/v2\/videopress\/caption-tracks\/(?P<id>\\d+)":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Caption track ID.","type":"integer","required":true},"guid":{"description":"VideoPress GUID.","type":"string","required":false},"title":{"description":"Caption track title.","type":"string","required":false},"content":{"description":"Serialised caption-cue block content.","type":"string","required":false},"status":{"description":"Caption track status.","type":"string","enum":["draft","publish"],"required":false},"meta":{"description":"Caption track metadata.","type":"object","properties":{"_videopress_guid":{"type":"string"},"_videopress_caption_kind":{"type":"string"},"_videopress_caption_src_lang":{"type":"string"},"_videopress_caption_label":{"type":"string"},"_videopress_source_track_kind":{"type":"string"},"_videopress_source_track_src_lang":{"type":"string"},"_videopress_source_track_src":{"type":"string"}},"additionalProperties":false,"required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Caption track ID.","type":"integer","required":true}}}]},"\/jetpack-boost\/v1":{"namespace":"jetpack-boost\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack-boost\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack-boost\/v1"}]}},"\/jetpack-boost\/v1\/speed-scores":{"namespace":"jetpack-boost\/v1","methods":["POST","PUT","PATCH","POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack-boost\/v1\/speed-scores"}]}},"\/jetpack-boost\/v1\/speed-scores\/refresh":{"namespace":"jetpack-boost\/v1","methods":["POST","PUT","PATCH","POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack-boost\/v1\/speed-scores\/refresh"}]}},"\/jetpack-boost\/v1\/speed-scores-history":{"namespace":"jetpack-boost\/v1","methods":["POST","PUT","PATCH","POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"start":{"type":"number","required":true},"end":{"type":"number","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"start":{"type":"number","required":true},"end":{"type":"number","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack-boost\/v1\/speed-scores-history"}]}},"\/my-jetpack\/v1":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"my-jetpack\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1"}]}},"\/my-jetpack\/v1\/site\/products":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"products":{"description":"Comma-separated list of product slugs that should be retrieved.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/products"}]}},"\/my-jetpack\/v1\/site\/products\/install":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"products":{"description":"Array of Product slugs","type":"array","items":{"enum":["anti-spam","backup","boost","crm","creator","extras","jetpack-ai","ai","scan","search","social","security","protect","videopress","stats","growth","complete","newsletter","site-accelerator","related-posts","jetpack-forms"],"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/products\/install"}]}},"\/my-jetpack\/v1\/site\/products\/activate":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"products":{"description":"Array of Product slugs","type":"array","items":{"enum":["anti-spam","backup","boost","crm","creator","extras","jetpack-ai","ai","scan","search","social","security","protect","videopress","stats","growth","complete","newsletter","site-accelerator","related-posts","jetpack-forms"],"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/products\/activate"}]}},"\/my-jetpack\/v1\/site\/products\/interstitials":{"namespace":"my-jetpack\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"products":{"description":"Key-value pairs of product slugs and their interstitial states.","type":"object","properties":{"anti-spam":{"type":"boolean"},"backup":{"type":"boolean"},"boost":{"type":"boolean"},"crm":{"type":"boolean"},"creator":{"type":"boolean"},"extras":{"type":"boolean"},"jetpack-ai":{"type":"boolean"},"ai":{"type":"boolean"},"scan":{"type":"boolean"},"search":{"type":"boolean"},"social":{"type":"boolean"},"security":{"type":"boolean"},"protect":{"type":"boolean"},"videopress":{"type":"boolean"},"stats":{"type":"boolean"},"growth":{"type":"boolean"},"complete":{"type":"boolean"},"newsletter":{"type":"boolean"},"site-accelerator":{"type":"boolean"},"related-posts":{"type":"boolean"},"jetpack-forms":{"type":"boolean"}},"additionalProperties":false,"minProperties":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/products\/interstitials"}]}},"\/my-jetpack\/v1\/site\/products\/deactivate":{"namespace":"my-jetpack\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"products":{"description":"Array of Product slugs","type":"array","items":{"enum":["anti-spam","backup","boost","crm","creator","extras","jetpack-ai","ai","scan","search","social","security","protect","videopress","stats","growth","complete","newsletter","site-accelerator","related-posts","jetpack-forms"],"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/products\/deactivate"}]}},"\/my-jetpack\/v1\/site\/products-ownership":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/products-ownership"}]}},"\/my-jetpack\/v1\/site\/purchases":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/purchases"}]}},"\/my-jetpack\/v1\/chat\/availability":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/chat\/availability"}]}},"\/my-jetpack\/v1\/chat\/authentication":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"test_mode":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/chat\/authentication"}]}},"\/my-jetpack\/v1\/site\/recommendations\/evaluation":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/recommendations\/evaluation"}]}},"\/my-jetpack\/v1\/site\/recommendations\/evaluation\/result":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/recommendations\/evaluation\/result"}]}},"\/my-jetpack\/v1\/site\/backup\/undo-event":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/backup\/undo-event"}]}},"\/my-jetpack\/v1\/site\/protect\/data":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/protect\/data"}]}},"\/my-jetpack\/v1\/site\/videopress\/data":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/videopress\/data"}]}},"\/my-jetpack\/v1\/site\/update-historically-active-modules":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/update-historically-active-modules"}]}},"\/my-jetpack\/v1\/jetpack-manage\/data":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/jetpack-manage\/data"}]}},"\/my-jetpack\/v1\/red-bubble-notifications":{"namespace":"my-jetpack\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"dismissal_cookies":{"type":"array","description":"Array of dismissal cookies to set for the red bubble notifications.","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/red-bubble-notifications"}]}},"\/my-jetpack\/v1\/site":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site"}]}},"\/my-jetpack\/v1\/site\/dismiss-welcome-banner":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/my-jetpack\/v1\/site\/dismiss-welcome-banner"}]}},"\/jetpack\/v4\/explat":{"namespace":"jetpack\/v4\/explat","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack\/v4\/explat","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/explat"}]}},"\/jetpack\/v4\/explat\/assignments":{"namespace":"jetpack\/v4\/explat","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"experiment_name":{"type":"string","required":false},"anon_id":{"type":"string","required":false},"as_connected_user":{"type":"boolean","required":false},"platform":{"type":"string","enum":["jetpack","calypso","wpcom"],"default":"jetpack","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/explat\/assignments"}]}},"\/wpcom\/v2\/business-hours\/localized-week":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/business-hours\/localized-week"}]}},"\/wpcom\/v2\/admin-bar":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/admin-bar"}]}},"\/wpcom\/v2\/admin-color":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/admin-color"}]}},"\/wpcom\/v2\/admin-menu":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/admin-menu"}]}},"\/wpcom\/v2\/jetpack-ai\/ai-assistant-feature":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/jetpack-ai\/ai-assistant-feature"}]}},"\/wpcom\/v2\/app-media":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"description":"Number of media items in the request","type":"number","default":20,"required":false},"page_handle":{"type":"number","default":1,"required":false},"after":{"description":"Timestamp since the media was uploaded","type":"number","default":0,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/app-media"}]}},"\/wpcom\/v2\/application-password-extras\/abilities":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/application-password-extras\/abilities"}]}},"\/wpcom\/v2\/application-password-extras\/admin-ajax":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/application-password-extras\/admin-ajax"}]}},"\/wpcom\/v2\/editor-assets":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"exclude":{"description":"Comma-separated list of asset types to exclude from the response. Supported values: \"core\" (WordPress core assets), \"gutenberg\" (Gutenberg plugin assets), or plugin handle prefixes (e.g., \"contact-form-7\").","type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/editor-assets"}]}},"\/wpcom\/v2\/blog-stats":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_id":{"description":"Post ID to obtain stats for.","type":["string","integer"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/blog-stats"}]}},"\/wpcom\/v2\/email-preview":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"access":{"description":"Access level.","enum":["everybody","subscribers","paid_subscribers"],"default":"everybody","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/email-preview"}]}},"\/wpcom\/v2\/external-media\/list\/(?P<service>google_photos|openverse|pexels)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"description":"Media collection search term.","type":"string","required":false},"number":{"description":"Number of media items in the request","type":"number","default":20,"required":false},"path":{"type":"string","required":false},"page_handle":{"type":"string","required":false},"session_id":{"description":"Session id of a service, currently only Google Photos Picker","type":"string","required":false}}}]},"\/wpcom\/v2\/external-media\/copy\/(?P<service>google_photos|openverse|pexels)":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"media":{"description":"Media data to copy.","items":{"type":"array","items":{"type":"object","required":true,"properties":{"caption":{"type":"string"},"guid":{"type":"object","properties":{"caption":{"type":"string"},"name":{"type":"string"},"title":{"type":"string"},"url":{"format":"uri","type":"string"}}},"title":{"type":"string"},"meta":{"type":"object","additionalProperties":false,"properties":{"vertical_id":{"type":"string","format":"text-field"},"pexels_object":{"type":"object"}}}}}},"type":"array","required":true},"post_id":{"description":"The post ID to attach the upload to.","type":"number","minimum":0,"required":false},"should_proxy":{"description":"Whether to proxy the media request.","type":"boolean","default":false,"required":false}}}]},"\/wpcom\/v2\/external-media\/connection\/(?P<service>google_photos)":{"namespace":"wpcom\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2\/external-media\/connection\/(?P<service>google_photos)\/picker_status":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/wpcom\/v2\/external-media\/session\/(?P<service>google_photos)":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/wpcom\/v2\/external-media\/session\/(?P<service>google_photos)\/(?P<session_id>.*)":{"namespace":"wpcom\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2\/external-media\/proxy\/(?P<service>google_photos)":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"url":{"type":"string","required":true}}}]},"\/wpcom\/v2\/following\/mine":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ignore_user_blogs":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/following\/mine"}]}},"\/wpcom\/v2\/following\/recommendations":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"type":"number","default":5,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/following\/recommendations"}]}},"\/wpcom\/v2\/goodreads\/user-id":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Goodreads user ID","type":"integer","minimum":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/goodreads\/user-id"}]}},"\/wpcom\/v2\/checkGoogleDocVisibility":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/checkGoogleDocVisibility"}]}},"\/wpcom\/v2\/instagram-gallery\/connect-url":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/instagram-gallery\/connect-url"}]}},"\/wpcom\/v2\/instagram-gallery\/connections":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/instagram-gallery\/connections"}]}},"\/wpcom\/v2\/instagram-gallery\/gallery":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"access_token":{"description":"An Instagram Keyring access token.","type":"integer","minimum":1,"required":true},"count":{"description":"How many Instagram posts?","type":"integer","minimum":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/instagram-gallery\/gallery"}]}},"\/wpcom\/v2\/mailchimp":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/mailchimp"}]}},"\/wpcom\/v2\/mailchimp\/groups":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/mailchimp\/groups"}]}},"\/wpcom\/v2\/mailchimp\/settings":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/mailchimp\/settings"}]}},"\/wpcom\/v2\/jetpack-ai\/mcp-settings":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"mcp_abilities":{"type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/jetpack-ai\/mcp-settings"}]}},"\/wpcom\/v2\/newsletter-categories":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/newsletter-categories"}]}},"\/wpcom\/v2\/newsletter-categories\/count":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term_ids":{"default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/newsletter-categories\/count"}]}},"\/wpcom\/v2\/newsletter-categories\/subscriptions\/(?P<subscription_id>[0-9]+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"subscription_id":{"required":true},"type":{"required":false}}}]},"\/wpcom\/v2\/newsletter-email-sent-status":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_id":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/newsletter-email-sent-status"}]}},"\/wpcom\/v2\/podcast-player":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The Podcast RSS Feed URL.","type":"string","required":true},"guids":{"description":"A list of unique identifiers for fetching specific podcast episodes.","type":"array","required":true},"episode-options":{"description":"Whether we should return the episodes list for use in the selection UI","type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/podcast-player"}]}},"\/wpcom\/v2\/podcast-player\/track-quantity":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/podcast-player\/track-quantity"}]}},"\/wpcom\/v2\/profile":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/profile"}]}},"\/wpcom\/v2\/related-posts":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/related-posts"}]}},"\/wpcom\/v2\/related-posts\/enable":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/related-posts\/enable"}]}},"\/wpcom\/v2\/related-posts\/(?P<id>[\\d]+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false}}}]},"\/wpcom\/v2\/resolve-redirect\/?(?P<url>.+)?":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to check for redirects.","type":"string","required":true}}}]},"\/wpcom\/v2\/search":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/search"}]}},"\/wpcom\/v2\/send-email-preview":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"email":{"description":"Optional recipient address. Defaults to the current user. A different address is only accepted from users who may add subscribers, and is subject to the same abuse checks.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/send-email-preview"}]}},"\/wpcom\/v2\/subscribers\/add":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"emails":{"type":"array","items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/add"}]}},"\/wpcom\/v2\/subscribers\/remove":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"user_id":{"type":"integer","default":0,"minimum":0,"required":false},"email_subscription_id":{"type":"integer","default":0,"minimum":0,"required":false},"paid_subscription_ids":{"type":"array","items":{"type":"string"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/remove"}]}},"\/wpcom\/v2\/subscribers\/individual":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"subscription_id":{"type":"integer","default":0,"minimum":0,"required":false},"user_id":{"type":"integer","default":0,"minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/individual"}]}},"\/wpcom\/v2\/subscribers\/individual-stats":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"subscription_id":{"type":"integer","default":0,"minimum":0,"required":false},"user_id":{"type":"integer","default":0,"minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/individual-stats"}]}},"\/wpcom\/v2\/subscribers\/import":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/import"}]}},"\/wpcom\/v2\/subscribers\/import\/reset-state":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/import\/reset-state"}]}},"\/wpcom\/v2\/subscribers\/totals":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/totals"}]}},"\/wpcom\/v2\/subscribers\/list":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","default":1,"minimum":1,"required":false},"per_page":{"type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"sort":{"type":"string","default":"date_subscribed","enum":["date_subscribed","name","plan","subscription_status"],"required":false},"sort_order":{"type":"string","default":"desc","enum":["asc","desc"],"required":false},"search":{"type":"string","default":"","required":false},"filters":{"type":"array","items":{"type":"string"},"default":["all"],"required":false},"use_new_helper":{"type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/list"}]}},"\/wpcom\/v2\/subscribers\/products":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/products"}]}},"\/wpcom\/v2\/subscribers\/comp":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"user_id":{"type":"integer","minimum":1,"required":true},"plan_id":{"type":"integer","minimum":1,"required":true},"no_expiration":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/comp"}]}},"\/wpcom\/v2\/subscribers\/remove-comp":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"comp_id":{"type":"integer","minimum":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/remove-comp"}]}},"\/wpcom\/v2\/template-loader\/(?P<template_type>\\w+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"template_type":{"description":"The type of the template.","type":"string","required":true}}}]},"\/wpcom\/v2\/post-types":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/post-types"}]}},"\/wpcom\/v2\/top-posts":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"description":"Timeframe for stats.","type":["string","integer"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/top-posts"}]}},"\/wpcom\/v2\/transients\/(?P<name>\\w{1,172})":{"namespace":"wpcom\/v2","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"name":{"description":"The name of the transient to delete.","type":"string","required":true}}}]},"\/wpcom\/v3":{"namespace":"wpcom\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpcom\/v3","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v3"}]}},"\/wpcom\/v3\/blogging-prompts":{"namespace":"wpcom\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"after":{"description":"Show prompts following a given date.","type":"string","required":false},"before":{"description":"Show prompts before a given date.","type":"string","required":false},"force_year":{"description":"Force the returned prompts to be for a specific year. Returns only one prompt for each day.","type":"integer","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v3\/blogging-prompts"}]}},"\/wpcom\/v3\/blogging-prompts\/(?P<id>[\\d]+)":{"namespace":"wpcom\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the prompt.","type":"integer","required":false}}}]},"\/wpcom\/v3\/jitm":{"namespace":"wpcom\/v3","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"message_path":{"type":"string","description":"The message path to fetch JITMs for","required":true},"query":{"type":"string","description":"Additional query parameters","required":false},"full_jp_logo_exists":{"type":"boolean","description":"Whether the full Jetpack logo exists","required":false}}},{"methods":["POST"],"args":{"id":{"type":"string","description":"The ID of the JITM to dismiss","required":true},"feature_class":{"type":"string","description":"The feature class of the JITM","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v3\/jitm"}]}},"\/wpcom\/v2\/gutenberg\/available-extensions":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/gutenberg\/available-extensions"}]}},"\/wpcom\/v2\/hello":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/hello"}]}},"\/wpcom\/v2\/memberships\/status\/?":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"source":{"type":"string","required":false},"is_editable":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/memberships\/status\/?"}]}},"\/wpcom\/v2\/memberships\/product\/?":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"title":{"type":"string","required":true},"price":{"type":"number","required":true},"currency":{"type":"string","required":true},"interval":{"type":"string","required":true},"is_editable":{"type":"boolean","required":false},"buyer_can_change_amount":{"type":"boolean","required":false},"tier":{"type":"integer","required":false},"description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/memberships\/product\/?"}]}},"\/wpcom\/v2\/memberships\/products\/?":{"namespace":"wpcom\/v2","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"currency":{"type":"string","required":true},"type":{"type":"string","required":true},"is_editable":{"type":"boolean","required":false}}},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/memberships\/products\/?"}]}},"\/wpcom\/v2\/memberships\/product\/(?P<product_id>[0-9]+)\/?":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"title":{"type":"string","required":true},"price":{"type":"number","required":true},"currency":{"type":"string","required":true},"interval":{"type":"string","required":true},"is_editable":{"type":"boolean","required":false},"buyer_can_change_amount":{"type":"boolean","required":false},"tier":{"type":"integer","required":false},"description":{"type":"string","required":false}}},{"methods":["DELETE"],"args":{"cancel_subscriptions":{"type":"boolean","required":false}}}]},"\/wpcom\/v2\/publicize\/connection-test-results":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/publicize\/connection-test-results"}]}},"\/wpcom\/v2\/service-api-keys\/(?P<service>[a-z\\-_]+)":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"service_api_key":{"type":"string","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2\/subscribers\/count":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/count"}]}},"\/wpcom\/v2\/subscribers\/counts":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wpcom\/v2\/subscribers\/counts"}]}},"\/elementor\/v1\/library\/connect":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","description":"Connect CLI token","required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/library\/connect"}]}},"\/elementor\/v1\/send-event":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"event_data":{"description":"All the recorded event data in JSON format","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/elementor\/v1\/send-event"}]}},"\/jetpack\/v4\/verify_registration":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/verify_registration"}]}},"\/jetpack\/v4\/remote_authorize":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/remote_authorize"}]}},"\/jetpack\/v4\/remote_provision":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/remote_provision"}]}},"\/jetpack\/v4\/remote_register":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/remote_register"}]}},"\/jetpack\/v4\/remote_connect":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/remote_connect"}]}},"\/jetpack\/v4\/connection\/check":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/check"}]}},"\/jetpack\/v4\/connection\/test":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/test"}]}},"\/jetpack\/v4\/connection\/test-wpcom":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/test-wpcom"}]}},"\/jetpack\/v4\/connection":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"isActive":{"description":"Set to false will trigger the site to disconnect.","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection"}]}},"\/jetpack\/v4\/connection\/user":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/user"}]}},"\/jetpack\/v4\/connection\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/data"}]}},"\/jetpack\/v4\/connection\/plugins":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/plugins"}]}},"\/jetpack\/v4\/connection\/reconnect":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/reconnect"}]}},"\/jetpack\/v4\/connection\/register":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"from":{"description":"Indicates where the registration action was triggered for tracking\/segmentation purposes","type":"string","required":false},"redirect_uri":{"description":"URI of the admin page where the user should be redirected after connection flow","type":"string","required":false},"plugin_slug":{"description":"Indicates from what plugin the request is coming","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/register"}]}},"\/jetpack\/v4\/connection\/authorize_url":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"redirect_uri":{"description":"URI of the admin page where the user should be redirected after connection flow","type":"string","required":false},"from":{"description":"Tracking\/segmentation identifier for this authorise URL request","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/authorize_url"}]}},"\/jetpack\/v4\/user-token":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"user_token":{"description":"New user token","type":"string","required":true},"is_connection_owner":{"description":"Is connection owner","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/user-token"}]}},"\/jetpack\/v4\/connection\/owner":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"owner":{"description":"New owner","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/jetpack\/v4\/connection\/owner"}]}},"\/mcp":{"namespace":"mcp","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mcp","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/mcp"}]}},"\/mcp\/mcp-oauth-server":{"namespace":"mcp","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/mcp\/mcp-oauth-server"}]}},"\/mcp\/mcp-adapter-default-server":{"namespace":"mcp","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/mcp\/mcp-adapter-default-server"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items, except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items, except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"_jetpack_newsletter_access":{"type":"string","title":"","description":"","default":""},"_jetpack_dont_email_post_to_subs":{"type":"boolean","title":"","description":"","default":false},"_jetpack_newsletter_tier_id":{"type":"integer","title":"","description":"","default":0},"_jetpack_memberships_contains_paywalled_content":{"type":"boolean","title":"","description":"","default":false},"_jetpack_memberships_contains_paid_content":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the object in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the object in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"_jetpack_newsletter_access":{"type":"string","title":"","description":"","default":""},"_jetpack_dont_email_post_to_subs":{"type":"boolean","title":"","description":"","default":false},"_jetpack_newsletter_tier_id":{"type":"integer","title":"","description":"","default":0},"_jetpack_memberships_contains_paywalled_content":{"type":"boolean","title":"","description":"","default":false},"_jetpack_memberships_contains_paid_content":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the object in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the object in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"_jetpack_newsletter_access":{"type":"string","title":"","description":"","default":""},"_jetpack_dont_email_post_to_subs":{"type":"boolean","title":"","description":"","default":false},"_jetpack_newsletter_tier_id":{"type":"integer","title":"","description":"","default":0},"_jetpack_memberships_contains_paywalled_content":{"type":"boolean","title":"","description":"","default":false},"_jetpack_memberships_contains_paid_content":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the object in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the object in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"generate_sub_sizes":{"type":"boolean","default":true,"description":"Whether to generate image sub sizes.","required":false},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"url":{"type":"string","format":"uri","description":"URL of an external image to sideload into the media library, instead of uploading a file.","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position from which to start the crop. DEPRECATED: use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position from which to start the crop. DEPRECATED: use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to which to crop the image. DEPRECATED: use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to which to crop the image. DEPRECATED: use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/sideload":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"image_size":{"description":"Image size. Can be a single size name or an array of size names to register the same file under multiple sizes.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/finalize":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"sub_sizes":{"description":"Array of sub-size metadata collected from sideload responses.","type":"array","default":[],"maxItems":100,"items":{"type":"object","properties":{"image_size":{"description":"Size name, or an array of size names when a single file is registered under multiple sizes with matching dimensions.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"width":{"type":"integer","minimum":1},"height":{"type":"integer","minimum":1},"file":{"type":"string","minLength":1},"mime_type":{"type":"string","pattern":"^image\/.*"},"filesize":{"type":"integer","minimum":1},"original_image":{"type":"string","minLength":1}}},"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items, except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items, except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the object in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the object in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the object in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post ID.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type for which to get the templates.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post ID.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type for which to get the templates.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The ID of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/elementor_library":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/elementor_library"}]}},"\/wp\/v2\/elementor_library\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"jetpack_sharing_enabled":{"description":"Are sharing buttons enabled?","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support binning.","required":false}}}]},"\/wp\/v2\/elementor_snippet":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_elementor_location":{"type":"string","title":"","description":"","default":"elementor_head","enum":["elementor_head","elementor_body_start","elementor_body_end"]},"_elementor_priority":{"type":"integer","title":"","description":"","default":1},"_elementor_code":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/elementor_snippet"}]}},"\/wp\/v2\/elementor_snippet\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_elementor_location":{"type":"string","title":"","description":"","default":"elementor_head","enum":["elementor_head","elementor_body_start","elementor_body_end"]},"_elementor_priority":{"type":"integer","title":"","description":"","default":1},"_elementor_code":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/activity-log-events":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/activity-log-events"}]}},"\/wp\/v2\/activity-log-events\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/activity-log-events\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/activity-log-events\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/jp_pay_order":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/jp_pay_order"}]}},"\/wp\/v2\/jp_pay_order\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/jp_pay_product":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","dp-rewrite-republish","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"spay_price":{"type":"number","title":"","description":"Simple payments; price.","default":0},"spay_currency":{"type":"string","title":"","description":"Simple payments; currency code.","default":""},"spay_cta":{"type":"string","title":"","description":"Simple payments; text with &quot;Buy&quot; or other CTA","default":""},"spay_multiple":{"type":"boolean","title":"","description":"Simple payments; allow multiple items","default":false},"spay_email":{"type":"string","title":"","description":"Simple payments button; paypal email.","default":""},"spay_status":{"type":"string","title":"","description":"Simple payments; status.","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/jp_pay_product"}]}},"\/wp\/v2\/jp_pay_product\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"spay_price":{"type":"number","title":"","description":"Simple payments; price.","default":0},"spay_currency":{"type":"string","title":"","description":"Simple payments; currency code.","default":""},"spay_cta":{"type":"string","title":"","description":"Simple payments; text with &quot;Buy&quot; or other CTA","default":""},"spay_multiple":{"type":"boolean","title":"","description":"Simple payments; allow multiple items","default":false},"spay_email":{"type":"string","title":"","description":"Simple payments button; paypal email.","default":""},"spay_status":{"type":"string","title":"","description":"Simple payments; status.","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false}}}]},"\/wp\/v2\/jp_pay_product\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's time zone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"spay_price":{"type":"number","title":"","description":"Simple payments; price.","default":0},"spay_currency":{"type":"string","title":"","description":"Simple payments; currency code.","default":""},"spay_cta":{"type":"string","title":"","description":"Simple payments; text with &quot;Buy&quot; or other CTA","default":""},"spay_multiple":{"type":"boolean","title":"","description":"Simple payments; allow multiple items","default":false},"spay_email":{"type":"string","title":"","description":"Simple payments button; paypal email.","default":""},"spay_status":{"type":"string","title":"","description":"Simple payments; status.","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/jp_pay_product\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support binning.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support binning.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top-level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top-level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support binning.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support binning.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","elementor_library":"elementor_library","elementor_snippet":"elementor_snippet","jp_act_log_event":"jp_act_log_event","jp_pay_order":"jp_pay_order","jp_pay_product":"jp_pay_product"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false},"solid_user_groups":{"type":"array","items":{"type":"string","format":"uuid"},"required":false},"solid_last_seen":{"type":"object","properties":{"after":{"type":"string","format":"date-time"},"before":{"type":"string","format":"date-time"}},"required":false},"solid_password_changed":{"type":"object","properties":{"after":{"type":"string","format":"date-time"},"before":{"type":"string","format":"date-time"}},"required":false},"solid_password_strength":{"type":"array","items":{"type":"integer","oneOf":[{"enum":[0],"title":"Very Weak"},{"enum":[1],"title":"Very Weak"},{"enum":[2],"title":"Weak"},{"enum":[3],"title":"Medium"},{"enum":[4],"title":"Strong"}]},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE","en_GB"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"_itsec_primary_dashboard":{"type":"integer","title":"","description":"","default":0,"context":["edit"]},"jetpack_donation_warning_dismissed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE","en_GB"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"_itsec_primary_dashboard":{"type":"integer","title":"","description":"","default":0,"context":["edit"]},"jetpack_donation_warning_dismissed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support binning.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE","en_GB"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"_itsec_primary_dashboard":{"type":"integer","title":"","description":"","default":0,"context":["edit"]},"jetpack_donation_warning_dismissed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support binning.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorisation.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorisation.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorisation.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorisation.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorisation.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's time zone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's time zone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Bin and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","elementor_library","category","post_tag","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"hello_elementor_settings_description_meta_tag":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_skip_link":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_header_footer":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_page_title":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_hello_style":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_hello_theme":{"title":"","description":"","type":"string","required":false},"jetpack_ai_agents_enabled":{"title":"","description":"Whether AI Agent Access is enabled on this site.","type":"boolean","required":false},"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"elementor_one_welcome_screen_completed":{"title":"","description":"Elementor One Welcome Screen Completed","type":"boolean","required":false},"elementor_one_dismiss_connect_alert":{"title":"","description":"Elementor One Dismiss Connect Alert","type":"boolean","required":false},"elementor_one_dismiss_elementor_one_subscription_alert":{"title":"","description":"Elementor One Dismiss Elementor One Subscription Alert","type":"boolean","required":false},"jetpack_search_ai_behavior_instructions":{"title":"","description":"","type":"string","required":false},"ea11y_widget_menu_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_widget_icon_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_skip_to_content_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_widget_activation_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_plan_data":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_accessibility_statement_data":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_close_post_connect_modal":{"title":"","description":"","type":"boolean","required":false},"ea11y_hide_minimum_active_options_alert":{"title":"","description":"","type":"boolean","required":false},"ea11y_analytics_enabled":{"title":"","description":"","type":"boolean","required":false},"ea11y_show_accessibility_generated_page_infotip":{"title":"","description":"","type":"boolean","required":false},"ea11y_unfiltered_files_upload":{"title":"","description":"","type":"boolean","required":false},"ea11y_close_onboarding_modal":{"title":"","description":"","type":"boolean","required":false},"ea11y_close_get_started_modal":{"title":"","description":"","type":"boolean","required":false},"ea11y_migration_popup_dismissed":{"title":"","description":"","type":"boolean","required":false},"ea11y_dismissed_quota_notices":{"title":"","description":"","type":"array","items":{"type":"string"},"required":false},"ea11y_review_data":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"cookie_consent_template":{"title":"","description":"","type":"string","required":false},"Blogroll Recommendations":{"title":"","description":"Site Recommendations","type":"array","items":{"type":"object","properties":{"id":{"type":"string","format":"text-field"},"name":{"type":"string","format":"text-field"},"icon":{"type":"string","format":"uri"},"url":{"type":"string","format":"uri"},"description":{"type":"string","format":"text-field"},"is_non_wpcom_site":{"type":"boolean"}},"additionalProperties":false},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's style sheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The ID of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type ID.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type ID.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialised widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type ID.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar for which to return widgets.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar to which the widget belongs.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar to which the widget belongs.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false},"namespace":{"description":"Limit results to abilities in a specific namespace.","type":"string","required":false},"meta":{"description":"Limit results to abilities matching all of the given meta fields.","type":"object","properties":{"annotations":{"description":"Limit results to abilities matching the given behavioural annotations.","type":"object","properties":{"readonly":{"description":"Whether the ability does not modify its environment.","type":["boolean","null"]},"destructive":{"description":"Whether the ability may perform destructive updates to its environment.","type":["boolean","null"]},"idempotent":{"description":"Whether repeated calls with the same arguments have no additional effect.","type":["boolean","null"]}},"additionalProperties":true}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]},"\/wp\/v2\/icons":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/icons"}]}},"\/wp\/v2\/icons\/(?P<collection>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}]},"\/wp\/v2\/icons\/(?P<name>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?\/[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Icon name.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/icon-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/icon-collections"}]}},"\/wp\/v2\/icon-collections\/(?P<slug>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Icon collection slug.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/view-config":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"description":"Entity kind.","type":"string","required":true},"name":{"description":"Entity name.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/view-config"}]}}},"site_logo":0,"site_icon":4777,"site_icon_url":"https:\/\/omegamounting.de\/wp-content\/uploads\/2021\/01\/favicon-256x256-1.png","multisite":false,"_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_icon","href":"https:\/\/omegamounting.de\/en\/wp-json\/wp\/v2\/media\/4777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}