Installing a triple pallet safety gate at a mezzanine edge

A tilting pallet gate (in the UK often called a mezzanine pallet safety gate) lets staff load pallets at a raised edge without stepping up to the drop. We installed a triple gate at a first-floor edge in a production plant. Goods are now handed down to the forklift route safely, and the old roller shutter is gone. 

You are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More information

You are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More information

The project: a triple gate at a first-floor edge

Project diary

Technical drawing of a tilting pallet gate at the edge of a work platform on the upper floor: base frame with heavy-duty anchors in the platform floor, pallet in the gate, forklift on the traffic route below and the old roller door shown dashed
Heavy-duty anchors keep the gate in place – even if a forklift or pallet truck bumps into it. The old roller door is no longer needed. Graphic: Omega Mounting

We installed a tilting pallet gate at an open edge on the first floor of a production plant. Goods can now be handed down safely to the traffic route below without anyone entering the danger zone.

We are regularly asked to install tilting pallet gates. Staff on the platform load the goods into the gate from a protected position.

The operator then closes the gate by hand, and only then can the forklift take the goods from outside. The operator works safely at height and never approaches the open edge.

Project profile

  • Client sector: Production plant
  • Scope: Triple tilting pallet gate installed at an open first-floor edge and fixed with heavy-duty anchors; existing roller shutter removed
  • Result: Pallets are handed down to the forklift route without anyone approaching the edge

The benefits

Technical drawing in top view: work platform with an operator, three tilting pallet gates at the platform edge, a danger zone without people and a forklift on the traffic route picking up a pallet from the middle gate
The operator loads on the platform, the forklift picks up outside – the gate sits in between. Graphic: Omega Mounting

Hand-over to the forklift is safer too: operator and forklift never meet, because the gate separates them.

Here we installed a triple gate. Staff can load one bay while the forklift unloads another, so production keeps flowing.

We fixed the gate to the floor with heavy-duty anchors, so it stays in place even if a forklift or pallet truck touches it.

Once the gates were in, the existing roller shutter was removed – it is no longer needed.

Technical drawing of a triple tilting pallet gate in three positions: open to the platform for loading, closed by hand in the middle, and open to the traffic route while the forklift forks pick up the pallet
While one gate is being loaded, the forklift picks up from another – the material flow keeps moving. Graphic: Omega Mounting

Safety and ergonomics

Explanatory graphic on handing over a pallet with a tilting pallet gate in four steps: load on the platform, close by hand, pick up with the forklift, tilt the gate back
Handover in four steps: the gate is only ever open to one side – people and forklift never meet. Graphic: Omega Mounting

The gate removes the most dangerous moment of pallet hand-over at height: no one leans over an open edge, and no one stands next to a working forklift. The gate is closed by hand before the forklift can take the load.

Space saving

A tilting pallet gate fits into an existing mezzanine edge with little extra space – here it replaced the old roller shutter.

We keep your production running