When it gets demanding, call us

Production at a standstill, a conversion against the clock, a machine that will not fit through the door: we are the team for the jobs where standard solutions are no longer enough.

Lifting AP
Lifting operations under our own responsibility
2012
founded in Rodgau near Frankfurt
24/7
Fitters on the job, DE & EN
161
online reviews

The crew that shows up when others run out of answers

Omega Mounting is an industrial installation company based in Rodgau near Frankfurt – with our own crew, our own equipment and our own workshop. We install, maintain, relocate and dismantle what others consider too heavy, too tight or too tightly scheduled.

Our clients come from data centres, logistics, aviation, energy, food production and the automotive industry. What they have in common: downtime costs them money, and deadlines are not a statement of intent.

You will not be put through a sales loop here – you get a technical answer from someone who has done the work himself.

You are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More information
A look at what we do – filmed on our own sites.

What is going on at your site?

Why data centres are our toughest proving ground

What is demanded there is the benchmark we apply to every project we take on.

Data centres are the toughest school our trade knows. The date is fixed months in advance, the main contractor checks every certificate, and in the whitespace the millimetre counts just as much as the signature on the inspection report.

We work there every day – on several sites at once in the Frankfurt area. We started out as riggers for a crane company. Today we plan and take responsibility for lifting operations ourselves and are listed in the subcontractor programmes of the major main contractors.

For you that means: what works in a data centre – safety, documentation, on-time delivery – is what we bring into your plant as well.

Our work in the data centre

Lifting AP

Lifting operations under our own responsibility: load calculation, sign-off, supervision on site.

Commissioning

We know the process from L0 to L5 and supply the documentation in the required format.

Eigener EHS-Standard

A bilingual set of rules based on DGUV, BetrSichV and TRBS – not just signed off, but written by us.

Projektsprache Englisch

On international sites, coordinating and documenting in English is part of our everyday work.

CRAH units, load banks, generators, transformers, PDCs, busbars and complete fan walls – moved in, set up, aligned and handed over.

We support your plant across its entire lifecycle

From delivery through installation, connection and maintenance to dismantling and relocation: seven phases, and just one point of contact for all of them – throughout Germany and across Europe.

Machine life cycle · installation · service · relocation Sieben Phasen,
ein Partner
From delivery to relocation – all from a single source.
PHASE 01

Delivery & logistics

  • Transport supervision and unloading
  • Site and floor-space logistics
  • Wareneingangskontrolle
PHASE 02

Moving in & rigging

  • Heavy loads, cranes and lifting equipment
  • Moving in through doorways and halls
  • Positioning at the installation point
PHASE 03

Foundation & alignment

  • Anchoring, shimming and doweling
  • Levelling and surveying
  • Measurement report and documentation
PHASE 04

Montage & Aufbau

  • Mechanical assembly of the modules
  • Pipework, pneumatics, hydraulics
  • Safety guards and panelling
PHASE 05

Anschluss & Inbetriebnahme

  • Electrical, utility and compressed-air connection
  • Probelauf, Einstellen, Feinjustage
  • Handover to production
PHASE 06

Operation & maintenance

  • Scheduled maintenance and breakdown service
  • Repair, retrofit, conversions
  • On-site personnel provision
PHASE 07

Dismantling & relocation

  • Decommissioning and disconnection
  • Dismantling, labelling, packing
  • Alignment and relocation to the new site

Six services that work together

Most of our jobs involve several of them – which is why you get everything from one source instead of four companies around one table.

These clients rely on us

Logo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega MountingLogo eines Kunden von Omega Mounting

This is only a selection. Many of our clients prefer not to be named publicly – in data centre construction in particular, that is the norm. We are happy to share further references in conversation, under a non-disclosure agreement if you wish. View all references and client feedback

What we have been working on

No marketing copy – documented jobs with photos, figures and what went wrong.

Because you need more than fitters

One contact who knows the work

You are not talking to a sales team but to someone who stands on the site himself. That is why you get a sound first assessment quickly.

Our own people, our own equipment

A permanently employed crew, our own vehicles and lifting equipment, our own workshop with machine tools. We do not depend on someone else picking up the phone on a Sunday.

Alle Gewerke in einem Team

Mechanics, electrics, hydraulics, pneumatics, controls. You are not coordinating four companies that blame each other.

We work when you stand still

At night, at weekends, on public holidays, during shutdowns. You set the time window and we work around it.

Evidence instead of promises

Appointed person for lifting operations, instructor and examiner qualifications, our own EHS standard, complete documentation. All of it verifiable.

Cause rather than symptom

We do not just hand over a list of findings. When we find a weak point, we tell you where it comes from – and fix it.

Tell us about your project

A short phone call is enough for a first assessment. The more we know in advance, the more specific it gets – feel free to send photos or drawings straight away.

100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt

Tobias Schott von Omega Mounting als Hebeaufsicht bei Nachtarbeit auf einer Industriebaustelle, im Hintergrund Turmdrehkrane und ein Container am Haken
Nachtschicht im Rhein-Main-Gebiet: Hebearbeiten unter zwei Turmdrehkranen, Container am Haken.
en_GBEnglish