- Performance
MAINTENANCE & SERVICING FOR INDUSTRIAL PLANT
Maintenance is not a tick-box exercise. We look for the cause, fix it during the same visit – and manufacture the spare part when it can no longer be bought.
Permanent on-site support available
years of experience with electric overhead conveyors
years of industrial installation
Fitters on the job – weekends included
- What it is about
GREASING IT ONLY REMOVES THE NOISE – NOT THE PROBLEM
Omega Mounting maintains and repairs industrial plant: electric overhead conveyors, conveying and sorting systems, cranes, standby power units, ventilation and refrigeration equipment. We come at fixed intervals, on findings or in an emergency – and in some plants we are permanently on site.
The difference lies in what happens after the service. A squeaking overhead conveyor is rarely a drive problem; usually the pins and bearing points have seized. Adding grease gets rid of the noise but not the fault. So we work on the cause and fix it during the same visit, with material and tools on board – instead of generating a second appointment and a second quotation.
And when a spare part is no longer available, maintenance does not stop there. We simply make it in our workshop in Rodgau.
Den Montageservice übernehmen dieselben Industriemonteure, die auch aufbauen und umsetzen – das spart die Einarbeitung in fremde Anlagen. Für die Dauerbetreuung stellen wir feste Montageteams, die Ihre Anlagen kennen, mit Rufbereitschaft auch am Wochenende und in der Nacht.
- Why us
FOUR REASONS WHY COMPANIES CALL US IN
Cause rather than symptom
We look for the reason, not just the symptom. On 80 overhead conveyor carriers at a food production plant it came down to pins and bearing points – greasing them would have removed the noise and left the wear to continue.
Repairs done at the same time
We do not just hand over a list of findings. Whatever can be fixed during the same visit, we fix – with material and tools on board. No second appointment, no second quotation.
Permanent on-site support
Where a system must not fail, we are there permanently: at Frankfurt Airport we look after a shoe sorter running 24/6 with several mechatronics engineers on site. Response time in minutes rather than hours.
Spare parts that no longer exist
On older plant, maintenance often fails at procurement. We manufacture pins, fitting pieces, reinforcements and brackets ourselves – instead of writing the plant off.
- Services
WHAT WE SERVICE AND REPAIR
Mechanics, electrics and welding in the same team – so that diagnosis and repair are not split between three companies.
Electric overhead conveyors
Over 15 years with overhead conveyors: refurbishing pins and bearing points, repair-welding rails and curves, overhauling hoists, cleaning conductor lines. Our maintenance checklist for electric overhead conveyors zeigt, worauf es dabei ankommt.
Conveying & sorting systems
Tilt trays, tilting airlocks, belt and roller conveyors, drive stations: finding wear before failure, replacing drives, eliminating faults for good.
Crane technology
Supporting recurring inspections, working through findings, overhauling trolleys and travel gear, adjusting rails and end stops.
Netzersatz & Generatoren
Servicing standby power units to the manufacturer’s specification, repairing coolers and radiators with pressure testing, test runs under realistic load.
Ventilation & refrigeration
Replacing fan bearings, overhauling drives, swapping precision air conditioning units in data centres – during live operation too. See our checklist for replacing CRAH units.
Spare part manufacture
Pins, bushes, fitting pieces, reinforcement plates and brackets from our own workshop – for plant whose manufacturer no longer supplies parts or no longer exists.
- Instandhaltungsstrategie
THREE ROUTES INTO MAINTENANCE
Most operations use all three – the question is in what proportion. The larger the planned share, the rarer the expensive third case.
Acting before it fails
A finding from an inspection or observation is dealt with before damage occurs. Plannable, but on a tighter schedule than regular maintenance.
Feste Intervalle, fester Preis
Recurring appointments to a maintenance schedule, with a report and list of findings for next time. The most economical route – because wear is found while it is still just wear.
When it has already stopped
WhatsApp and phone, usually on site within a day in the Rhine-Main region. Feasible, but always more expensive than the planned route – and rarely at a convenient moment.
- Process
HOW A SERVICE RUNS WITH US
- From the job diary
PROJECTS FROM MAINTENANCE & SERVICING
No marketing copy – documented jobs with real findings, all in our job diary.
PLANNED MAINTENANCE · STANDBY POWER SYSTEM
Scheduled generator servicing
Servicing the standby power unit to the manufacturer’s specification – overhauled component lifted back in, test run under load, report for the next round.
Read the project
REPARATUR VOR ORT · HAFEN ASCHAFFENBURG
Kabeltrommel-Rohrwelle vor Ort geschweißt
Schweißinstandsetzung im Hafen Aschaffenburg: die Rohrwelle der Kabeltrommel per WIG repariert – ohne das Hochspannungskabel abzuspulen.
Read the project
CAUSE NOT SYMPTOM · 80 CARRIERS
The overhead conveyor was squealing
The drive was not to blame – the pins and bearing points were. All 80 carriers re-pinned, instead of greasing them and letting the wear carry on.
Read the project- Frequently asked questions
MAINTENANCE & SERVICING: ANSWERED DIRECTLY
Do you fix findings straight away or does that need a second appointment?
Whatever can be fixed during the same visit, we fix straight away – wear parts and tools are on board. A second appointment only arises when a part has to be procured or manufactured, or when the work needs a longer shutdown window. In that case you get both together: the finding and a concrete proposal for when and how it will be resolved.
Do you offer maintenance contracts with fixed intervals?
Yes. We record your plant, propose intervals and come at fixed appointments – with a report and list of findings for next time. The plannable route is almost always the cheapest, because wear is found while it is still wear and not yet damage.
Can you support a plant permanently on site?
Yes, where a system must not fail. At Frankfurt Airport we look after a shoe sorter running 24/6 with several mechatronics engineers on the premises. Response time then counts in minutes rather than hours, and recurring causes get eliminated instead of being fixed again every time.
What happens if a spare part is no longer available?
Then we make it. Pins, bushes, fitting pieces, reinforcement plates and brackets are produced in our workshop in Rodgau. On older plant in particular this is often the only route that does not end in a complete replacement – and it is usually many times cheaper.
What kind of plant do you maintain?
Electric overhead conveyors, conveying and sorting systems, crane equipment, standby power units and generators, plus ventilation and refrigeration right through to precision air conditioning units in data centres. We work independently of manufacturers – mechanics, electrics and welding come from the same team.
How quickly can you be on site in an emergency?
We can be reached at any time by WhatsApp and phone, weekends included. In the Rhine-Main region we are usually on site within a day, and immediately for plant under permanent support. An emergency is always the most expensive route, though – which is why we recommend keeping the planned share as large as possible.
- Weitere Leistungen
WHAT ELSE WE TAKE ON
Installing and converting plant
Heavy loads into finished buildings
You are here
What cannot be bought
Dismantling and clearance
Abbauen, umsetzen, anfahren
Nine industries at a glance
Eigener Bereich, DE & EN
- Alle Standorte
WARTUNG & INSTANDHALTUNG IN IHRER STADT
Ihr Standort ist nicht dabei? Wir arbeiten im gesamten Rhein-Main-Gebiet, bundesweit und im europäischen Ausland – eine Übersicht steht unter areas of application. Für Elektrohängebahnen haben wir eine eigene Seite: Wartung von Elektrohängebahnen.
MAINTENANCE CONTRACT OR A SINGLE JOB?
Tell us briefly which plant is involved – we will come back with a proposal for intervals, scope and costs.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt