CUSTOM FABRICATION FOR EXISTING PLANT
We are not a metal shop that builds everything. We make the one part that gets your plant running again – when the manufacturer no longer supplies it, or when it never existed.
pieces – one-offs instead of series production
our own workshop with welding equipment and a milling machine
years of industrial installation
Fitters on the job when it has to be quick
- What it is about
WENN DAS TEIL NICHT MEHR LIEFERBAR IST
A plant is down because a component has broken. The manufacturer no longer supplies it, has discontinued the model or no longer exists at all. That leaves two options: write the plant off – or have the part made.
That is exactly what our workshop in Rodgau is for. We measure up the original or the installation situation on site, design from that and make the piece using welding and milling. And where no part ever existed, we design one: the impact protection that spreads the force into the surface, or the rail system that makes it possible to remove a fan bearing in the first place.
What we deliberately do not do: Series production, prototyping, metalwork for private customers. We make one-offs for industry – where an existing machine or plant needs a spare part and it has to happen quickly.
Zum Sondermaschinenbau haben wir ein klares Verhältnis: Wir konstruieren keine Sondermaschinen, wir montieren sie. Was wir selbst fertigen, sind die Teile drumherum – Unterkonstruktionen, Bühnen, Konsolen, Passstücke –, damit eine Anlage überhaupt an ihren Platz passt. Für die Industriemontage im Sondermaschinenbau bringen unsere Montageteams die Anlage des Herstellers ein, richten sie aus und montieren sie beim Endkunden.
- Why us
FOUR REASONS WHY COMPANIES CALL US IN
Remaking parts that are no longer available
Manufacturer no longer supplying, model discontinued, company gone from the market: we make the component from a sample or from measurements – instead of writing off the plant.
Solutions that do not exist off the shelf
Not just remaking parts, but designing new ones for a specific problem: impact protection made from square tube with a 10 mm wall thickness, whose welded-in corners act as run-up ramps – you will not find that in any catalogue.
Eigene Schlosserei in Rodgau
Welding equipment and a milling machine in house. No supplier for everyone to wait on, and adjustments are still possible during installation instead of becoming a new order.
One-offs, not series production
We are not a series supplier and not a prototype shop. We make the one-off for an existing industrial plant – and we make it when time is short.
- Services
WAS WIR FERTIGEN
Always related to an existing plant – from measuring up through manufacture to installation.
Spare parts from a sample
Pins, bushes, shafts, levers, brackets: we take the broken part or the installation situation as our template and make the replacement – even when no drawing exists any more.
Fitting pieces & adapters
When new meets old and the connecting dimensions do not match: spacers, adapter plates and mounts that bring the two together.
Custom impact and collision protection
Protection for plant that keeps getting hit – designed for the specific situation, bolted or welded in place on site.
Reinforcements & brackets
Reinforcement plates for worn bearing points, brackets for retrofitted equipment, mounts for additional loads – designed for the actual installation location.
Vorrichtungen & Hilfsmittel
Sometimes it is not the component that is missing but the way to get at it: to remove a fan bearing we built a rail system, because there was no other route.
Measuring up & design
We measure up the real object and design from that – not from a drawing describing how things looked twenty years ago. That is why it fits first time.
- Routes to the part
DREI WEGE ZUM FEHLENDEN TEIL
Which route is the right one is decided by looking at the component – not over the phone. Send us photos and we will tell you.
Der schnellste Weg
Something similar is available and only needs adapting. Cheap and quick – we always check this first before making anything new.
The most common case
The original serves as the template, even when broken. We measure up, design and make the replacement – often within days, instead of waiting months only to be told it is discontinued.
When it never existed
For a problem no catalogue solves: guarding, a fixture or a mount designed for this specific plant. More effort – but often the only solution that holds.
- Process
VOM DEFEKTEN TEIL ZUM EINGEBAUTEN ERSATZ
- From the job diary
PROJEKTE AUS DER SONDERANFERTIGUNG
No marketing copy – documented jobs with real findings, all in our job diary.
NEUKONSTRUKTION · RAUM OFFENBACH
Impact protection that could not be bought
The plant kept getting hit. Designed, manufactured and installed to measure – built for this exact situation instead of ordered from a catalogue.
Read the project
VORRICHTUNG · LACKIERANLAGE
A rail system just to reach it
There was no route for removing the fan bearing. So we built one: a rail system, made in house, that carries the load out.
Read the project
ERSATZTEIL · 80 FAHRZEUGE
Pins and bearing points remanufactured
Worn pins on 80 overhead conveyor carriers: remanufactured and fitted – instead of replacing the carriers or waiting for a delivery.
Read the project- Frequently asked questions
SONDERANFERTIGUNG: DIREKT BEANTWORTET
Do you make series parts or prototypes as well?
No. We are not a series supplier and not a prototype shop. We make one-offs for existing industrial plant – the spare part that can no longer be bought, or the custom design for a specific problem on a specific machine. For series work and development contracts, other companies are the right address.
Do you work for private customers or do general metalwork?
No, we work exclusively for industrial operations and always in relation to an existing plant. Gates, domestic railings and the like are not part of what we offer – there are metalworking shops and forges that do that better and cheaper.
Can you remake a part when no drawing exists any more?
Yes, that is the normal case. We take the original part as our template – broken or not – or measure up the installation situation on site and design from that. What matters are seating dimensions, tolerances and load directions, not the old drawing. Send us photos and we will tell you whether it can be done.
How quickly can something like this be made?
That depends on the part, but the time advantage is usually the real reason clients come to us: a remake is often ready within days, whereas a discontinued part at the manufacturer means months of waiting or replacing the whole assembly. If your plant is down, reach us by WhatsApp or phone.
Do you fit the part as well?
Yes, and that matters to us. We do not just drop it off – we fit it, adjust it on site where needed and check that it works. Since we install, maintain and weld anyway, our responsibility does not end at the workshop door.
What does a custom part cost?
That can only be answered honestly once we have seen it – material, effort and accessibility determine the price. The right comparison, though, is rarely a catalogue part but the alternative: replacing the whole assembly, or the plant standing still. Measured against that, the one-off is almost always the cheaper solution.
- Weitere Leistungen
WHAT ELSE WE TAKE ON
Installation in existing facilities
Heavy loads into finished buildings
Cause rather than symptom
You are here
Dismantling and clearance
Abbauen, umsetzen, anfahren
Nine industries at a glance
Platforms, stairs, on-site welding
FEHLT IHNEN EIN TEIL?
Send us photos of the damaged component and the installation situation – we will tell you whether we can remake it and how long it will take.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt