We solve problems where others give up

Since 2012 we have taken on what is technically and logistically demanding – with our own people, our own equipment and a boss who is out on site himself.

2012

founded in Rodgau near Frankfurt

Lifting AP

Lifting operations under our own responsibility

Ausbilder

for cranes, access platforms and telehandlers

DE · EN

Project language and documentation

An eye for what is feasible – and a passion for the craft

When you work with Omega Mounting, you don't get anonymous project management. You get a team that is passionate about what it does.

Many of us grew up with a toolbox in hand – between our fathers’ workbenches and restoring old tractors. Building, fixing and improving things was never just a job, it was a way of life.

That enthusiasm is what we bring to your projects today – combined with technical skill, industrial experience and clear communication.

Supervisor und Rigger im abgestimmten Einsatz an der AnlageTorsteuerung, Steckdosen und neuer Rampen-Schaltschrank im GebäudeinnerenFertig montierter Not-Aus-Taster an der Paket-SortieranlageMerlin Gerin Compact NS630N Leistungsschalter im AnschlussfeldLagerstelle im EHB-Gehänge nach dem Einsetzen des neuen BolzensKransteuerung an der Brücke – montiert bis zur Übergabe an den BetriebselektrikerHallenneubau während der Montage – Palettenregale und Kragarmregal-BauteileRevidierter Umlenkblock des EHB-Hebers nach dem WiedereinbauVorher-Nachher: aufgerissenes und fertig verschliffenes Schienenprofil

Jobs from across our whole range of services – from moving equipment in to dismantling it.

What you gain with us at your side

01We speak industry

Our projects rarely take place on a greenfield site. Usually we work under real conditions – tight spaces, ongoing operation and deadlines that are fixed.

02We think along with you

Not just installation to plan, but genuine support. We bring more than muscle – a sense of proportion, technical experience and logistical foresight.

03We take responsibility

Safety concepts, record keeping, coordination between trades – a team that knows what needs doing and keeps track of the whole picture.

04We deliver solutions

Whether moving in heavy machinery, Dismantling in existing buildings or Maintenance during live operations: we take care of what is technically and logistically demanding.

05Equipment and team from a single source

Special cranes, lifting systems, transport logistics, coordination of other trades – we deliver solutions, not building sites.

06Quick response to bottlenecks

When plant downtime looms, every hour counts. Our Lift-&-Shift-Team is available at short notice throughout Germany – for precisely targeted call-outs.

What we are trusted with

On data centre and industrial sites, it is not the loudest advertiser who wins the work but whoever has the certificates. These are the ones we have earned.

Lifting AP / Appointed Person

On Rechenzentrumsbaustellen we plan, check and take responsibility for lifting operations ourselves – from load calculation through sign-off to supervision on site. This role is not handed out, you work your way into it.

Instructors and examiners

Since 2026 we have trained operators for cranes (TÜV Nord), aerial work platforms and telehandlers ourselves and examine them in house. The expertise sits with us – not with a service provider you have to book first.

Eigener EHS-Standard

Our occupational safety is set out in our own rulebook – bilingual, based on DGUV, BetrSichV and TRBS, with ten binding Omega safety rules. We do not just sign our clients’ requirements, we have our own.

Tobias Schott

Founder, doer and team player – and the reason there is rarely much debate on our sites.

Tobias Schott, Geschäftsführer der Omega Mounting GmbH, im Arbeitsshirt vor einem Fahrgerüst im Einsatz

Tobias Schott, Managing Director – usually out on site himself.

“I love delivering projects of any size together with my crew.”

As the son of an industrial mechanic, his career path was clear early on. Tobias Schott was on building sites as a child, got to know welding torches and torque wrenches in the family workshop – and developed an eye for what works in practice.

Today he does not just run projects, he is on site himself. When things get tight, he is where the decisions are made – not on the phone.

  • Training as a mechatronics engineer
  • Further training to become an IHK specialist
  • Lifting AP / Appointed Person for lifting operations
  • Instructor and examiner for cranes, aerial work platforms and telehandlers
  • Additional qualifications in welding, fall-arrest PPE and truss systems

The greatest source of pride? His father even became part of the crew himself – until he retired. He was a walking toolbox and inventor of tricks. Customers and colleagues alike celebrated him.

What you can expect from us

  • Highly trained staff with solid qualifications and regular further training
  • Modern equipment for every application
  • Ausgestattete Einsatzfahrzeuge, direkt einsatzbereit
  • In-house workshop for fast custom solutions
  • Our own spare parts store for short response times
  • Our own machinery, including specialist equipment
  • Team spirit, reliability and a hands-on mentality

The Mounting Crew – the heart of the company

Whether mechanics, electrical engineering, electronics or machine fitting: our team brings a wealth of expertise – complemented by further training in project and quality management, safety and lifting technology. And above all by the one thing you cannot train: sticking together.

On siteThe Mounting Crew

Mechanics, electricians, mechatronics engineers and machine fitters – each with their own tools, their own vehicle and the experience to carry on when the plan no longer fits. Sticking together is not an empty phrase here: whoever finishes first helps the next one.

In the officeAnne Duchmann

Back office and organisation. She keeps appointments, certificates and paperwork together so the work outside can go ahead – and for many clients she is the first voice to call back.

Womit wir anrücken

Unsere Kunden sprechen uns regelmäßig auf unsere Ausrüstung an. Sie ist der Grund, warum wir einmal anfahren und dann arbeiten können – statt zwischendurch etwas holen zu müssen.

Der Lift-&-Shift-Anhänger

Alles an Bord, um Lasten zu heben und zu bewegen: Rundschlingen, Ketten und Schäkel, Kettenzüge, Transportfahrwerke, Schaltschrankwagen, einschraubbare Anschlagpunkte und die komplette Ausrüstung für Höhensicherung. Eine Anfahrt, alle Eventualitäten abgedeckt.

Die mobile Werkstatt

Für Rechenzentren haben wir eine Werkstatt gebaut, die auf Rollen steht und in beschrifteten Kisten organisiert ist. Sie lässt sich in wenigen Minuten ein Stockwerk weiter schieben und wächst mit dem Projekt mit.

Eine Kiste, ein Arbeitseinsatz

In der Pumpenkiste liegen Glykol- und Dieselpumpe zusammen mit Spillkit, Ölbindemittel, Schutzbrille und Handschuhen. Die Sicherheitsausrüstung liegt neben dem Werkzeug, bevor jemand danach fragt – jede Kiste beschriftet, mit hinterlegten Sicherheitsdatenblättern.

Montagebusse wie Feuerwehrautos

Handwerkzeug, Maschinen und Verbrauchsmaterial sind fest verstaut. Unsere Monteure müssen morgens nicht packen, sondern nur einsteigen. Das ist der unspektakuläre Grund, warum wir schnell vor Ort sind.

Die eigene Werkstatt in Rodgau

Neunundneunzig Prozent unserer Arbeit findet bei Ihnen statt. Für den Fall, dass ein Ersatzteil nicht mehr lieferbar ist, haben wir Dreh- und Fräsmaschine: Wellen nacharbeiten, Hülsen fertigen, einen Getriebeblock planfräsen. Wir sind kein Lohnfertiger – wir sind Ihr Plan B, wenn es sonst keinen gibt.

Anhänger für den nächsten Fall

Passt kein vorhandener Anhänger zum Projekt, bauen wir einen, der passt. Das ist der Teil unserer Arbeit, in dem wir richtig aufgehen.

About us: briefly answered

Seit wann gibt es Omega Mounting?

Since 2012, founded in Rodgau near Frankfurt. Operating as a GmbH since 2019.

Do you work with your own people or with subcontractors?

Der Kern ist unsere eigene Mannschaft – festangestellt, mit eigenem Werkzeug und eigenen Fahrzeugen. Für große Projekte ergänzen wir sie um feste Partnerkolonnen, die wir seit Jahren kennen und selbst anleiten. Firmen, die als Nachunternehmer mit uns arbeiten möchten, finden die Voraussetzungen und den Ablauf auf unserer Seite für Partnerfirmen.

What area do you cover?

Our focus is the Rhine-Main region around Rodgau and Frankfurt. For projects that suit us, we work throughout Germany and across Europe.

Can you handle English-language projects as well?

Yes. On international data centre sites, English as the project language and English documentation are standard for us.

Wie viele Leute arbeiten bei Omega Mounting?

Unsere Kernmannschaft besteht aus 15 Mitarbeiterinnen und Mitarbeitern, der Großteil davon draußen auf Montage – der Geschäftsführer eingeschlossen. Im Team stecken Schlosser, Elektriker, Mechatroniker, ein Techniker und Kolleginnen und Kollegen mit Produktionserfahrung, dazu Montagehelfer. Genau diese Mischung erlaubt es uns, mit drei oder vier Gewerken gleichzeitig vor einer Anlage zu stehen, statt für jeden Schritt eine weitere Firma zu bestellen.

Bekomme ich bei jedem Einsatz dieselben Leute?

Ja. Unsere Kunden werden dauerhaft von denselben Monteuren betreut. Wer Ihre Anlage einmal montiert oder gewartet hat, kennt sie beim nächsten Mal wieder – Sie erklären nichts zweimal. Wir halten das für den größten Nutzen, den wir bieten können.

Für wen arbeiten Sie nicht?

Für Privathaushalte sind wir in aller Regel die falsche Adresse: Anfahrt, Hebetechnik und Fachpersonal sprengen den Rahmen einer privaten Aufgabe. Und wir arbeiten nicht für Auftraggeber, die respektlos mit unseren Leuten umgehen. Unser Team steht bei uns an erster Stelle – wo respektvoll zusammengearbeitet wird, bleiben wir dafür über Jahre.

Get to know us

Best of all where it matters: on your project. Tell us briefly what it is about – we will come back to you with a sound assessment.

100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt

Durchgehende Fanwall aus CRAH-Units im Datacenter Raunheim
Repair instead of replace: a refurbished curved rail from an electric overhead conveyor.
en_GBEnglish