STEEL STRUCTURES & ACCESS PLATFORMS

Where something is missing that cannot be bought: we design it, make it and install it – and weld it right where the plant stands.

20+

years of industrial installation

WIG

including on load-bearing parts

Rodgau

our own metalwork shop and fabrication

24/7

fitters on the job

WE WELD WHERE THE PLANT STANDS

Omega Mounting builds working platforms, decks, stairs, railings and special steel structures – designed and fabricated in our own metalwork shop in Rodgau, installed and welded directly at the customer site.

The decisive part usually happens on site. A component can be prefabricated, the fit to the real plant cannot: dimensions differ, surfaces are uneven, systems grown over the years rarely match the drawing. Anyone who can only weld in the workshop comes to a halt at that point.

That is why on-site welding is our core competence – from repair welding on damaged plant and TIG welding on load-bearing parts to working alongside live operations, with extraction, screening and work permits.

Vorher-Nachher: aufgerissenes und fertig verschliffenes Schienenprofil
Test facility of a southern German automotive group: conversion with a fully welded oil pan.

FOUR REASONS WHY OUR WELDING COUNTS

Repair welding on the plant

Cracked welds, worn bearing seats, distorted structures: we cut out the damage, re-weld and restore the load capacity – instead of replacing the whole assembly.

TIG on load-bearing parts

Where weld quality matters, we use TIG – for example on rails, curves and supporting structures carrying loads and hundreds of thousands of load cycles.

Welding during live operations

Alongside production, in hygiene areas and in restricted zones: with extraction, screening, fire watch and work permits. That keeps the operation running while we work.

Documented for the inspection

We record the work, the material and the findings in photos and in writing – so the competent person or inspector can sign off on a sound basis.

WAS WIR IN STAHLBAU & ARBEITSBÜHNEN ÜBERNEHMEN

From the site survey through fabrication in Rodgau to installation and acceptance – design, metalwork and welding from one team.

Working & maintenance platforms

Platforms and decks for safe access to plant – often the very reason maintenance becomes permissible and economical in the first place.

Stairs, railings & access

Industrial stairs, handrails, fall protection and crossovers: made to measured dimensions, adapted to what is actually there on site.

Steel platforms & supporting structures

Platforms for machinery and equipment, support frames, brackets and substructures – designed, fabricated and installed, including in existing buildings.

On-site repair welding

Cutting out cracks and re-welding, adding reinforcements, straightening distortion – on rails, frames, brackets and supporting structures directly on the plant.

Custom fabrication to measure

Fitting pieces, reinforcement plates, impact protection, adapters: whatever no longer exists or never did is made in our metalwork shop – up to 10 mm wall thickness in impact protection.

Measuring up & design

We take the measurements on site and design from those – not from a drawing describing how things looked twenty years ago.

EVERY INDUSTRY HAS ITS OWN RHYTHM

Welding on a running plant follows different rules than welding in the workshop. Knowing both makes for realistic planning.

Automotive & Mechanical Engineering

The weekend window

Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.

Steel structures & access platforms

The hot work permit

Here it is not the clock that decides but the permit. Extraction, screening, fire watch and the work permit determine when welding is allowed – and for how long.

Logistics & intralogistics

The night between two peaks

Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.

HOW ON-SITE STEELWORK SUCCEEDS

01SITE SURVEYMeasuring on site what is actually there – not what the drawing says. Defining connection points, loads and access.
02FABRICATIONDesign and prefabrication in our metalwork shop in Rodgau, with allowance deliberately built in for adjustment on site.
03INSTALLATIONMoving in, aligning, welding – with extraction, screening and work permits wherever we work alongside live operations.
04HANDOVERChecking welds, applying corrosion protection and paint, documenting the work – as the basis for sign-off by the competent person.

PROJECTS FROM STEEL STRUCTURES & ACCESS PLATFORMS

No marketing copy – documented jobs with real findings, all in our job diary.

STEEL STRUCTURES & ACCESS PLATFORMS: ANSWERED DIRECTLY

Do you also weld directly on the plant, not just in the workshop?

Yes, and that is the core of our work. A lot can be prefabricated, the fit to the real plant cannot: dimensions differ, surfaces are uneven, systems grown over the years rarely match the drawing. We cut out cracks, re-weld, add reinforcements and straighten distortion – right where the plant stands.

Can you weld while production is running?

Often yes, with the appropriate measures: extraction, screening off the production area, a fire watch and a hot work permit. In hygiene and security areas we agree this with those responsible beforehand. Where a permit cannot be obtained, we move the work into a window – but then fully prepared.

Which welding processes do you use?

Mainly MAG for structural and repair work and TIG where weld quality matters – for example on rails, curves and supporting structures carrying loads and hundreds of thousands of load cycles. Which process makes sense is decided by the material, the accessibility and the stresses involved.

Do you design and fabricate the components yourselves?

Yes. We take the measurements on site, design from them and fabricate in our metalwork shop in Rodgau – with welding equipment and a milling machine. That removes the supplier everyone else would be waiting on, and adjustments are possible at short notice instead of triggering a new order.

Do you also build working platforms for maintaining existing plant?

Yes, that is a frequent reason for calling us. Often maintenance only becomes permissible and economical once there is safe, permanent access. We build platforms, decks, stairs and railings to measure – adapted to the existing structure rather than a catalogue product that does not fit.

Do I get documentation for the inspection?

Yes. We record the work, the material and the findings in photos and in writing so your competent person or inspector can sign off on a sound basis. The formal inspection itself is theirs to carry out – we supply what they need for it.

ZU HAUSE IN MEHREREN BRANCHEN

Supervisor und Rigger im abgestimmten Einsatz an der AnlageData centres The operation with no off switch Lifting, rigging and installation of heavy equipment – in new builds and in live data centres alike. View service areaTorsteuerung, Steckdosen und neuer Rampen-Schaltschrank im GebäudeinnerenLogistics & intralogistics The night between two peaks Loading and conveying systems, statutory inspection repairs, series rollouts across many sites. View service areaFertig montierter Not-Aus-Taster an der Paket-SortieranlageAirport & security areas The operation that never closes Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support. View service areaMerlin Gerin Compact NS630N Leistungsschalter im AnschlussfeldEnergy & emergency power The window that must not exist Standby power units up to 3 MW, generator servicing, exhaust and silencer systems. View service areaLagerstelle im EHB-Gehänge nach dem Einsetzen des neuen BolzensFood & beverage Between two cleaning cycles Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations. View service areaKransteuerung an der Brücke – montiert bis zur Übergabe an den Betriebselektrikercrane construction The moving hall section Overhead, gantry and jib cranes including runways – including replacements on an existing runway. View service areaHallenneubau während der Montage – Palettenregale und Kragarmregal-Bauteilebusiness equipment The space that has to be cleared Racking and storage systems, workshop bays, washing plants – installed and dismantled. View service areaRevidierter Umlenkblock des EHB-Hebers nach dem WiedereinbauAutomotive & Mechanical Engineering The weekend window Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line. View service area
Vorher-Nachher: aufgerissenes und fertig verschliffenes SchienenprofilSteel structures & access platforms The hot work permit Platforms, stairs, custom structures – welded where the plant stands. You are here
Your sector is not listed? No problem.

We work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.

Send an enquiry

MISSING A STRUCTURE OR SAFE ACCESS?

Tell us briefly what it is about – we will come and take the measurements and tell you what is feasible.

100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt

Montierte Stahlbühne in der Produktionshalle am Flughafen Kassel
Repair instead of replace: a refurbished curved rail from an electric overhead conveyor.
en_GBEnglish