SAGEN SIE UNS, WORUM ES GEHT

A message is the fastest way: email or WhatsApp reach us even when nobody can get to the phone.

24/7

on the job

DE · EN

Project language and documentation

9–15 Uhr

Office staffed, Monday to Friday

EINE NACHRICHT KOMMT IMMER AN – EIN ANRUF NICHT IMMER

We do try to answer the phone. But when our hands are inside a machine, a lift is under way or we are working in a restricted area, that is not possible – and you end up holding the line instead of getting an answer.

That is why email and WhatsApp are the faster route. You describe once what it is about; we come back as soon as the work allows – with someone who can actually answer your question. Our office is staffed Monday to Friday from 9 am to 3 pm; on the mobile you can often reach us earlier and later too, because our fitters are out long before the office opens.

What most enquiries are about: Industrial assembly and plant installation, machine relocations, Lift & shift in the data centre, Maintenance and servicing, industrial dismantling or a Custom fabricationthat cannot be bought off the shelf. You will find the overview under Services and areas of application.

Advice and an assessment cost nothing. And if we are not the right people for your case, we will say so openly – usually along with who might be instead.

I am still out on site myself and deal with my clients’ concerns personally. With more than 20 years across a wide range of industries, I know exactly what I am talking about. That is why you get a first proposed solution quickly – and not an answer that has to take the detour through a sales department.

Tobias SchottManaging Director, Omega Mounting GmbH

#machenistwiewollennurkrasser

Tobias Schott, Geschäftsführer der Omega Mounting GmbH, im Arbeitsshirt vor einem Fahrgerüst im Einsatz

Tobias Schott, Managing Director – usually out on site himself.

Three ways to reach us

REQUEST A CALL-BACK

The more specific your details, the sounder our assessment. Photos of the plant or the installation situation help us most.

WAS NACH IHRER ANFRAGE PASSIERT

01EINGANGYour message comes straight to us – not to a call centre. We review it the same working day.
02RESPONSEWe reply with someone who can assess the plant and clarify the points that determine how it will run.
03SITE WALKWhere it makes sense, we come out. Photos are no substitute for a site visit – and that costs you nothing.
04ANGEBOTProcess, team, equipment and schedule in writing – including the points still open, rather than a figure with nothing behind it.

WO SIE UNS FINDEN

Our base with workshop and store is in Rodgau, about 20 minutes south-east of Frankfurt.

Anschrift

Omega Mounting GmbH
Hügelstraße 5
63110 Rodgau

Workshop and store at the same location.

Contact

Phone: 06106 / 239 25 88

Mobil & WhatsApp: 0172 / 669 38 57

E-Mail: anfrage@omegamounting.de

Zeiten

Office: Mo–Fr 9–15 Uhr

Montage: on the job around the clock – early starts, late finishes, night and weekend windows.

You are currently viewing placeholder content from Google Maps. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More information

KONTAKT: DIREKT BEANTWORTET

What is the fastest way to reach you?

By email or WhatsApp. Our fitters often have their hands inside a machine or are coordinating a lift – and then nobody can get to the phone. A message, on the other hand, always arrives and is answered as soon as the work allows. For calls, our office is staffed Monday to Friday from 9 am to 3 pm.

Why does someone not always answer the phone?

Because our people work on sites and inside plant, not at a desk. We try to pick up, but during a lift, in a restricted area or with our hands inside a machine it is simply not possible. That is not a lack of interest – and it is why we prefer messages.

Is there an on-call service for urgent cases?

Yes – for clients in critical infrastructure we set up a dedicated on-call service with its own number, for example for data centres, airports and operators where an outage cannot wait. That number is not public; it is agreed as part of the working relationship. If you need that level of availability, talk to us.

When are your fitters at work?

Considerably longer than the office is open. Installation happens when the plant allows it: early in the morning, at night, at weekends or during a shutdown window. That is exactly why you can reach the office from 9 am to 3 pm but the mobile often outside those hours too.

What should the enquiry include?

Most helpful are: which plant it concerns, what has happened or needs to happen, when work is allowed at your site and what the access looks like. Photos of the plant and the installation situation often save a whole round of questions. And if you do not know all of it – no problem, we will ask.

Do advice or a site visit cost anything?

No. Advice, an assessment and usually the site visit too are free and without obligation. Costs only arise once a quotation is accepted – at rates we set out openly in that quotation.

This is what our work looks like

We record every completed job in our job diary – with photos, figures and whatever can go wrong along the way. That is the most honest answer to the question of whether we suit your task.

SCHREIBEN SIE UNS EINFACH

A short message is enough – we will come back with a sound assessment.

100% free of charge and without obligation · Office Mon–Fri 9 am–3 pm · Fitters on the job around the clock

We are glad to help with advice and action – including when it is not yet clear what the solution should look like. The more we know about your task, the sounder our answer will be.

This helps us most
  • What needs doing – in your own words is perfectly fine
  • Photos or drawings of the situation on site
  • Location, access and your preferred timeframe
  • Special conditions such as live operation, safety requirements or access rules

Your documents stay with us. Everything you send us is treated in strict confidence and never passed on to third parties. If your project requires a non-disclosure agreement, that goes without saying for us – simply send it along with your enquiry.

Tobias Schott von Omega Mounting dokumentiert einen Montageeinsatz am Laptop – mit Helm, Schutzbrille und Warnschutzkleidung auf dem Technikgang eines Rechenzentrums
When it is urgent, straight from the site.

Kein Kundenanliegen?

Sie sind Subunternehmer oder Partnerfirma

Wir vergeben laufend Montageleistungen an Firmen mit eigener Mannschaft — Industriemontage, Rechenzentrum, Rohrleitungs- und Elektromontage, Wartung. Was wir dafür brauchen und wie die Zusammenarbeit anläuft, steht auf einer eigenen Seite.

Für Subunternehmersubunternehmen@omegamounting.de

en_GBEnglish