- Overview
SERVICES: THE ENTIRE LIFECYCLE OF A PLANT
Einbringen, aufbauen, anschließen, warten, umsetzen, zurückbauen – wir begleiten eine Industrieanlage von der Anlieferung bis zum letzten Tag am Standort. Als Montagefirma mit eigenen Industriemonteuren, nicht als Vermittler.
Leistungen entlang des Lebenszyklus
All trades in one team: mechanics, electrics, welding
years of industrial installation
Industriemonteure im Einsatz, DE & EN
- What it is about
ONE COMPANY FOR THE ENTIRE LIFECYCLE
Most providers cover only part of the picture: one commissions the machine, the next maintains it, a third dismantles it at some point. Knowledge is lost at every handover – and when something does not fit, nobody did it.
Wir machen die ganze Kette – ein Montageservice, der nicht mit der Inbetriebnahme endet. Wir bringen eine Anlage ein, bauen sie auf, schließen sie an, fertigen die Teile, die im Bestand fehlen, warten und reparieren sie über Jahre, setzen sie um, wenn der Standort wechselt, und bauen sie zurück, wenn ihre Zeit vorbei ist.
The practical benefit usually shows up late: whoever moved a plant in and maintained it for years knows the routes, the connection points and the weak spots when it comes to dismantling – from their own records.
Wer Montagedienstleistungen einkauft, vergleicht meist drei Dinge: Umfang, Verfügbarkeit und wer am Ende geradesteht. Omega Mounting ist Partner für Industriemontage über den gesamten Lebenszyklus – Einbringung, Aufbau, Wartung, Umsetzung und Rückbau aus einer Hand. Dafür stellen wir Montageteams zusammen, die Mechanik, Elektrik und Schweißtechnik abdecken, statt für jedes Gewerk eine eigene Firma auf die Baustelle zu holen.









Jobs from across our whole range of services – from moving equipment in to dismantling it.
- What applies throughout
FOUR THINGS THAT APPLY TO EVERY SERVICE
Alle Gewerke in einem Team
Mechanische Montage, Elektrik und Schweißtechnik von denselben Leuten. Montage bis zum Hauptschalter, Sensorik justiert, Probelauf begleitet – keine Firma, die auf die andere wartet.
Working during live operations
Next to the line, in hygiene areas, in restricted zones or on the redundant string: we work where production continues alongside – with the necessary permits.
Our own lifting equipment and fabrication
Mini cranes and spider cranes for finished buildings, our own metalworking shop in Rodgau for the part that is no longer available. Both prevent downtime that others simply have to accept.
Cause rather than symptom
We do not just hand over a list of findings – we fix what can be fixed during the same visit, and look for the cause rather than the symptom.
- Our services
SIX SERVICES THAT INTERLOCK
Jede Leistungsseite beschreibt den Ablauf, die Grenzen und dokumentierte Einsätze aus dem Auftragstagebuch – von Industriemontagen bis zum Rückbau.
Lift & Shift
Einbringen
Moving heavy equipment into finished buildings – with our own lifting gear, to a lift plan and permit. Lifts up to 100 tonnes.
View service
Industrial assembly
Install & connect
Installing, converting and commissioning machines and plant in existing buildings – all trades from one team.
View service
custom-made products
Anpassen
Spare parts and custom designs for existing plant – one-offs, not series production.
View service
Maintenance & servicing
Betreiben
Scheduled maintenance, repairs based on findings, emergency service around the clock – cause instead of symptom.
View service
machine relocation
Umsetzen
Dismantling, transport, reassembly and commissioning – within the plant, between sites or abroad.
View service
industrial dismantling
Dismantling
Dismantling for recycling, for rebuilding elsewhere or to clear a site – without damaging the building.
View serviceThese six services cover what comes up around a plant in an industrial operation – from moving it in to dismantling it. Much of it overlaps, and some jobs do not fit neatly into a category. Tell us what it is about and we will tell you honestly whether we are the right people for it.
Send an enquiry- Lebenszyklus
FROM MOVE-IN TO REMOVAL
The six services are not a list but stages. Most clients start with one – and stay with us through several.
- Process
HOW A JOB RUNS WITH US
- From the job diary
PROJECTS FROM ALL SERVICE AREAS
No marketing copy – documented jobs with real findings, all in our job diary.
EINBRINGEN · LIFT & SHIFT
Spider crane recovered from the basement
The machine that had been working in the basement had to come back out along the same tight routes – without damaging the finished building.
Read the project
OPERATING · MAINTENANCE
Fan bearing replaced – using a rail system we built ourselves
There was no route for the removal. So we built one: a rail system, made in house, that carries the load out.
Read the project
UMSETZEN · MASCHINENUMZUG
Sechs Paternoster umgezogen
Dismantled, transported and rebuilt at the new site – drive lanes, racks and chains included.
Read the project- Frequently asked questions
LEISTUNGEN: DIREKT BEANTWORTET
Do I have to order all services from you?
No. Most working relationships start with a single job – a repair, a move-in, a missing spare part. That it often grows from there is not down to a package but to the fact that we know the plant afterwards. You decide again at every step.
What is the advantage of awarding everything to one company?
Above all, the handover points disappear. When dismantling, transport and installation are split between three companies, responsibility gets lost along the way – and when there is a problem, nobody did it. On top of that comes knowledge of the plant: whoever moved it in and maintained it knows the routes and weak points for dismantling from their own records.
Do you also work as a subcontractor for main contractors?
Yes – in data centre construction in particular, that is the norm. We know the requirements for documentation and safety – RAMS, permits, lift plans – and supply them in German or English, in the format your client requires.
How quickly can you start?
For planned work we need lead time for procurement and prefabrication, usually two to three weeks. In the event of a breakdown we can be reached by WhatsApp and phone and are usually on site within a day in the Rhine-Main region. Whatever we can solve with what we carry, we solve straight away.
Do you take on small jobs as well?
Yes. A single repair, a part to be remanufactured or a machine that needs to move two metres – that is everyday work, not a special case. For series production and prototyping, however, other companies are the right address.
Which regions do you work in?
We are based in Rodgau near Frankfurt, with our focus on the Rhine-Main region. For rollouts and larger projects we travel throughout Germany, and for relocations across Europe as well – including Italy, France and Luxembourg.
- Our services
WHAT WE TAKE ON IN EVERY INDUSTRY
Installation in existing facilities
Heavy loads into finished buildings
Cause rather than symptom
What cannot be bought
Dismantling and clearance
Abbauen, umsetzen, anfahren
Platforms, stairs, on-site welding
What goes into the hall
HOW CAN WE HELP?
Tell us briefly what it is about – we will come back with a realistic assessment, even if it involves several services.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt