- Contact
TELL US WHAT IT IS ABOUT
A message is the fastest way: email or WhatsApp reach us even when nobody can get to the phone.
on the job
Project language and documentation
Office staffed, Monday to Friday
- What it is about
A MESSAGE ALWAYS ARRIVES – A CALL NOT ALWAYS
We do try to answer the phone. But when our hands are inside a machine, a lift is under way or we are working in a restricted area, that is not possible – and you end up holding the line instead of getting an answer.
That is why email and WhatsApp are the faster route. You describe once what it is about; we come back as soon as the work allows – with someone who can actually answer your question. Our office is staffed Monday to Friday from 9 am to 3 pm; on the mobile you can often reach us earlier and later too, because our fitters are out long before the office opens.
What most enquiries are about: Industrial installation and plant installation, machine relocations, Lift & shift in the data center, Maintenance and servicing, Industrial dismantling or a Custom fabricationthat cannot be bought off the shelf. You will find the overview under Services and Industries.
Advice and an assessment cost nothing. And if we are not the right people for your case, we will say so openly – usually along with who might be instead.
I am still out on site myself and deal with my clients’ concerns personally. With more than 20 years across a wide range of industries, I know exactly what I am talking about. That is why you get a first proposed solution quickly – and not an answer that has to take the detour through a sales department.
Tobias SchottManaging Director, Omega Mounting GmbH
#machenistwiewollennurkrasser

Tobias Schott, Managing Director – usually out on site himself.
- Ways to reach us
Three ways to reach us
- Enquiry
REQUEST A CALL-BACK
The more specific your details, the sounder our assessment. Photos of the plant or the installation situation help us most.
- Process
WHAT HAPPENS AFTER YOUR ENQUIRY
- Location & hours
WHERE TO FIND US
Our base with workshop and store is in Rodgau, about 20 minutes south-east of Frankfurt.
Omega Mounting GmbH
Hügelstraße 5
63110 Rodgau
Workshop and store at the same location.
Office: Mon–Fri 9 am–3 pm
Installation: on the job around the clock – early starts, late finishes, night and weekend windows.
You are currently viewing placeholder content from Google Maps. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More information- Frequently asked questions
CONTACT: ANSWERED DIRECTLY
What is the fastest way to reach you?
By email or WhatsApp. Our fitters often have their hands inside a machine or are coordinating a lift – and then nobody can get to the phone. A message, on the other hand, always arrives and is answered as soon as the work allows. For calls, our office is staffed Monday to Friday from 9 am to 3 pm.
Why does someone not always answer the phone?
Because our people work on sites and inside plant, not at a desk. We try to pick up, but during a lift, in a restricted area or with our hands inside a machine it is simply not possible. That is not a lack of interest – and it is why we prefer messages.
Is there an on-call service for urgent cases?
Yes – for clients in critical infrastructure we set up a dedicated on-call service with its own number, for example for data centers, airports and operators where an outage cannot wait. That number is not public; it is agreed as part of the working relationship. If you need that level of availability, talk to us.
When are your fitters at work?
Considerably longer than the office is open. Installation happens when the plant allows it: early in the morning, at night, at weekends or during a shutdown window. That is exactly why you can reach the office from 9 am to 3 pm but the mobile often outside those hours too.
What should the enquiry include?
Most helpful are: which plant it concerns, what has happened or needs to happen, when work is allowed at your site and what the access looks like. Photos of the plant and the installation situation often save a whole round of questions. And if you do not know all of it – no problem, we will ask.
Do advice or a site visit cost anything?
No. Advice, an assessment and usually the site visit too are free and without obligation. Costs only arise once a quotation is accepted – at rates we set out openly in that quotation.
- From practice
This is what our work looks like
We record every completed job in our job diary – with photos, figures and whatever can go wrong along the way. That is the most honest answer to the question of whether we suit your task.
data centerSetting diesel tanks in the Raunheim data center: five 100 m³ tanks over the shoring wall into the pitRead the report →
data centerMoving transformers into the Frankfurt data center: 52 tonnes on the skidding trackRead the report →
Loading technologyCable drum loaded UV-safe: 22-tonne drum at Aschaffenburg portRead the report →
RepairCable drum repair at Aschaffenburg port: on-site TIG welding on the tubular shaftRead the report →
data centerMoving in standby generators: how a standby power system gets into a data centerRead the report →
Workshop fit-outWorkshop Fit-Out in a Nuclear Facility: Two Pillar Jib Cranes InstalledRead the report →
Machinery relocationStorage lift relocation from Frankfurt to Rodgau: six paternoster units out of a high-rise and into the new hallRead the report →
Custom fabricationCustom impact protection: a heavy-duty one-off protects a production plant near OffenbachRead the report →
Lift & ShiftMoving in and installing 160 PDCs in a data center – lift & shift across eight data halls in the Rhine-Main regionRead the report →
Lift & ShiftMoving load banks and generators into a Frankfurt data center – lift & shift with a 220-tonne mobile craneRead the report →
Lift & ShiftSpider crane recovered from the basement: millimetre work at the Raunheim data centerRead the report →
MaintenanceSquealing overhead conveyor? 80 overhead conveyor carriers refurbished at a food production plantRead the report →JUST DROP US A LINE
A short message is enough – we will come back with a sound assessment.
100% free of charge and without obligation · Office Mon–Fri 9 am–3 pm · Fitters on the job around the clock
We are glad to help with advice and action – including when it is not yet clear what the solution should look like. The more we know about your task, the sounder our answer will be.
- What needs doing – in your own words is perfectly fine
- Photos or drawings of the situation on site
- Location, access and your preferred timeframe
- Special conditions such as live operation, safety requirements or access rules
Your documents stay with us. Everything you send us is treated in strict confidence and never passed on to third parties. If your project requires a non-disclosure agreement, that goes without saying for us – simply send it along with your enquiry.
Not a customer enquiry?
You are a subcontractor or partner company
We continuously award installation work to companies with their own crews – industrial installation, data centers, pipework and electrical installation, maintenance. What we need for this and how the cooperation starts is on a separate page.