- Service area
STEEL STRUCTURES & ACCESS PLATFORMS
Where something is missing that cannot be bought: we design it, make it and install it – and weld it right where the plant stands.
years of industrial installation
including on load-bearing parts
our own metalwork shop and fabrication
fitters on the job
- What it is about
WE WELD WHERE THE PLANT STANDS
Omega Mounting builds working platforms, decks, stairs, railings and special steel structures – designed and fabricated in our own metalwork shop in Rodgau, installed and welded directly at the customer site.
The decisive part usually happens on site. A component can be prefabricated, the fit to the real plant cannot: dimensions differ, surfaces are uneven, systems grown over the years rarely match the drawing. Anyone who can only weld in the workshop comes to a halt at that point.
That is why on-site welding is our core competence – from repair welding on damaged plant and TIG welding on load-bearing parts to working alongside live operations, with extraction, screening and work permits.
- Why us
FOUR REASONS WHY OUR WELDING COUNTS
Repair welding on the plant
Cracked welds, worn bearing seats, distorted structures: we cut out the damage, re-weld and restore the load capacity – instead of replacing the whole assembly.
TIG on load-bearing parts
Where weld quality matters, we use TIG – for example on rails, curves and supporting structures carrying loads and hundreds of thousands of load cycles.
Welding during live operations
Alongside production, in hygiene areas and in restricted zones: with extraction, screening, fire watch and work permits. That keeps the operation running while we work.
Documented for the inspection
We record the work, the material and the findings in photos and in writing – so the competent person or inspector can sign off on a sound basis.
- Services
WHAT WE TAKE ON IN STEEL STRUCTURES & ACCESS PLATFORMS
From the site survey through fabrication in Rodgau to installation and acceptance – design, metalwork and welding from one team.
Working & maintenance platforms
Platforms and decks for safe access to plant – often the very reason maintenance becomes permissible and economical in the first place.
Stairs, railings & access
Industrial stairs, handrails, fall protection and crossovers: made to measured dimensions, adapted to what is actually there on site.
Steel platforms & supporting structures
Platforms for machinery and equipment, support frames, brackets and substructures – designed, fabricated and installed, including in existing buildings.
On-site repair welding
Cutting out cracks and re-welding, adding reinforcements, straightening distortion – on rails, frames, brackets and supporting structures directly on the plant.
Custom fabrication to measure
Fitting pieces, reinforcement plates, impact protection, adapters: whatever no longer exists or never did is made in our metalwork shop – up to 10 mm wall thickness in impact protection.
Measuring up & design
We take the measurements on site and design from those – not from a drawing describing how things looked twenty years ago.
- Industry comparison
EVERY INDUSTRY HAS ITS OWN RHYTHM
Welding on a running plant follows different rules than welding in the workshop. Knowing both makes for realistic planning.
The weekend window
Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.
The hot work permit
Here it is not the clock that decides but the permit. Extraction, screening, fire watch and the work permit determine when welding is allowed – and for how long.
The night between two peaks
Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.
- Process
HOW ON-SITE STEELWORK SUCCEEDS
- From the job diary
PROJECTS FROM STEEL STRUCTURES & ACCESS PLATFORMS
No marketing copy – documented jobs with real findings, all in our job diary.
CONVERSION · TEST FIELD
Test rig conversion with a welded oil pan
Conversion in the test field with a fully welded oil pan – fabricated and welded on site, adapted to the conditions of the existing plant.
Read the project
STEELWORK · KASSEL AIRPORT
Steel platform installed
Supporting structure for production: designed, fabricated and installed in the existing hall – four fitters, around one week.
Read the project
WORKING PLATFORM · AUTOMOTIVE PLANT
Working platform for safe access
Permanent, safe access to the plant – made to measure and installed so that maintenance becomes permissible in the first place.
Read the project- Frequently asked questions
STEEL STRUCTURES & ACCESS PLATFORMS: ANSWERED DIRECTLY
Do you also weld directly on the plant, not just in the workshop?
Yes, and that is the core of our work. A lot can be prefabricated, the fit to the real plant cannot: dimensions differ, surfaces are uneven, systems grown over the years rarely match the drawing. We cut out cracks, re-weld, add reinforcements and straighten distortion – right where the plant stands.
Can you weld while production is running?
Often yes, with the appropriate measures: extraction, screening off the production area, a fire watch and a hot work permit. In hygiene and security areas we agree this with those responsible beforehand. Where a permit cannot be obtained, we move the work into a window – but then fully prepared.
Which welding processes do you use?
Mainly MAG for structural and repair work and TIG where weld quality matters – for example on rails, curves and supporting structures carrying loads and hundreds of thousands of load cycles. Which process makes sense is decided by the material, the accessibility and the stresses involved.
Do you design and fabricate the components yourselves?
Yes. We take the measurements on site, design from them and fabricate in our metalwork shop in Rodgau – with welding equipment and a milling machine. That removes the supplier everyone else would be waiting on, and adjustments are possible at short notice instead of triggering a new order.
Do you also build working platforms for maintaining existing plant?
Yes, that is a frequent reason for calling us. Often maintenance only becomes permissible and economical once there is safe, permanent access. We build platforms, decks, stairs and railings to measure – adapted to the existing structure rather than a catalogue product that does not fit.
Do I get documentation for the inspection?
Yes. We record the work, the material and the findings in photos and in writing so your competent person or inspector can sign off on a sound basis. The formal inspection itself is theirs to carry out – we supply what they need for it.
- Other service areas
AT HOME IN SEVERAL INDUSTRIES
Data centers
The operation with no off switch
Lifting, rigging and installation of heavy equipment – in new builds and in live data centers alike.
View service area
Logistics & intralogistics
The night between two peaks
Loading and conveying systems, statutory inspection repairs, series rollouts across many sites.
View service area
Airport & security areas
The operation that never closes
Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support.
View service area
Energy & standby power
The window that must not exist
Standby power units up to 3 MW, generator servicing, exhaust and silencer systems.
View service area
Food & beverage
Between two cleaning cycles
Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations.
View service area
Crane construction
The moving hall section
Overhead, gantry and jib cranes including runways – including replacements on an existing runway.
View service area
Workshop equipment
The space that has to be cleared
Racking and storage systems, workshop bays, washing plants – installed and dismantled.
View service area
Automotive & Mechanical Engineering
The weekend window
Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line.
View service area
Steel structures & access platforms
The hot work permit
Platforms, stairs, custom structures – welded where the plant stands.
You are hereWe work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.
Send an enquiryMISSING A STRUCTURE OR SAFE ACCESS?
Tell us briefly what it is about – we will come and take the measurements and tell you what is feasible.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt