Installing a work platform at an automotive plant in Mannheim
Project diary
Work platform installed above a production line: aluminium profiles and gratings adapted on site, with handrail, hinged gates and toe boards.
The platform was built from aluminium profiles and gratings and then adapted to the machine on site.
Project profile
- Client sector: Automotive production
- Location: Mannheim
- Scope: Access and work platform above an existing production line: aluminium profiles and gratings adapted on site, continuous handrail, hinged gates and toe boards
- Equipment: Aluminium profile system from a specialist access-equipment manufacturer
- Result: Safe access for maintenance staff above the line without impairing its function





The line and its conveyors needed enough clearance. At the same time, gaps and openings had to stay small enough to keep maintenance staff safe when they climb up.
The aluminium-profile feet also had to be placed inside the machine without affecting its function or the production flow.
The aluminium profile system, supplied by a specialist access-equipment manufacturer, is well suited to this kind of job.
We also fitted a continuous handrail, hinged gates and toe boards so that staff can climb up safely.
We keep your production running
Our service areas
Follow us on social media
Related guides for this project
About the author
Tobias Schott
Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance
A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.