Maintenance and servicing for industrial plant

Omega Mounting maintains and repairs industrial plant – overhead conveyors, conveyor and sorting systems, cranes and standby power units. Maintenance is not a tick-box exercise: we look for the cause, fix it during the same visit and make the spare part when it can no longer be bought.

24/6

Permanent on-site support available

15+

years of experience with electric overhead conveyors

20+

years of industrial installation experience · Omega Mounting since 2012

Nights

and weekends on the job – by arrangement

Greasing only removes the noise – not the problem

Omega Mounting maintains and repairs industrial plant: electric overhead conveyors, conveying and sorting systems, cranes, standby power units, ventilation and refrigeration equipment. We come at fixed intervals, when issues are found or in an emergency – and in some plants we are permanently on site.

The difference lies in what happens after the service. A squeaking overhead conveyor is rarely a drive problem; usually the pins and bearing points have seized. Adding grease gets rid of the noise but not the fault. So we work on the cause and fix it during the same visit, with material and tools on board – instead of generating a second appointment and a second quotation.

And when a spare part is no longer available, maintenance does not stop there. We simply make it in our workshop in Rodgau.

The service work is done by the same fitters who also install and relocate plant, so no time is lost getting to know your plant. For permanent support we provide fixed crews that know your plant, with on-call duty at weekends and at night as well.

Overhauled deflection block of the overhead conveyor hoist after reinstallation
From our project diary: test rig conversion with a fully welded oil sump.

Four reasons why companies call us in

Cause rather than symptom

We look for the reason, not just the symptom. On 80 overhead conveyor carriers at a food production plant it came down to pins and bearing points – greasing them would have removed the noise and left the wear to continue.

Repairs done at the same time

We do not just hand over a list of findings. Whatever can be fixed during the same visit, we fix – with material and tools on board. No second appointment, no second quotation.

Permanent on-site support

Where a system must not fail, we are there permanently: at Frankfurt Airport we look after a shoe sorter running 24/6 with several mechatronics technicians on site. Response time in minutes rather than hours.

Spare parts that no longer exist

On older plant, maintenance often fails at procurement. We manufacture pins, fitting pieces, reinforcements and brackets ourselves – instead of writing the plant off.

What we service and repair

Mechanics, electrics and welding in the same team – so that diagnosis and repair are not split between three companies.

Electric overhead conveyors

Over 15 years with overhead conveyors: refurbishing pins and bearing points, repair-welding rails and curves, overhauling hoists, cleaning conductor lines. Our maintenance checklist for electric overhead conveyors shows what matters here.

Conveying & sorting systems

Tilt trays, tilting airlocks, belt and roller conveyors, drive stations: finding wear before failure, replacing drives, eliminating faults for good.

Crane technology

Supporting recurring inspections, working through findings, overhauling trolleys and travel gear, adjusting rails and end stops.

Standby power & generators

Servicing standby power units to the manufacturer’s specification, repairing coolers and radiators with pressure testing, test runs under realistic load.

Ventilation & refrigeration

Replacing fan bearings, overhauling drives, swapping CRAH units in data centers – during live operation too. See our checklist for replacing CRAH units.

Spare part manufacture

Pins, bushes, fitting pieces, reinforcement plates and brackets from our own workshop – for plant whose manufacturer no longer supplies parts or no longer exists.

Three routes into maintenance

Most operations use all three – the question is in what proportion. The larger the planned share, the rarer the expensive third case.

Based on findings

Acting before it fails

A finding from an inspection or observation is dealt with before damage occurs. Plannable, but on a tighter schedule than regular maintenance.

Planned maintenance

Fixed intervals, fixed price

Recurring appointments to a maintenance schedule, with a report and list of findings for next time. The most economical route – because wear is found while it is still just wear.

Emergency

When it has already stopped

WhatsApp and phone, usually on site within a day in the Rhine-Main region. Feasible, but always more expensive than the planned route – and rarely at a convenient moment.

How a service works with us

01InventoryRecording the plant, reviewing history and open findings, agreeing intervals and critical components with you.
02MaintenanceInspecting, measuring and adjusting to the maintenance schedule – with wear parts and tools on board so small jobs are done straight away.
03RepairFixing findings instead of just reporting them. Whatever has to be manufactured is made in Rodgau and brought along at the agreed appointment.
04ReportWork carried out, measurements and outstanding findings documented – as a basis for inspection and as a plan for the next interval.

Projects from maintenance & servicing

No marketing copy – documented jobs with real findings, all in our project diary.

Maintenance & servicing: straight answers

Do you fix findings straight away or does that need a second appointment?

Whatever can be fixed during the same visit, we fix straight away – wear parts and tools are on board. A second appointment only arises when a part has to be procured or manufactured, or when the work needs a longer shutdown window. In that case you get both together: the finding and a concrete proposal for when and how it will be resolved.

Do you offer maintenance contracts with fixed intervals?

Yes. We record your plant, propose intervals and come at fixed appointments – with a report and list of findings for next time. The plannable route is almost always the cheapest, because wear is found while it is still wear and not yet damage.

Can you support a plant permanently on site?

Yes, where a system must not fail. At Frankfurt Airport we look after a shoe sorter running 24/6 with several mechatronics technicians on the premises. Response time then counts in minutes rather than hours, and recurring causes get eliminated instead of being fixed again every time.

What happens if a spare part is no longer available?

Then we make it. Pins, bushes, fitting pieces, reinforcement plates and brackets are produced in our workshop in Rodgau. On older plant in particular this is often the only route that does not end in a complete replacement – and it is usually many times cheaper.

What kind of plant do you maintain?

Electric overhead conveyors, conveying and sorting systems, crane equipment, standby power units and generators, plus ventilation and refrigeration right through to CRAH units in data centers. We work independently of manufacturers – mechanics, electrics and welding come from the same team.

How quickly can you be on site in an emergency?

We can be reached at any time by WhatsApp and phone, weekends included. In the Rhine-Main region we are usually on site within a day, and immediately for plant under permanent support. An emergency is always the most expensive route, though – which is why we recommend keeping the planned share as large as possible.

What else we take on

Installing and converting plant

Heavy loads into finished buildings

Maintenance & servicing

You are here

What cannot be bought

Dismantling and clearance

Dismantle, relocate, restart

Nine industries at a glance

Dedicated division, DE & EN

Maintenance guides

Maintenance contract or a single job?

Tell us briefly which plant is involved – we'll come back with a proposal for intervals, scope and costs.

Would you like an overview for your files first? All services in compact form, ready to pass on: our brochure as a PDF download.

Free, no-obligation callback · Omega Mounting GmbH, Rodgau near Frankfurt

Supervisor and rigger working in coordination on the unit
Repair instead of replace: a refurbished curved rail from an electric overhead conveyor.
EnglishEnglish