- Overview
SERVICE AREAS: NINE INDUSTRIES, NINE RHYTHMS
Installation is the same craft everywhere – but never the same schedule. Knowing when work is allowed in a given industry is what makes planning realistic.
Industries with their own rhythm
years of industrial installation
data centers worked in
Fitters on the job, DE & EN
- What it is about
THE INSTALLATION IS THE SAME – THE TIME WINDOW NEVER IS
Omega Mounting installs, maintains and repairs industrial plant across nine sectors. The technical tasks are similar: lifting, aligning, bolting, welding, connecting, commissioning. What differs is the framework in which it is allowed to happen.
In the automotive industry it is the weekend window. In logistics it is the night between two peaks. At the airport there is no window at all, only permits and restricted zones. In food production the cleaning cycle sets the rhythm, and in a data center it is the simple fact that there is no off switch.
Anyone who knows these differences does not promise dates that cannot be kept – and plans the job to fit the operation rather than fight it. That is why each of our sector pages describes the rhythm there before it talks about services.









Jobs from all nine sectors – from overhead conveyors to data centers.
- What applies throughout
FOUR THINGS THAT COUNT IN EVERY INDUSTRY
All trades in one team
Mechanics, electrics and welding from the same people. No company waiting on another – and one point of contact when something does not fit.
Working during live operations
Whether alongside the line, in a hygiene area, in a restricted zone or on the redundant string: we work where operations continue next door – with the necessary permits.
Our own lifting equipment and fabrication
Mini cranes and spider cranes for finished buildings, our own metalworking shop in Rodgau for the part that is no longer available. Both prevent downtime that others simply have to accept.
Cause rather than symptom
We do not just hand over a list of findings. Whatever can be fixed during the same visit, we fix – and we look for the reason, not just the symptom.
- The industries
WE ARE AT HOME IN THESE NINE INDUSTRIES
Each sector page describes the rhythm, the services and documented jobs from our job diary.
Data centers
The operation with no off switch
Lifting, rigging and installation of heavy equipment – in new builds and in live data centers alike.
View service area
Logistics & intralogistics
The night between two peaks
Loading and conveying systems, statutory inspection repairs, series rollouts across many sites.
View service area
Airport & security areas
The operation that never closes
Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support.
View service area
Energy & standby power
The window that must not exist
Standby power units up to 3 MW, generator servicing, exhaust and silencer systems.
View service area
Food & beverage
Between two cleaning cycles
Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations.
View service area
Crane construction
The moving hall section
Overhead, gantry and jib cranes including runways – including replacements on an existing runway.
View service area
Workshop equipment
The space that has to be cleared
Racking and storage systems, workshop bays, washing plants – installed and dismantled.
View service area
Automotive & Mechanical Engineering
The weekend window
Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line.
View service area
Steel structures & access platforms
The hot work permit
Platforms, stairs, custom structures – welded where the plant stands.
View service areaWe work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.
Send an enquiry- Industry comparison
EVERY INDUSTRY HAS ITS OWN RHYTHM
This overview is twenty years of working knowledge – and the reason we can promise dates that hold.
- Process
HOW A JOB RUNS WITH US
- From the job diary
PROJECTS FROM VARIOUS INDUSTRIES
No marketing copy – documented jobs with real findings, all in our job diary.
AIRPORT · DURING LIVE OPERATIONS
32 emergency stop buttons on the sorting system
Extended plant, extended safety – retrofitted by two fitters in two days, without stopping operations.
Read the project
DATA CENTER · CRANE LIFT
Five 100 m³ diesel tanks set into the pit
Five tanks of 16 tonnes each lifted over the shoring wall into the pit – lift plan, slinging concept and crane position by the lifting AP.
Read the project
FIRE PROTECTION · DATA CENTER FRANKFURT
Suppression cylinder room with 240 nitrogen cylinders
Gas suppression system for the data center: 240 nitrogen cylinders moved in, suppression cylinder room installed and aligned.
Read the project- Frequently asked questions
SERVICE AREAS: ANSWERED DIRECTLY
My sector is not on the list – would you still work for us?
Very probably yes. The nine areas are the ones where we have particularly deep experience, which is why they have their own pages. The underlying work – lifting, installing, welding, connecting, maintaining – is similar in any industrial operation.
Why do you place so much emphasis on a sector’s rhythm?
Because that is where most installation projects fail – not on the technology. A date that ignores a sector’s constraints falls apart: because the permit is missing, the cleaning window is shorter than assumed, or the redundancy must not be switched off. Knowing the rhythm means planning realistically from the start instead of renegotiating later.
Are you equally good in every sector?
No, and we say so openly. Our longest experience is with overhead conveyors, conveying systems and heavy move-ins – which is how our focus on automotive, logistics and data centers grew. In other areas we are good, but not specialists. That is why each sector page states what we have actually done there, with projects you can read up on.
Can you work throughout Germany?
Yes. We are based in Rodgau near Frankfurt, with our focus on the Rhine-Main region – where we are usually on site within a day in the event of a breakdown. For rollouts and larger projects we travel throughout Germany, including Leipzig, Hanover, Kassel and Fulda, and for relocations across Europe as well.
Do you take on individual small jobs?
Yes. Not every job is a major project – often it is a single repair, a missing spare part or a machine that needs to move two metres. Those in particular often turn into long-term working relationships, because we know the plant afterwards.
How quickly can you be there in an emergency?
We can be reached at any time by WhatsApp and phone, weekends included. In the Rhine-Main region we are usually on site within a day, and immediately for plant under permanent support. A standby generator replacement that began on a Sunday evening is documented in our job diary – not just claimed.
- Our services
WHAT WE TAKE ON IN EVERY INDUSTRY
Installation in existing facilities
Heavy loads into finished buildings
Cause rather than symptom
What cannot be bought
Dismantling and clearance
Dismantle, relocate, restart
Platforms, stairs, on-site welding
What goes into the hall
WHICH INDUSTRY DO YOU WORK IN?
Tell us briefly what it is about and when work is allowed at your site – we will come back with a realistic assessment.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt
- Local pages
All locations with their own page
51 locations with their own page – behind them the same crew from Rodgau, the same workshop, the same 6 am departure. Your location is missing? We will still work for you – give us a call.
For properties and facilities with special access rules: Bundeswehr, defence and critical infrastructure.
Lieber nach Region als nach Branche? Wir haben Übersichtsseiten für Industriemontage in Hessen, Industriemontage im Rhein-Main-Gebiet and Maschinenumzug in Hessen.