CUSTOM FABRICATION FOR EXISTING PLANT

We are not a metal shop that builds everything. We make the one part that gets your plant running again – when the manufacturer no longer supplies it, or when it never existed.

1

pieces – one-offs instead of series production

Rodgau

our own workshop with welding equipment and a milling machine

20+

years of industrial installation

24/7

Fitters on the job when it has to be quick

WHEN THE PART IS NO LONGER AVAILABLE

A plant is down because a component has broken. The manufacturer no longer supplies it, has discontinued the model or no longer exists at all. That leaves two options: write the plant off – or have the part made.

That is exactly what our workshop in Rodgau is for. We measure up the original or the installation situation on site, design from that and make the piece using welding and milling. And where no part ever existed, we design one: the impact protection that spreads the force into the surface, or the rail system that makes it possible to remove a fan bearing in the first place.

What we deliberately do not do: Series production, prototyping, metalwork for private customers. We make one-offs for industry – where an existing machine or plant needs a spare part and it has to happen quickly.

We have a clear relationship with special-purpose machine building: we do not design special-purpose machines, we install them. What we fabricate ourselves are the parts around them – substructures, platforms, brackets, fitting pieces – so that a plant actually fits into its place. For industrial installation in special-purpose machine building, our installation teams move in the manufacturer's plant, align it and install it at the end customer.

Impact protection in signal yellow at the corner of the production line
Test facility of a southern German automotive group: conversion with a fully welded oil pan.

FOUR REASONS WHY COMPANIES CALL US IN

Remaking parts that are no longer available

Manufacturer no longer supplying, model discontinued, company gone from the market: we make the component from a sample or from measurements – instead of writing off the plant.

Solutions that do not exist off the shelf

Not just remaking parts, but designing new ones for a specific problem: impact protection made from square tube with a 10 mm wall thickness, whose welded-in corners act as run-up ramps – you will not find that in any catalogue.

Our own metal workshop in Rodgau

Welding equipment and a milling machine in house. No supplier for everyone to wait on, and adjustments are still possible during installation instead of becoming a new order.

One-offs, not series production

We are not a series supplier and not a prototype shop. We make the one-off for an existing industrial plant – and we make it when time is short.

WHAT WE FABRICATE

Always related to an existing plant – from measuring up through manufacture to installation.

Spare parts from a sample

Pins, bushes, shafts, levers, brackets: we take the broken part or the installation situation as our template and make the replacement – even when no drawing exists any more.

Fitting pieces & adapters

When new meets old and the connecting dimensions do not match: spacers, adapter plates and mounts that bring the two together.

Custom impact and collision protection

Protection for plant that keeps getting hit – designed for the specific situation, bolted or welded in place on site.

Reinforcements & brackets

Reinforcement plates for worn bearing points, brackets for retrofitted equipment, mounts for additional loads – designed for the actual installation location.

Fixtures & aids

Sometimes it is not the component that is missing but the way to get at it: to remove a fan bearing we built a rail system, because there was no other route.

Measuring up & design

We measure up the real object and design from that – not from a drawing describing how things looked twenty years ago. That is why it fits first time.

THREE ROUTES TO THE MISSING PART

Which route is the right one is decided by looking at the component – not over the phone. Send us photos and we will tell you.

Adapting a catalogue part

The fastest route

Something similar is available and only needs adapting. Cheap and quick – we always check this first before making anything new.

Remake from a sample

The most common case

The original serves as the template, even when broken. We measure up, design and make the replacement – often within days, instead of waiting months only to be told it is discontinued.

Neukonstruktion

When it never existed

For a problem no catalogue solves: guarding, a fixture or a mount designed for this specific plant. More effort – but often the only solution that holds.

FROM THE DEFECTIVE PART TO THE INSTALLED REPLACEMENT

01FINDINGSPhotos of the damaged part and the installation situation, usually followed by a site visit. Only then do we know whether it is a remake or a new design.
02SITE SURVEYMeasuring on the original or at the installation point – seating dimensions, tolerances, load directions. Plant that has grown over time rarely matches the drawing.
03FABRICATIONDesign and manufacture in our workshop in Rodgau: welding, milling, drilling, protective coating – as a one-off.
04INSTALLATIONWe do not just drop the part off – we fit it, adjust it on site and check that it works.

PROJECTS FROM CUSTOM FABRICATION

No marketing copy – documented jobs with real findings, all in our job diary.

CUSTOM FABRICATION: STRAIGHT ANSWERS

Do you make series parts or prototypes as well?

No. We are not a series supplier and not a prototype shop. We make one-offs for existing industrial plant – the spare part that can no longer be bought, or the custom design for a specific problem on a specific machine. For series work and development contracts, other companies are the right address.

Do you work for private customers or do general metalwork?

No, we work exclusively for industrial operations and always in relation to an existing plant. Gates, domestic railings and the like are not part of what we offer – there are metalworking shops and forges that do that better and cheaper.

Can you remake a part when no drawing exists any more?

Yes, that is the normal case. We take the original part as our template – broken or not – or measure up the installation situation on site and design from that. What matters are seating dimensions, tolerances and load directions, not the old drawing. Send us photos and we will tell you whether it can be done.

How quickly can something like this be made?

That depends on the part, but the time advantage is usually the real reason clients come to us: a remake is often ready within days, whereas a discontinued part at the manufacturer means months of waiting or replacing the whole assembly. If your plant is down, reach us by WhatsApp or phone.

Do you fit the part as well?

Yes, and that matters to us. We do not just drop it off – we fit it, adjust it on site where needed and check that it works. Since we install, maintain and weld anyway, our responsibility does not end at the workshop door.

What does a custom part cost?

That can only be answered honestly once we have seen it – material, effort and accessibility determine the price. The right comparison, though, is rarely a catalogue part but the alternative: replacing the whole assembly, or the plant standing still. Measured against that, the one-off is almost always the cheaper solution.

WHAT ELSE WE TAKE ON

Installation in existing facilities

Heavy loads into finished buildings

Cause rather than symptom

Custom fabrication

You are here

Dismantling and clearance

Dismantle, relocate, restart

Nine industries at a glance

Platforms, stairs, on-site welding

ARE YOU MISSING A PART?

Send us photos of the damaged component and the installation situation – we will tell you whether we can remake it and how long it will take.

100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt

Gantry crane and self-fabricated rail system in front of the paint shop fan
Repair instead of replace: a refurbished curved rail from an electric overhead conveyor.
en_GBEnglish