INDUSTRIAL INSTALLATION FOR FOOD & BEVERAGE

In food production it is not the shift that sets the pace but the cleaning cycle. We work to that rhythm – and leave the hall in the condition hygiene demands.

80

overhead conveyor carriers in one refurbishment

~1 km

of rail cleaned and serviced

15+

years of experience with electric overhead conveyors

24/7

fitters on the job

HERE, CLEANING SETS THE PACE

Omega Mounting maintains, repairs and installs production equipment in food and beverage plants – from bakery machinery and overhead conveyors to tanks and silos. What sets this apart from other industrial installation work is less the technology than the constraints: whatever happens in the hall has to be compatible with hygiene requirements.

In practice that means: welding and cutting only with extraction, segregated from production and with a permit. Tools and materials entering the area are cleaned beforehand. And after the work we do not just tidy up – we hand over what the cleaning team needs.

The time window usually sits between two cleaning cycles – short, fixed and rarely moveable. So whatever can be prepared is made beforehand in our workshop in Rodgau.

Cleaned conductor rail with bare contact tracks
Test facility of a southern German automotive group: conversion with a fully welded oil pan.

FOUR REASONS WHY FOOD PRODUCERS CALL US IN

Working hygiene-compliant

Extraction while welding, segregation from production, cleaned tools, a clean handover. Anyone who cannot manage that in a food plant does not get called back.

Servicing food and bakery machinery

Mixers, ovens, conveying and filling equipment: we maintain and repair the machines production depends on – with mechanics and mechatronics technicians in the same team.

Overhead conveyors in hygiene areas

Over 15 years of overhead conveyor experience, here under tougher conditions: 80 carriers refurbished with new pins and bearing points, around a kilometre of rail cleaned and serviced.

Moving in & dismantling machinery

Robot lifted out of a bakery with a mini crane, silos and tanks positioned: we get equipment to places where a crane has long since run out of room.

WHAT WE TAKE ON IN FOOD & BEVERAGE

From servicing individual machines to relocating a complete production line – mechanics, electrics and welding from one team.

Maintenance & servicing

Servicing bakery and food processing machinery, finding wear before failure, carrying out repairs within the cleaning window – to a maintenance schedule or based on findings.

Electric overhead conveyors

Refurbishing pins and bearing points, cleaning rails and conductor lines, repairing curves and switches, overhauling carriers – during multi-shift operation too.

Conveying & filling equipment

Installing, converting and safeguarding belt systems, distribution and packaging equipment – including sensors, end positions and test runs.

Tanks, silos & vessels

Positioning, aligning and connecting – including in existing halls with tight access and limited ceiling height.

Machinery relocation & dismantling

A single machine or a complete line: dismantled, transported, rebuilt and commissioned. With a mini crane even where no forklift can reach.

Custom fabrication

Pins, fitting pieces, reinforcements, guarding: whatever can no longer be bought we make in our workshop – to suit the existing plant.

EVERY INDUSTRY HAS ITS OWN RHYTHM

A maintenance window in food production follows different rules from one in a factory. Knowing both means planning realistically.

Automotive & Mechanical Engineering

The weekend window

Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.

Food & beverage

Between two cleaning cycles

Hygiene and cleaning set the rhythm. The air in the hall has to stay clean – welding and cutting only with extraction, segregation and a permit.

Logistics & intralogistics

The night between two peaks

Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.

HOW A CLEANING WINDOW SUCCEEDS

01SITE WALKReviewing the plant and hygiene zones, going through the maintenance history, agreeing access routes and segregation with production.
02PREPARATIONProcuring and prefabricating parts, cleaning tools, firmly agreeing the window between two cleaning cycles.
03DELIVERYWithin the window we install, we do not improvise. Welding with extraction, segregated from production, in planned steps.
04HANDOVERFunction test, cleaning of the work area, photo documentation and report – the handover goes to the cleaning team, not to chance.

PROJECTS FROM FOOD & BEVERAGE

No marketing copy – documented jobs with real findings, all in our job diary.

FOOD & BEVERAGE: ANSWERED DIRECTLY

How do you make sure hygiene does not suffer?

We segregate the work area from production, weld and cut only with extraction and a permit, and clean tools and materials before they enter the area. After the work the area is handed over cleaned. Which measures are needed in each case is agreed beforehand with your production and hygiene managers.

Can you work in the window between two cleaning cycles?

Yes, in this sector that is the norm. These windows are short and rarely moveable, so we plan backwards: spare parts are ready, special items prefabricated, the team scheduled. The window is for installing – not for organising.

Do you service bakery and food processing machinery as well?

Yes. We maintain and repair the machines production depends on – from mixing and baking equipment through conveying and distribution to filling lines. Mechanics and mechatronics technicians work in the same team, so that mechanics, sensors and test runs are not split between three companies.

What do you do with an overhead conveyor that squeaks?

Squeaking is almost always a finding on the pins and bearing points, not the drive. At a food plant we therefore refurbished 80 conveyor carriers with new pins and bearing points and cleaned and serviced around a kilometre of rail including the conductor line. Anyone who just adds grease loses the noise and keeps the problem.

Can you relocate a machine or a whole line?

Yes. We dismantle, transport, rebuild and supervise commissioning. For tight buildings we use our own lifting equipment, including mini cranes – that is how we removed an industrial robot from a bakery that no forklift could get into.

Which regions do you operate in?

We are based in Rodgau near Frankfurt, with our focus on the Rhine-Main region. For larger projects and maintenance contracts we travel throughout Germany – including the Fulda area and northern Hesse.

AT HOME IN SEVERAL INDUSTRIES

Supervisor and rigger working in coordination on the unitData centers The operation with no off switch Lifting, rigging and installation of heavy equipment – in new builds and in live data centers alike. View service areaDoor control, sockets and new dock leveller control cabinet inside the buildingLogistics & intralogistics The night between two peaks Loading and conveying systems, statutory inspection repairs, series rollouts across many sites. View service areaFully installed emergency stop button on the parcel sorting systemAirport & security areas The operation that never closes Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support. View service areaMerlin Gerin Compact NS630N circuit breaker in the connection panelEnergy & standby power The window that must not exist Standby power units up to 3 MW, generator servicing, exhaust and silencer systems. View service area
Bearing point in the overhead conveyor hanger after fitting the new pinFood & beverage Between two cleaning cycles Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations. You are here
Crane controls on the bridge – installed right up to handover to the plant electricianCrane construction The moving hall section Overhead, gantry and jib cranes including runways – including replacements on an existing runway. View service areaNew hall during installation – pallet racks and cantilever rack componentsWorkshop equipment The space that has to be cleared Racking and storage systems, workshop bays, washing plants – installed and dismantled. View service areaOverhauled deflection block of the overhead conveyor hoist after reinstallationAutomotive & Mechanical Engineering The weekend window Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line. View service areaBefore and after: cracked and fully ground rail profileSteel structures & access platforms The hot work permit Platforms, stairs, custom structures – welded where the plant stands. View service area
Your sector is not listed? No problem.

We work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.

Send an enquiry

IS A JOB IN THE CLEANING WINDOW COMING UP?

Tell us briefly what it is about – we will come back with a realistic assessment of what fits into your window.

100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt

Dismantled industrial robot being moved out of the bakery with the mini crane
Repair instead of replace: a refurbished curved rail from an electric overhead conveyor.
en_GBEnglish