INDUSTRIAL INSTALLATION FOR LOGISTICS & INTRALOGISTICS
A logistics centre cannot stand still. We install, repair and replace loading and conveying equipment when the operation allows it – at night, at weekends or during live operation.
years of industrial installation
sites in one series rollout
loading ramps in three days
fitters on the job
- What it is about
WHEN THE TECHNOLOGY STOPS, THE CHAIN STOPS
In logistics there is a chain behind every system: if a loading dock fails, the yard backs up; if a sorter stops, the goods stay put. So in this sector it is not enough for a repair to be technically sound – it also has to fit a time window the operation dictates.
We work where operations continue alongside: above cordoned-off areas, on isolated dock doors, on the night shift between two peaks. Whatever can be prepared is made beforehand in our workshop in Rodgau – so that the window is used for installing, not improvising.
And when a spare part is no longer available, the job does not end there. We simply make it.
- Why us
FOUR REASONS WHY LOGISTICS OPERATORS CALL US IN
Repairs during live operations
Where health and safety allows, we work alongside the operation: cordoned-off areas, isolated sections, individual dock doors instead of whole halls. The chain keeps running while we repair.
Complete loading technology
Dock levellers, folding ramps, sectional doors, buffers, wheel chocks and restraint systems: one point of contact for the entire loading bay instead of four companies waiting on each other.
Series rollouts across many sites
The same equipment at 50+ sites, the same standard, documented to the same template. We plan the route, schedule the teams and deliver a clean report for every location.
Beyond the standard too
When the part is no longer available or never existed, we make it: custom impact protection, fitting pieces, reinforcements, special constructions. Our own workshop with welding and milling in Rodgau.
- Services
WHAT WE TAKE ON IN LOGISTICS & INTRALOGISTICS
From a failed loading dock to a rollout across 50 sites – mechanics, welding and electrics from one team.
Loading & door technology
Replacing dock levellers and folding ramps or converting them to hydraulics, installing and repairing sectional doors, buffers, impact protection, wheel chocks and restraint systems.
Conveying & sorting systems
Tilt trays, tilting airlocks, belt and roller conveyors: repairs to frames and bearing points, drive replacement, fixing causes instead of symptoms.
UVV repairs & release
Properly repairing flagged welds and load-bearing structures, documenting the work and bringing the closed dock door back into service.
Warehouse & racking technology
High-bay racking, cantilever and pallet racking, storage lifts and paternoster units: installed, relocated, complete site moves including reassembly.
Series rollout
The same work at many sites – planned as a route, with dedicated teams, consistent execution and a report for each location.
Custom fabrication
Custom impact protection, fitting pieces, reinforcement plates, brackets: whatever can no longer be bought is made in our workshop.
- Industry comparison
EVERY INDUSTRY HAS ITS OWN RHYTHM
A maintenance window in logistics follows different rules from one in the automotive industry. Knowing both means planning realistically.
The weekend window
Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.
The night between two peaks
Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.
Between two cleaning cycles
Hygiene and cleaning set the rhythm. The air in the hall has to stay clean – welding and cutting only with extraction and a permit.
- Process
HOW A NIGHT WINDOW SUCCEEDS
- From the job diary
PROJECTS FROM LOGISTICS & INTRALOGISTICS
No marketing copy – documented jobs with real findings, all in our job diary.
CONVERSION · LOGISTICS CENTRE FRANKFURT
From manual to hydraulic: folding ramps replaced
The old manual folding ramps had reached the end of their life. Replaced with hydraulic dock levellers – including controls, electrics and adapting the door reveal.
Read the project
UVV REPAIR · LOADING DOOR
Dock door closed after an inspection defect
Cracked welds on the support brackets had put two loading docks out of service. Welds ground out, re-welded, protected – and the dock back in operation.
Read the project
LOADING TECHNOLOGY · ASCHAFFENBURG
22 t cable drum loaded UV-safe
Cable drum enclosed UV-safe and loaded at Aschaffenburg port – the fixing solution for the protective cover was devised directly on site.
Read the project- Frequently asked questions
LOGISTICS & INTRALOGISTICS: ANSWERED DIRECTLY
Do you work at night and at weekends?
Yes – in logistics that is more the rule than the exception. We plan night and weekend windows in from the start and agree them with shift management and security. Where health and safety allows, we also work alongside live operations – above cordoned-off areas or on individual, isolated dock doors.
How quickly can you be on site for a failed loading dock?
We can be reached at any time by WhatsApp and phone and are usually at the dock within a day in the Rhine-Main region. Whether it stays a temporary fix or gets repaired straight away depends on the findings: whatever we can solve with what we carry, we solve immediately – for everything else we prefabricate the parts and come back with a firm date.
Can you handle a rollout across many sites?
Yes. We have rolled out wheel chock and restraint systems at more than 50 sites. We plan the route, schedule dedicated teams, carry out the work identically everywhere and deliver a separate report for each location. The advantage for you: one point of contact instead of a dozen regional firms with varying results.
Do you handle inspection defects and recommissioning as well?
Yes. We properly repair flagged welds and load-bearing structures and document the work so the closed dock door can be released again. The formal re-inspection is carried out by your competent person or inspector – we provide the basis for it.
What do you do when a spare part is no longer available?
Then we make it. Our workshop in Rodgau has metalworking, welding and a milling machine – fitting pieces, reinforcement plates, brackets and custom impact protection are made in house. With older loading and conveying equipment in particular, that is often the only route that does not end in replacing the whole system.
Which regions do you operate in?
We are based in Rodgau near Frankfurt, with our focus on the Rhine-Main region. For rollouts and larger projects we travel throughout Germany – including Leipzig, the Hanover area and sites right across the country.
- Other service areas
AT HOME IN SEVERAL INDUSTRIES
Data centers
The operation with no off switch
Lifting, rigging and installation of heavy equipment – in new builds and in live data centers alike.
View service area
Logistics & intralogistics
The night between two peaks
Loading and conveying systems, statutory inspection repairs, series rollouts across many sites.
You are here
Airport & security areas
The operation that never closes
Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support.
View service area
Energy & standby power
The window that must not exist
Standby power units up to 3 MW, generator servicing, exhaust and silencer systems.
View service area
Food & beverage
Between two cleaning cycles
Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations.
View service area
Crane construction
The moving hall section
Overhead, gantry and jib cranes including runways – including replacements on an existing runway.
View service area
Workshop equipment
The space that has to be cleared
Racking and storage systems, workshop bays, washing plants – installed and dismantled.
View service area
Automotive & Mechanical Engineering
The weekend window
Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line.
View service area
Steel structures & access platforms
The hot work permit
Platforms, stairs, custom structures – welded where the plant stands.
View service areaWe work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.
Send an enquiryIS A PLANT AT A STANDSTILL?
Tell us briefly what it is about – we will come back with a realistic assessment of what can be done in the next window.