- Service area
INDUSTRIAL INSTALLATION FOR AIRPORTS & SECURITY AREAS
For most installation companies the job ends at the security checkpoint. For us it begins there – with our own fitters, security cleared under German aviation security law.
years of industrial installation
On-site sorter support
fitters cleared under aviation security law
fitters on the job
- What it is about
IN A SECURITY AREA, WHO IS ALLOWED IN COMES FIRST
Omega Mounting installs, maintains and repairs conveying, sorting and security systems at airports and in other restricted areas. Our fitters have passed the background check required under German aviation security law – they get through the checkpoint without a permanent escort and stand at the machine instead of waiting at the gate.
It sounds like a formality, but it determines the schedule. Anyone who has to register, escort and sign out every tradesman individually loses half a day before the first spanner is picked up. And the more companies involved, the more often exactly that happens.
That is why, in restricted areas, we take on as many trades as possible ourselves – mechanics, electrics, welding and, where needed, plumbing and air conditioning too.
- Why us
FOUR REASONS WHY SECURITY AREAS CALL US IN
Fitters with aviation security clearance
Our people are security cleared and permitted inside the restricted zone. No permanent escort, no waiting at the gate, no half day lost to registrations.
All trades from one source
In a restricted area every additional company counts double. For a security facility in the Taunus we were booked only to position the containers – in the end we also took on the plumbing, power and air conditioning.
Ongoing support during live sorter operations
At Frankfurt Airport we look after a shoe sorter running 24/6 with several mechatronics technicians on site. Fault, diagnosis, repair – with no travel time and no waiting.
Baggage & cargo handling systems
Take-away conveyors, ULD handling systems, drive stations, tilt trays: we know the equipment the operation runs on – from maintenance, repair and conversion work.
- Services
WHAT WE TAKE ON AT AIRPORTS AND IN RESTRICTED AREAS
From a single fault on the sorter to complete infrastructure inside the restricted zone – mechanics, electrics and welding from one team.
Baggage & cargo handling systems
Servicing take-away conveyors and ULD equipment, overhauling drive stations, finding wear before failure – including dry ice blasting where conventional cleaning is not possible.
Sorting technology & sorter support
Shoe sorters, tilt trays and distribution systems: fault clearance, wear part replacement and permanent support in shift operation with our own team on site.
Emergency stop & safety systems
Retrofitting and extending emergency stop buttons, sensors and safety devices – on a sorting system at Frankfurt Airport that meant 32 emergency stops in two days.
Perimeter & fencing systems
Repairing and upgrading security fencing: replacing damaged panels, straightening posts, closing gaps – where the perimeter is what counts.
Impact protection & steel structures
Impact protection from square tube with a 10 mm wall thickness, platforms, stairs and landings: designed, manufactured and installed where tugs and dollies would otherwise keep damaging the equipment.
Modular rooms & infrastructure
Setting up container facilities and making them fully usable – plumbing, fresh water with trace heating, power and air conditioning included. One point of contact instead of five companies with access problems.
- Industry comparison
EVERY INDUSTRY HAS ITS OWN RHYTHM
A maintenance window at an airport follows different rules from one in a factory. Knowing both means planning realistically.
The weekend window
Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.
The operation that never closes
There is no real shutdown window, only permits, restricted zones and night hours with less traffic. Anyone working here has to be security cleared and able to work with an escort.
The night between two peaks
Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.
- Process
HOW AN INSTALLATION IN A RESTRICTED AREA SUCCEEDS
- From the job diary
PROJECTS FROM AIRPORTS & SECURITY AREAS
No marketing copy – documented jobs with real findings, all in our job diary.
SAFETY SYSTEMS · FRANKFURT AIRPORT
32 emergency stop buttons on the sorting system
Extended sorting system, extended safety: 32 emergency stop buttons and sensors retrofitted – by two fitters in two days, during live operation.
Read the project
IMPACT PROTECTION · FRANKFURT AIRPORT
Impact protection that spreads the force into the surface
Tugs with dollies had damaged the take-away rollers of the castor deck. Square tube with a 10 mm wall thickness, welded-in corners acting as run-up ramps – bolted rather than welded, so it can be replaced.
Read the project
RESTRICTED AREA · TAUNUS
Container facility for a security service
Booked to position the units, we ended up doing everything: levelled ground, plumbing with frost-protected fresh water, power connection and two split air conditioning systems.
Read the project- Frequently asked questions
AIRPORTS & SECURITY AREAS: ANSWERED DIRECTLY
Are your fitters security cleared for the restricted area?
Yes. Our fitters have passed the background check required under German aviation security law and are permitted to enter the restricted area. For work on other sensitive sites we bring the clearances required there as well. That saves you the permanent escort and the time lost by every uncleared contractor.
Can you support a system permanently, not just handle individual jobs?
Yes. At Frankfurt Airport we look after a shoe sorter running 24/6 with several mechatronics technicians on site. Faults are picked up immediately, wear parts replaced and recurring causes eliminated instead of being fixed again each time. We set up support arrangements like this for other systems too.
Do you work during live airport operations?
Yes – there is usually no other way, because an airport does not close. We work in cordoned-off areas, on isolated sections and during quiet night hours, coordinated with the operator. Where a system has to stop completely, we plan the window as short as possible and prepare everything that can be prepared.
Do you take on trades beyond installation itself?
Yes, and in a restricted area that is often the real advantage. For a security service’s container facility we were originally booked only to position the units – in the end we also took on plumbing, frost-protected fresh water, the power connection and air conditioning. Fewer companies inside the restricted zone means fewer registrations, less escorting and one point of contact for the result.
How quickly can you be on site when there is a fault?
We can be reached at any time by WhatsApp and phone and are usually on site within a day in the Rhine-Main region. Where we support a system permanently, the team is on the premises anyway – and then response time counts in minutes rather than hours.
Which locations do you work at?
We are based in Rodgau near Frankfurt, with our focus on Frankfurt Airport and the Rhine-Main region. We have also worked at Kassel Airport and on a military site in the Taunus, among others. For larger projects we travel throughout Germany.
- Other service areas
AT HOME IN SEVERAL INDUSTRIES
Data centers
The operation with no off switch
Lifting, rigging and installation of heavy equipment – in new builds and in live data centers alike.
View service area
Logistics & intralogistics
The night between two peaks
Loading and conveying systems, statutory inspection repairs, series rollouts across many sites.
View service area
Airport & security areas
The operation that never closes
Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support.
You are here
Energy & standby power
The window that must not exist
Standby power units up to 3 MW, generator servicing, exhaust and silencer systems.
View service area
Food & beverage
Between two cleaning cycles
Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations.
View service area
Crane construction
The moving hall section
Overhead, gantry and jib cranes including runways – including replacements on an existing runway.
View service area
Workshop equipment
The space that has to be cleared
Racking and storage systems, workshop bays, washing plants – installed and dismantled.
View service area
Automotive & Mechanical Engineering
The weekend window
Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line.
View service area
Steel structures & access platforms
The hot work permit
Platforms, stairs, custom structures – welded where the plant stands.
View service areaWe work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.
Send an enquiryPLANNING AN INSTALLATION IN A SECURITY AREA?
Tell us briefly what it is about – we will come back with a realistic assessment of what is feasible and which permits it requires.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt