MAINTENANCE OF STANDBY POWER SYSTEMS AND EMERGENCY GENERATORS
So that the generator runs when the grid is gone: mechanical maintenance, repair and load testing for standby power systems in data centers and industrial plants – from the oil change to the exhaust system, in the Rhine-Main region and across Germany.
- What it is about
A STANDBY POWER SYSTEM HAS TO RUN PRECISELY WHEN EVERYTHING ELSE FAILS
An emergency generator in a data center may run thirty hours a year – and has to carry full load in every one of them. That is why maintenance here is not routine but the only proof that the system will start in an emergency. Omega Mounting takes on the mechanical maintenance and repair of standby power systems: engine, generator, cooling system, fuel system with day tank, AdBlue and SCR system and the complete exhaust system up to the system's exhaust stack.
Oil and filter changes are part of it, but they are the smallest part. What matters is what else a maintenance plan covers: coolant and radiator, starter batteries, belts and pre-heating, the exhaust line with expansion joints, silencer and SCR catalyst, the day tank with transfer pumps and bund – and finally the load test that shows whether it all works together.
We work on systems in data centers, industrial plants, logistics centres and critical infrastructure – not on heating systems or domestic fireplaces. Our advantage: we often know the generator sets from moving them in, and we have the lifting equipment and workshop when a generator has to come out of the basement for an overhaul.
- Why us
FOUR REASONS WHY OPERATORS CALL US IN
We know the system from moving it in
Lifting equipment and workshop in the same team
Maintenance in a live data center
Manufacturer-independent, coordinated with the service partner
- Services
WHAT WE MAINTAIN ON STANDBY POWER SYSTEMS
Engine and operating fluids
Cooling system and radiator
Exhaust system and exhaust stack
AdBlue and SCR system
Fuel system and day tank
Generator, batteries and load test
- maintenance strategy
THREE WAYS TO LOOK AFTER A STANDBY POWER SYSTEM
Acting before it fails
Fixed intervals, fixed price
When the generator set will not start
- Process
HOW A GENERATOR SERVICE RUNS WITH US
- From the job diary
JOBS ON STANDBY POWER SYSTEMS
GENERATOR OVERHAUL · BUILDING SERVICES
Generator through the access shaft
Generator set dismantled, generator separated from the engine, lifted vertically out of the plant room by mobile crane – and returned overhauled by the same route.
Read the project
RADIATOR · DATA CENTER OFFENBACH
Leaking radiator repaired
Radiator of an emergency generator in a live data center removed, repaired and reinstalled – in the maintenance window, without losing standby readiness.
Read the project
EXHAUST SYSTEM · DATA CENTER OFFENBACH
Turbo silencer installed
Silencer moved into the exhaust line of a standby power system and installed – tight routes, heavy components, live operations next door.
Read the project- Frequently asked questions
STANDBY POWER SYSTEM MAINTENANCE: STRAIGHT ANSWERS
What maintenance intervals are usual for a standby power system?
As a guide: monthly or quarterly test run, annual maintenance with oil change, filter change and visual inspection of all assemblies, plus a full-load test at the defined interval. The decisive factors are manufacturer specification, operating hours and the requirements of your operator or insurer – from these we draw up the plan.
Do you carry out the load test with a load bank?
Ja. Wir bringen die Lastbank in Stellung, schließen sie mit unserer Elektrofachkraft an und fahren den Probelauf unter Last – mit Protokoll der Messwerte. Nur so ist belegt, dass Motor, Kühlung, Abgasanlage und Kraftstoffsystem gemeinsam die Nennleistung tragen.
Do you maintain generator sets from all manufacturers?
Ja, wir arbeiten herstellerunabhängig an Aggregaten bis 4 MW. Mechanik und Elektrik übernehmen wir gemeinsam – Motor, Kühlung und Kraftstoffsystem ebenso wie Steuerung, Schaltanlage und elektrische Prüfungen, mit eigener Elektrofachkraft. Alles in einem Termin.
Are the exhaust system, exhaust stack and SCR part of the maintenance scope?
Yes. Exhaust pipe, expansion joints, silencer, SCR catalyst, AdBlue system, brackets, insulation and roof penetration up to the system's exhaust stack are checked and repaired. We work exclusively on exhaust systems of standby power systems in data centers and industrial plants – not on heating chimneys or fireplaces.
What happens during a generator overhaul if the system is in the basement?
Then the generator comes to us: separating it from the engine, lifting it out through the access shaft or access route, having it overhauled, bringing it back in, aligning and coupling it. We plan lifting loads, routes and time windows in advance and bring the lifting equipment – mini crane, machine skates, mobile crane over the shaft.
How quickly can you be on site when there is a fault?
We can be reached around the clock via WhatsApp and phone, weekends included. In the Rhine-Main region we are usually at the generator set within a few hours, across Germany by arrangement. Existing clients with a maintenance contract have priority.
- Further services
WHAT ELSE WE TAKE ON
Installing and converting plant
Heavy loads into finished buildings
What cannot be bought
Dismantling and clearance
Dismantle, relocate, restart
Nine industries at a glance
Dedicated division, DE & EN
- All locations
STANDBY POWER SYSTEM MAINTENANCE – IN YOUR TOWN
Your location is not listed? From Rodgau we can reach any data center in the Rhine-Main region in around an hour, across Germany by arrangement – an overview can be found under Industries. For moving in emergency generators and transformers there is a dedicated page: Energy & standby power.