Office container dismantling

Project diary

We dismantled a production office – an office container – and re-erected it at a different spot in the plant.

The office container had to move to make room in production. That meant rearranging machines during live production to clear the new location.

Project profile

  • Client sector: Production plant
  • Scope: Office container dismantled – electrics, floor, supply lines, air conditioning, sandwich-panel roof and system walls – moved within the plant and re-erected; machines rearranged to clear the new location
  • Result: Office re-erected at its new location, with space freed up in production
Empty room after dismantling the office containers
Office container section and pallets during dismantling

The photos show the container being dismantled. We removed the electrics, took up the entire floor and disconnected the supply lines and the air-conditioning unit. Then came the sandwich-panel roof, followed by the side walls. The modular side walls were dismantled completely, moved within the plant and re-erected at the new location. Setting up, dismantling, relocating and connecting container facilities: our page Setting up and dismantling container facilities summarises this.

We keep your production running

Need help with a project? Call us on  +49 6106 239 25 88 or anfrage@omegamounting.de

Our service areas

Follow us on social media

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.

EnglishEnglish