Paternoster dismantling, hall office removal and a new sales counter

Dismantling

For our client, a specialist wholesaler, we dismantled a hall office to make room for a new sales counter.

The hall office was dismantled and broken down into its individual parts. It was important to separate all recyclable materials properly so that they could be recycled in the best possible way. The special feature here was paying attention to the glass panes and the insulation wool during dismantling, as these have to be disposed of correctly and professionally.

Project profile

  • Client sector: Specialist wholesaler
  • Scope: Hall office dismantled with recyclables separated, glass panes and insulation wool disposed of properly; ageing paternoster isolated and dismantled, side panels laid down with a forklift and round slings and moved out on dollies, trays and drives lifted out with an electric pallet stacker; new sales counter assembled and worktop fitted
  • Result: Space cleared for a modern storage system, with the new sales counter in place

From dismantling to the new sales counter

Dismantled paternoster parts on pallets outdoors

Clearing out the parts

Lifting out trays and drives

We also dismantled an ageing paternoster in the hall to make room for a modern storage system. The power supply was isolated and removed first; then we broke everything down into individual parts.

We laid the paternoster side panels down with a forklift and round slings, so no one had to tip the heavy parts over by hand.

The side panels were too wide for the forklift to take out of the hall, so we moved them out on dollies.

The new sales counter

New sales counter after removal of the paternoster

The counter is built from a plug-in shelving system, so it went together quickly.

Fitting the coated wooden worktop was the final step: every joint and edge has to be clean so that sales staff and customers feel comfortable. How a storage or racking system is converted during live operation is explained in our guide converting racking during live operations.

We keep your production running

Need help with a project? Call us on  +49 6106 239 25 88 or anfrage@omegamounting.de

Our service areas

Follow us on social media

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.

EnglishEnglish