Installing a high-pressure cleaner station for a municipal energy utility in northern Hesse

Project diary

Old unit out, new Kärcher wash station in – hydraulics included

First we removed the old high-pressure cleaner and prepared the new mounting position.

We aligned the station, fixed it to the wall and then installed and connected all electrical, mechanical and hydraulic components.

Project profile

  • Client sector: Municipal energy utility
  • Location: Northern Hesse
  • Scope: Old high-pressure cleaner removed; Kärcher wall station aligned, fixed and connected – electrical, mechanical and hydraulic; pressure test and commissioning
  • Team: Installation crew of mechatronics technicians
  • Result: Station pressure-tested and in service – our van got the first wash
Connection lines at the high-pressure cleaner station

The challenge is to fit the new unit into the existing set-up with the parts supplied and the planned layout.

That often means adapting parts or bending pipework to fit.

Once all components were installed and connected, we ran a pressure test and commissioned the station.

The client was so pleased with the work that our van got the first wash with the new high-pressure cleaner while we were still on site.

We keep your production running

Need help with a project? Call us on  +49 6106 239 25 88 or anfrage@omegamounting.de

Our service areas

Follow us on social media

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.

EnglishEnglish