Installation and maintenance for public authorities, emergency services and universities

Administrative sites, fire and rescue stations, depots, universities and research institutes: we install, service and relocate equipment in buildings with access control, live operation and formal permits.

Access-controlled

Secured areas, escorted access, security-cleared personnel

Lab and test rig

Workshop, laboratory and institute fit-out, test rigs, test stations

1 team

Mechanical, electrical, control and lifting work from one source

24/7

Work at night, at weekends and during holiday periods

What makes a public sector site different from an industrial hall

On public sector sites the installation work is rarely the hard part. The hard parts are access, permits and the time window – and whether a contractor can handle all three without someone having to follow them around.

Access is controlled, and that is routine for us. We have worked for years in the security area of Frankfurt Airport, in data centres requiring escorted access and in a nuclear facility – every time under the rules of the house, with advance notification, passes, briefing and handover documentation. The required security clearances for our fitters are completed and in place.

The operation continues. Administrative buildings have visitors, emergency stations have to be able to respond, universities have teaching and examination periods. We put the work into the windows the operation allows – holidays, nights, weekends, vacation periods – and we keep to them.

And the paperwork arrives beforehand. Commercial register extract, business liability insurance, clearance certificates, our own EHS standard, qualification records, risk assessment and method statement. We bring it with us rather than having it explained to us.

You will not have to explain the procurement route to us. Direct award and negotiated procedure under UVgO, restricted tender, construction work under VOB/A, framework agreements for recurring work; notices published on the federal e-Vergabe platform, on vergabe.hessen.de and on the HAD. For federal property the federal construction administration is involved – in Hesse the LBIH – on military sites the Bundeswehr service centre (BwDLZ), and on US installations the garrison Directorate of Public Works (DPW). We do not yet hold the German VOB prequalification; it is in preparation, so we submit the suitability evidence individually or work as a subcontractor to a prime.

What we take on for authorities, emergency services and universities

From laboratory fit-out to the plant room – with a crew that keeps to the rules of the house.

Workshop and lab

Workshop, laboratory and institute fit-out

Workbenches, lifting equipment, pillar jib cranes, extraction systems, service connections: placing, anchoring, connecting and testing – including in areas with special requirements.

Workshop fit-out in a nuclear facility
Research

Test rigs and test stations

Building, converting and relocating test rigs, installing and connecting test stations, manufacturing frames and mountings. Mechanical, electrical and control work come from the same team.

Plant installation
Plant rooms

Standby power, cooling and building services

Moving in, installing, servicing and replacing standby power systems, UPS, air conditioning and refrigeration – including the heavy routes through existing buildings.

Standby power and energy
Steelwork

Platforms, walkways and impact protection

Maintenance access, mezzanines, handrails, stairs and impact protection – made to measure for the space that exists, installed alongside the running operation.

Steelwork and access platforms
Logistics

Storage and conveying equipment

Installing, relocating, repairing and commissioning high-bay racking, automated storage units, paternosters and conveyor systems – floor by floor through the existing building if needed.

Operational equipment
Relocation

Relocating institutes, workshops and depots

Dismantling, labelling, transporting, rebuilding and commissioning – planned backwards from the date on which work has to resume.

Machinery and plant relocation

From enquiry to acceptance

Step 1

Enquiry, documents and site visit

We send the paperwork before the first visit, with a non-disclosure agreement on request. Then we look at the site: access, routes, doors, lifts, load capacities, access rules.

Step 2

Offer, permits and time window

The site visit produces a calculated offer – not an estimate. In parallel we settle permits, work approvals, escort requirements and the window the operation allows.

Step 3

Execution under the rules of the house

Notification, briefing, PPE, protective measures, clean routes. We work with a fixed crew – the same people who took the briefing come back the next day.

Step 4

Acceptance and documentation

Function test, photo documentation, record and handover – German or English, to your standard. On request with a risk assessment and method statement for your files.

Documented in our own jobs

Documented jobs from access-controlled environments – not a reference list.

Public sector and universities: answered directly

Do you work in secured and access-controlled sites?

Yes, that is everyday work. We have worked for years in the security area of Frankfurt Airport, in data centres requiring escorted access, in chemical and pharmaceutical parks with contractor clearance and in a nuclear facility – every time under the rules of the house and with handover documentation.

Are your fitters security cleared?

The required security clearances for our fitters are completed and in place. For the security area of Frankfurt Airport the required background checks under German aviation security law are in place. Which clearance your site requires is settled before we quote.

Do you take part in tenders and public procurement?

So far our work in this field has come to us as a subcontractor to main contractors and specialist firms. We do not yet hold our own prequalification – we are working on it. The usual suitability documents are provided on request, and we supply bills of quantities and site surveys to your format. What we do not do: engineering, weapons and ammunition technology, security services.

Can you work during holidays or outside teaching periods?

Yes, and that is often the best route. We put the work into the windows the operation allows – holidays, nights, weekends, vacation periods – and plan backwards from the point at which work has to resume.

What documents can you provide?

Commercial register extract, business liability insurance with a high sum insured, clearance certificates, our own EHS standard, qualification records for the fitters, risk assessment and method statement – on request with a non-disclosure agreement before the first site visit.

Do you also relocate institutes and workshops?

Yes. Dismantling, labelling, transport, rebuilding and commissioning – from a single machine to a complete workshop. Planning runs backwards from the restart date, not from the removal day.

How can a public authority contract you?

By direct award or negotiated procedure under UVgO, by restricted tender, as construction work under VOB/A, or through a framework agreement for recurring work. We follow notices on the federal e-Vergabe platform, on vergabe.hessen.de and on the HAD. On federal property the federal construction administration is involved – in Hesse the LBIH – on military sites the Bundeswehr service centre (BwDLZ), and on US installations the garrison Directorate of Public Works. We do not yet hold the VOB prequalification; it is in preparation, so until then we provide the evidence individually or work as a subcontractor.

Do you have work on an access-controlled site?

Describe the framework: site, task, time window, access rules. We send the documents in advance, with a non-disclosure agreement on request.

100 % non-binding and free of charge · Omega Mounting GmbH, Rodgau near Frankfurt

Fitter retensioning the mesh of a security fence with water pump pliers Finished room module with window, door and two split air conditioning units

Security fence in a cargo area: retensioning the mesh, checking the turnbuckles – repairs during ongoing operations.

Finished room module: window, door, air conditioning – set up ready for handover.