Mechanic (m/f/d)
Want to do more than just screw things together? Welcome to the Mounting Crew.
Do you have petrol running through your veins? Then join the team.
If you prefer tinkering to talking, find large machines fascinating and are keen to join a team that gets stuck in and delivers results together – then we should get to know each other!
As a mechanic (m/f/d) at Omega Mounting, you won't be stuck in the workshop, but right in the thick of things: working on exciting industrial projects, with the right tools, your own machinery – and, above all, with a team that sticks together.
Do you love technology? So do we.
Want to get out and about? We're mobile.
Do you like to get stuck in? Then you've come to the right place.
Your responsibilities with us:
-
Assembly and disassembly of machinery and equipment
You assemble machines in existing buildings, halls or new installations. -
Insertion and positioning of heavy components
Whether using a forklift, crane or lifting system, you ensure that everything is placed in the correct location. -
Troubleshooting & Maintenance
You recognise when something isn't running smoothly – and get it back on track. Proactive, structured and with the right tools. -
Support lift plans, safety concepts and documentation
You are part of a team that works professionally – from planning to minutes. -
Support for conversions, extensions and dismantling
We often work during ongoing operations – your task: think, help shape, share responsibility.
What you should bring with you:
- Completed training as a mechanic or comparable (automotive, industrial mechanics, mechanical engineering, etc.)
- Experience in handling tools, machines and technical equipment
- Technical understanding and ability to work independently
- Class B driving licence (BE or higher is an advantage)
- Keen on teamwork, technology and challenges
Why you've come to the right place:
-
Large machines. Large projects.
From robotics to heavy-duty equipment: you operate technology that others only know from glossy brochures. -
Achieve something together.
Team spirit is very important to us. You are not just a number, but part of our mounting crew. -
Top-of-the-range equipment.
Modern vehicles, well-equipped tools, clean work clothes – you have everything you need. -
A boss you can relate to.
Tobi is not just the boss, he also gets stuck in. Flat hierarchies, direct communication – and genuine teamwork. -
Genuine appreciation.
We celebrate successes together – whether it's with a barbecue after work or through fair pay.
Curious?
Then become part of a team that moves industry forward..
Apply now directly via our 90-second application form – no CV required!