Industrial assembly for automotive & mechanical engineering
When cycle times, precision and responsibility come together.
Automotive & Mechanical Engineering
When there's no room for error
The automotive and mechanical engineering industries are all about maximum cycle rates, sensitive interfaces and uncompromising process reliability. This makes it all the more important to have an experienced partner at your side who not only understands industrial assembly tasks – but lives and breathes them.
With Omega Mounting, you can rely on true practitioners who speak your language, understand your challenges and implement your projects as if they were their own. Whether conveyor technology, welding cells, test benches or special-purpose machines: we ensure that your system runs – and runs – and runs.
100% non-binding & free
Our services in the automotive and mechanical engineering sector
Experience meets technology. Reliability guaranteed.
Bringing in heavy machinery
We take care of the safe installation of your machinery and equipment – even in confined spaces and sensitive infrastructure.
Mechanical & electrical assembly
Our specialists will assemble your machines reliably, both electrically and mechanically—ready for operation, precise, and compliant with standards.
Lift & Shift under difficult conditions
Whether low hall heights, sensitive floors, or narrow routes—we move your components precisely and gently to their destination.
Plant conversions in existing facilities
We carry out your conversion projects during ongoing operations—with minimal disruption and maximum planning reliability.
Safety coordination & acceptance
From risk assessment to bilingual acceptance reports: we document all processes completely and transparently.
Crane & heavy-duty logistics
We plan and coordinate your crane deployment—including lifting plans, positioning areas, and suitable lifting technology—all from a single source.
Reference customers
These customers already trust us in the automotive and mechanical engineering sectors
Typical application scenarios
From individual orders to complex line projects
-
Relocation of complete production lines
Whether individual stations or complete production lines: we take care of coordination, dismantling, transport, and reassembly—both nationally and internationally. -
Bodywork, press shops & conveyor technology
Whether heavy presses or finely tuned conveyor systems – we handle assembly, disassembly, or relocation with the utmost precision and safety standards. -
Robot stations, welding cells, and automation technology
We ensure that your automated systems are quickly back up and running—from installation to handover. -
Special machine construction & test bench technology
Individual systems require tailor-made solutions – we move and assemble your special-purpose machines with sensitivity and technical expertise.
100% non-binding & free
Why Omega Mounting?
Your advantages with us at your side
- Technical understanding: Our teams bring their own industry experience from mechanical engineering, automotive, and plant engineering.
- Highest flexibility: Weekend and night installations, flexible team sizes, fast response times.
- Safety & Certifications: PPE, slings, climbing technology, welding experience—we know the industry's safety standards.
- Team with a can-do attitude: Our crews think for themselves, get stuck in, and don't give up until everything is in place.
- Modern equipment & our own workshop: This allows us to be as self-sufficient as possible and always ready for action.
100% non-binding & free