Industrial dismantling
Dismantling machinery and industrial equipment safely and cleanly
Professional industrial dismantling
For systems that need to be removed – without risk, without residue
Production downtime costs money. That's why you need real doers who can realise complex industrial installations reliably and efficiently. Whether new construction, conversion or expansion - with Omega Mounting you can rely on experience, precision and maximum operational readiness.
Our teams assemble industrial systems and machines exactly according to plan - even under time pressure or during exceptional times such as weekends and public holidays.
As a real troubleshooter, we ensure that your production continues to run smoothly.
100% non-binding & free
Our services in the field of industrial dismantling
From individual machines to production lines – we dismantle without leaving any residue
Partial and complete dismantling of industrial plants
Reliable dismantling of individual machines, plant components or entire production areas – safely, cleanly and precisely documented.
Dismantling with transport preparation
Disassembly, packaging, palletising, labelling and transport preparation – for storage, factory relocation or disposal.
Industrial transport & machine relocation
On request, we can also take care of the professional transport of your systems, machines and components– with suitable equipment and reliable logistics.
Demolition during renovation and modernisation
Are you planning a new plant? We create space – through the precise dismantling of old machines or assemblies.
Dismantling for reuse
Dismantling and preparation for reconstruction at another location – including labelling, cleaning and protective packaging.
Proper disposal & recycling
On request, we can also take care of the proper disposal of old materials in accordance with the applicable environmental guidelines – all documented.
Reference customers
These customers already trust us with industrial dismantling
Industrial dismantling by experts?
Your advantages with Omega Mounting
- Safe execution: dismantling by experienced specialists – with a focus on accident prevention and protection of existing structures
- Precise documentation: Each component is dismantled, labelled and listed in a traceable manner.
- Smooth processes: Well-coordinated teams, clean processes, minimal disruptions to ongoing operations
- Short operating times:rapid availability – even at weekends or for short-notice conversions
- Flexibility & experience: for dismantling machinery, plants, conveyor technology, platforms, supply systems, and much more.
100% non-binding & free
Industrial dismantling with a clear structure
This is how a dismantling project with Omega Mounting works
1. Project analysis & inspection
We inspect your facility, check the general conditions and define the scope of dismantling and safety requirements.
2. Decommissioning planning & preparation
We draw up a schedule, arrange for the separation of pipes and cables, secure the construction site and organise material logistics.
3. Implementation & Completion
We dismantle, document, pack, transport or dispose of items – depending on the project objective. Finally, handover takes place with a report.
Who is our industrial dismantling service ideal for?
When every screw counts
Our dismantling and demolition services are designed for companies that have no time for improvisation – but rely on professional implementation with safety awareness, speed and structure:
- Production facilities undergoing renovation, that need to make room for new technology
- Maintenance or plant managers who wish to temporarily dismantle or replace machinery
- Project managers for site relocationswho insist on clean dismantling and safe preparation for reconstruction
- Technical managers who replace, modernise or decommission existing equipment
- Customers with additional requirements for disposal, temporary storage or transport preparation
Do you recognise your company or your project? Then let's talk – we dismantle with planning, precision and responsibility.
100% non-binding & free
FAQs about industrial dismantling
Know what's coming – before you even pick up your first spanner.
That depends on the scope of the project and availability – simple dismantling work can often be completed within a few days. In urgent cases, we can also respond more quickly.
Yes – we also carry out dismantling work at night, on weekends or on public holidays if necessary. This allows you to avoid production downtime and stay on schedule.
Just as you wish: we take care of professional disposal, organise recycling or prepare components for reuse – all clearly documented.
Yes – our teams specialise in working in sensitive environments. We take all safety, noise and dust regulations into account and coordinate closely with your operations.
Industrial assembly - Project reviews
A look at our daily work at Omega Mounting
Silo Montage in Stadt z.B. Frankfurt
Aufstellen von insg. 3 Silos. Kernbohrung … Besonderheiten nennen
Text
Wasserkraftwerk mehr Stichpunkte
Unser Montage-Team hat die einzelnen Teile für ein Wasserkraftwerk in ein bestehendes Gebäude eingebracht.
Stahlbühne für den Flughafen Kassel
Für eine Produktionsfirma am Kasseler Flughafen galt es, durch eine Zwischenebene mehr Platz für Montagen und Lager zu schaffen