Lift & Shift Special Installations
Moving heavy loads. Safely. Controlled. Precisely.
Lift & Shift with Omega Mounting
When millimetres decide tonnes
Traditional assembly methods often reach their limits when components weigh several tonnes or need to be installed under difficult conditions. This is where our Lift & Shift team comes in: specialists who move heavy loads – with absolute control and experience.
Whether it's a generator, transformer, cooling unit or machine module: we provide the equipment, technology and personnel to carry out even the most complex installations precisely and safely.
In addition, we take care of all planning, coordination and documentation:
- Preparation of lift plans and lift studies
- Preparation of risk assessments
- Lifting and moving plant and machinery
- Installation and removal of machinery and equipment
- Crane coordination with our own network
- Everything from a single source – including special cranes, small cranes and lifting gear
- Upon request, we can produce all protocols, studies and documentation in two languages: German and English – both written and spoken.
100% non-binding & free
Our services in the area of lift and shift
Heavy-duty installations with a system
Crane deployment coordination & heavy-duty logistics
We take care of all the organisation and coordination with crane companies, low-loader transporters or special vehicles.
Installation & positioning of heavy components
CRAH units, chillers, transformers, emergency power systems, SCR systems, machine and support systems – safely installed using roller systems, air cushions, hydraulic lifting systems or special technology.
Working in confined spaces
Low hall heights, narrow routes or sensitive infrastructure? We bring the special tools and experience needed to get the job done.
Dismantling & relocation within existing buildings
Dismantling, relocation or internal transfer of machines or plant modules.
Safety coordination & acceptance testing
Full documentation, clear responsibilities – we carefully consider everything that is relevant to safety.
Can't find what you need?
Many challenges cannot be summarised in terms of service points. Please contact us directly – we will find a solution.
Reference customers
These customers already trust us with Lift & Shift
Lift & Shift with Omega Mounting
Your advantages at a glance
-
Experience & specialised technology
More than a decade of experience with installations during ongoing operations, in new buildings and under extreme conditions. -
Maximum control over every detail
With tact and sensitivity, checklists and forward-thinking logistics. -
Safety & Responsibility
SCC-certified personnel, structured processes, trained communication with other trades. -
Flexible & quickly available
Our specialist teams are deployed throughout Germany – at short notice and on a scalable basis. -
Everything from a single source
From planning to the final screw connection. Without interface losses. -
Bilingual documentation & communication
We provide all relevant documentation – from lift studies to acceptance reports – in German or English, whichever you require.
100% non-binding & free
This is how a lift and shift project works
Structured. Efficient. Transparent.
1. Project acceptance & feasibility study
We check everything on site: routes, subsoil, space conditions, load capacities. This enables us to plan realistically.
2. planning & coordination
We coordinate all parties involved, draw up lift and schedule plans, and coordinate safety concepts.
3. Implementation & recording
The team works precisely according to plan. Acceptance is carried out together with you and is documented.
Who is Lift & Shift right for?
When it gets big, heavy and complex
- Operators of data centres, industrial plants, production facilities
- General contractor and site manager with specialist trades
- Project managers with tight schedules and high security requirements
- Manufacturers of machinery or equipment who require an assembly partner for installation or delivery
Do you recognise your company or your project?
Enquire personally now
100% non-binding & tailored to your requirements.
100% non-binding & free
FAQs about lift and shift
Clearly answered – before it gets difficult
Our teams regularly handle the installation of machines, aggregates or plant components with individual weights ranging from several tonnes to complex systems with a total load of over 100 tonnes. It is not only the weight itself that is decisive, but also the logistical planning: What is the access like? What lifting equipment can be used? What safety-related factors need to be taken into account? We analyse all of this in advance. If your load can be physically moved, we will get it where it needs to be.
Narrow access routes, low ceiling heights and confined spaces within production halls are part of our everyday routine. We use air cushion technology, modular lifting systems, roller systems and small cranes, among other things, to work safely even under the most difficult conditions. Our planning takes into account the possible routes with millimetre precision – including load testing of floors and ceilings.
Yes. On request, we coordinate the entire transport chain – from the pick-up location to the final destination. This includes selecting and booking suitable cranes (mobile cranes, mini cranes, truck-mounted cranes, etc.), working with heavy haulage companies, securing transport routes and, if necessary, obtaining official permits.
Your advantage: you have only one contact person – and we take responsibility for the entire execution.
Absolutely. For complex installations, we create detailed lift plans in advance and, if desired, complete lift studies including all safety-related aspects. We also prepare risk assessments in accordance with the applicable regulations. All documents are available in German and English on request – fully documented and verifiable.
Depending on the scope of the project and lead time, we can carry out initial site visits, project inspections or preliminary planning within just a few days. Our specialised lift & shift teams are available throughout Germany and can be scaled flexibly – even for weekend work, night shifts or special appointments outside your operating hours.
Yes, we have many years of experience with installations during production operations – for example, in retrofit work, plant conversions or machine relocations. Our processes are designed to minimise the impact on your production. This means clear time slots, quiet technology, coordinated interfaces and smooth handover.
All our employees are SCC certified, regularly trained and experienced in working according to the latest safety guidelines. Before the start of a project, all participants are briefed on the specific safety requirements. In addition, we provide all protocols and documentation after project completion – in two languages if desired.
Tobias Schott – Founder, Managing Director and Project Manager at Omega Mounting. With over a decade of experience in industrial assembly and specialised logistics, he is your direct contact for all lift & shift matters. You can reach him by phone, email or directly via WhatsApp.
Lift & Shift - Projektrückblicke
A look at our daily work at Omega Mounting
Silo Montage in Stadt z.B. Frankfurt
Aufstellen von insg. 3 Silos. Kernbohrung … Besonderheiten nennen
Text
Wasserkraftwerk mehr Stichpunkte
Unser Montage-Team hat die einzelnen Teile für ein Wasserkraftwerk in ein bestehendes Gebäude eingebracht.
Stahlbühne für den Flughafen Kassel
Für eine Produktionsfirma am Kasseler Flughafen galt es, durch eine Zwischenebene mehr Platz für Montagen und Lager zu schaffen