Custom impact protection: a heavy-duty one-off protects a production plant near Offenbach

Rammschutz in Signalgelb an der Ecke der Produktionsanlage
Impact protection in signal yellow at the corner of the production line

How our metalworkers designed an almost indestructible impact guard – welded in Rodgau, installed on site, anchored and painted in signal yellow

Where forklifts with mesh pallets rush past every few minutes, sensitive equipment stands little chance. At a production plant near Offenbach, a production line and its ventilation equipment were to be permanently protected against impact damage – at a point where the forklifts move back and forth very fast. Off-the-shelf impact protection would not have lasted long there.

Our answer: anyone can do standard – we built it bespoke. In our workshop in Rodgau two men cut and welded the heavy structure in around a day. Two metalworkers then installed the guard on site in a single working day, anchored it into the floor with heavy-duty anchors, masked it up properly and painted it with hard-wearing signal yellow paint – primer first, then a good coat of yellow.

The photos show the whole process: the raw welded structure in black steel, the white primer – and the bright yellow end result now standing between the traffic route and the plant.

Project profile

Der fertige Rammschutz in Signalgelb – verankerte Bodenschiene und massiver Stahlrohr-Rahmen
The finished impact guard in signal yellow – anchored floor rail and heavy steel tube frame

What is impact protection?

Impact protection (also called collision protection) is a guard structure that keeps machines, plant, racking, columns or parts of a building safe from collisions with industrial trucks – forklifts, pallet trucks and tow trains. It absorbs the energy of an impact before it reaches expensive equipment: a bent guard rail costs a few hundred euros, a damaged ventilation duct or a wrecked production line quickly costs a production stoppage.

Impact protection is available as a standard catalogue item – bollards, rails, plastic hoops. For normal requirements that is often enough. It gets critical where heavy traffic, high speed and heavy loads come together: then the sheer mass of the structure and above all the anchoring decide whether the guard holds at the first real hit or is torn out of the floor.

Why was standard impact protection not enough here?

Because speed, frequency and load all come together at this point. The forklifts pass through the area very fast and continuously – loaded with mesh pallets whose corners and skids act like battering rams in a glancing blow. Directly behind: the production line and its ventilation equipment, whose sheet metal ducts are deformed by even a light knock.

For this requirement we designed a heavier guard structure than any catalogue offers – tailored to the plant, the corner situation at the building column and the traffic routes. Two frame bays enclose the corner of the plant and keep traffic at a distance without blocking maintenance access.

How is the structure built up?

Thought through from the bottom up – because the most dangerous zone is at floor level. Where the forklift tines travel, a heavy steel angle of 200 × 100 × 10 mm forms the base of the structure. It does two jobs at once: first, the entire guard is anchored into the floor through this angle with heavy-duty anchors – against buckling and being torn out on impact. Second, the angle acts as a continuous barrier against the tines themselves, which could otherwise run under any railing straight into the plant.

Above it, a frame of heavy 80 × 80 × 5 mm steel tube forms the actual guard: when a forklift comes in with its mesh pallet, this structure takes the blow – not the plant behind it. All joints are welded, not plugged together; the frame bays are built as a closed structure that transfers loads into the anchored floor rail.

Roh geschweißter Rammschutz aus 80x80-Stahlrohr auf verankertem Stahlwinkel
Raw welded guard of 80x80 steel tube on an anchored steel angle
Die fertig montierte Konstruktion an der Anlagenecke vor der Beschichtung
The finished structure at the corner of the plant before coating

Why is it primed and painted on site?

Because impact protection has two jobs: to protect – and to be seen. After installation our metalworkers masked the structure and the surrounding area properly and coated the steel completely: first a primer as corrosion protection, then a hard-wearing signal yellow topcoat. The signal colour makes the guard impossible for any forklift driver to miss, even from a distance – and the robust paint build-up shrugs off the rough day-to-day of industry with its scrapes and scratches.

Painting on site has a practical advantage: all welds, anchor points and adjustments made during installation disappear under one continuous, clean coating – with no transport damage to the finished surface.

A design that has proven itself

This is not the first time we have built to this design: guards on this principle – an anchored heavy-duty floor rail plus a welded steel tube frame – are already in service, made by us, in logistics centres and at Frankfurt Airport. The experience from those jobs feeds into every new installation, and the result is a design that is virtually indestructible in daily use.

Many of the guards we have welded stand in busy industrial plants – and achieve a long service life where standard solutions would have to be replaced regularly. That is exactly the difference between catalogue goods and bespoke metalwork.

Grundierter Rammschutz – Korrosionsschutz vor dem Signalgelb-Decklack
Primed guard – corrosion protection before the signal yellow topcoat
Rammschutz in Signalgelb an der Ecke der Produktionsanlage
Impact protection in signal yellow at the corner of the production line

Why Omega Mounting?

Conclusion

One day in the workshop, one day on site – and a production line with its ventilation now standing behind a virtually indestructible structure: an anchored floor rail of 200 × 100 × 10 mm steel angle against tines and pull-out, a heavy 80 × 80 × 5 mm steel tube frame against oncoming mesh pallets, signal yellow for visibility. Anyone can do standard – this guard is built for this exact place and this exact traffic.

If forklifts and sensitive equipment work too close together at your site, talk to us – before the first impact does.

Request a callback for your project now – Omega Mounting GmbH, Rodgau. As an installation company with its own workshop in the Offenbach district we are quickly on site in Offenbach, Frankfurt, Hanau and the whole Rhine-Main region – and we work throughout Germany.

Weitere Einsätze in der Stadt und unsere Anfahrt aus Rodgau: Industrial assembly in Offenbach.

Photo gallery of the job

Weiß beschichtetes Rammschutzgeländer vor einer Lüftungsanlage in Offenbach
Gelbes Rammschutzgeländer als Sonderanfertigung schützt die Anlagentechnik in Offenbach
Eckverbindung des gelben Rammschutzgeländers aus Stahl in der Nahaufnahme
Gelber Rammschutz entlang der Fahrspur mit Bodenmarkierung in Offenbach
Rammschutz in Signalgelb an der Ecke der Produktionsanlage
Impact protection in signal yellow at the corner of the production line

Are you planning a project of this kind?

Tell us briefly what it is about – we will come back to you with an honest assessment.

100% free and without obligation

Tobias Schott, Geschäftsführer der Omega Mounting GmbH, auf einer Baustelle vor einem Gerüst

Über den Autor

Tobias Schott

Geschäftsführer Omega Mounting GmbH, Rodgau · über 20 Jahre Praxis in Montage und Instandhaltung

Gelernter Mechatroniker und seit 2004 in Wartung, Instandhaltung und Industriemontage zu Hause – zuerst an der Seite seines Vaters, seit 2012 mit Omega Mounting: von der Elektrohängebahn in Frankfurt bis zur Krananlage im Hallenneubau. Plant und leitet als Lifting Appointed Person Hebearbeiten in Rechenzentren und auf Industriebaustellen im Rhein-Main-Gebiet, ist Ausbilder und Prüfer für Krane, Hubarbeitsbühnen und Teleskopmaschinen sowie Sicherheitsbeauftragter. Bei Einsätzen im Ausland kennt man ihn als „German Troubleshooter“ – der, den man ruft, wenn es auf der Baustelle klemmt. Was Qualität heißt, hat er nicht aus einem Handbuch, sondern von seinem Vater gelernt: Made in Germany als Anspruch an die eigene Arbeit, nicht als Etikett. Deshalb steht sie bei Omega Mounting an erster Stelle – vor Tempo und vor Preis. Das Auftragstagebuch zeigt die Einsätze, die sein Team geplant und umgesetzt hat – ohne Kundennamen, aber mit allem, was man daraus lernen kann.

Frequently asked questions

Impact protection (collision protection) shields plant, racking, columns and parts of buildings from collisions with forklifts and other industrial trucks. It is essential wherever traffic routes pass close to sensitive or expensive equipment – an impact then hits the guard structure instead of the plant.

When speed, traffic density or loads go beyond the usual – or the installation situation does not fit the standard grid. On this project forklifts with mesh pallets pass very fast right by the plant; the solution was dimensioned more heavily than catalogue goods and fitted exactly to the corner, the column and the maintenance access.

Through a continuous floor rail – here a 200 × 100 × 10 mm steel angle – fixed into the hall floor with heavy-duty anchors. It prevents the structure from buckling or being torn out on impact and at the same time blocks the forklift tines at floor level.

So that it is recognisable as a barrier from a distance – visibility is part of the protective effect. On this project it was properly masked, primed and coated on site with a hard-wearing signal yellow topcoat; the primer additionally protects the steel against corrosion.

With heavy construction and correct anchoring: many years, even in busy industrial plants. Guards of this design made by us stand in logistics centres and at Frankfurt Airport among other places – in daily use the structure is virtually indestructible.

Yes – this guard was prefabricated in our workshop in Rodgau and installed at a production plant near Offenbach. In the Rhine-Main region we are quickly on site, and elsewhere in Germany on request.

en_GBEnglish