About Omega Mounting
Troubleshooter for industry – with passion you can feel.
What motivates us?
An eye for what is feasible – and a passion for craftsmanship.
When you work with Omega Mounting, you don't get anonymous project management. You get a team that is passionate about what it does.
Many of us grew up with toolboxes – between our father's workbench and tractor restoration. Screwing, building and optimising was never just a job – it was a way of life.
Today, we bring this enthusiasm to your projects – combined with technical expertise, industrial experience and clear communication.
100% non-binding & free
What makes the mounting crew special
What you gain with us at your side
We speak industry
Our projects rarely take place on greenfield sites. We often work under real-life conditions – with limited space, active ancillary facilities and high time pressure. That's exactly what we're set up for.
We think along with you
Not just assembly according to plan – but genuine support. We bring not only muscle power, but also sound judgement, technical experience and logistical foresight.
We take responsibility
Security concepts, logging, interface coordination – you get a team that knows what to do and keeps track of everything.
We deliver solutions
Whether it's bringing in heavy machinery, dismantling existing structures or performing maintenance during ongoing operations: we take care of everything that is technically and logistically challenging.
Technology and team from a single source
Whether special cranes, lifting systems, transport logistics or coordination of external contractors – we deliver solutions, not construction sites.
Quick response to bottlenecks
When plant downtime is imminent, every hour counts. Our Lift & Shift team is available nationwide at short notice – for precise interventions.
What you can expect from us
We solve problems where others give up.
- Highly trained staff with sound training and further education
- State-of-the-art equipment for every application
- Equipped emergency vehicles, ready for immediate use
- In-house workshop for quick special solutions
- Own spare parts warehouse for short response times
- Own machinery including special equipment
- Team spirit, reliability & hands-on mentality
100% non-binding & free
Tobias Schott
Founder, doer & team player
‘I love working with my team to implement projects of all sizes for you.’
As the son of a machine fitter, Tobias Schott knew early on what career path he wanted to pursue. Even as a child, he was on construction sites, learning how to use welding equipment and torque wrenches in his father's workshop – and developing an eye for practical matters.
- Training as a mechatronics engineer
- Further training to become an IHK specialist
- Various additional qualifications (including welding technology, PPE, truss systems)
- 2012 Founding of Omega Mounting
- Since then, building a team that ‘thinks for itself, gets stuck in and sees things through’
The greatest source of pride?
His father even became part of the crew himself – until he retired. He was a walking toolbox and inventor of tricks. Customers and colleagues alike celebrated him.
Today, Tobias not only manages projects – he also works on the construction site himself. ‘Here, the boss still lends a hand himself.’
The Mounting Crew
– our core
Whether mechanical engineering, electrical engineering, electronics or machine fitting:
Our team brings a wealth of expertise to the table – complemented by further training in project and quality management,, safety and lifting technology and above all: Genuine passion.
Whether it's 6 a.m. on Monday or Sunday evening – when it matters, we're there.
100% non-binding & free
Back office & organisation
Anne Duchmann
To ensure that everything runs smoothly outside, you need structure inside.
Anne Duchmann keeps everything running smoothly in the background – invoices, enquiries, processes.