plant installation

Your experts for safe and efficient plant installation in industry

Plant installation with Omega Mounting

Complex industrial plants professionally assembled

If every screw has to be in place, you've come to the right place. The installation of industrial plants places special demands on planning, technology, and personnel.

With Omega Mounting, you can rely on an experienced team that assembles industrial plants quickly, safely, and with precision—even under difficult conditions or tight deadlines.

Whether it's a new installation, expansion, conversion, or modernization, we ensure that your production processes run smoothly. We work closely with your project managers, machine manufacturers, and other trades.

100% non-binding & free

Anlagenmontage Omega Mounting

Our services in the field of plant installation

From individual machines to complete production lines

Industriemontage Frankfurt Omega Mounting

Plant assembly for production and manufacturing

We assemble complete production lines, robotic cells, machining centers, and other systems with high technical precision.

Anlagenmontage Omega Mounting

Mechanical & electrical connection

We take care of the mechanical installation and coordinate with the electrical team to ensure precise interface connection.

Industriemontage Frankfurt Omega Mounting

Plant conversions & expansions

Do existing systems need to be adapted or expanded? We install new components or modify existing structures.

Industriemontage Frankfurt Omega Mounting

Installation of special systems & special technology

Whether special-purpose machines, supply systems, or prototypes—we also reliably commission customized solutions.

Integration into existing hall structure

We tailor installation measures to your structural conditions, e.g., in confined spaces or old facilities.

Industriemontage Frankfurt Omega Mounting

Installation during ongoing operation

We install our equipment in such a way that your production can continue – with safety coordination, dust protection, and timing according to your production schedule.

Reference customers

These customers already trust us with their plant installation

Anlagenmontage Omega Mounting

Your advantages when installing systems with us

Why Omega Mounting?

100% non-binding & free

Plant assembly with a clear structure

This is how an assembly project with Omega Mounting works

1. Analysis & on-site inspection

We come to you, check requirements, access points, and interfaces. From this, we create an initial feasibility analysis.

2. planning & coordination

We plan all processes, coordinate with contractors, and provide the appropriate tools, means of transport, and protective materials.

3. Assembly & installation

Our teams will assemble your system on schedule, document the intermediate steps, and hand it over ready for operation.

Who is our system installation suitable for?

We're there when you need us

Our services are ideal for companies that depend on precise, fast, and reliable assembly:

Do you recognize your company or your project? Then let's talk—we'll install your systems.

100% non-binding & free

Industriemontage Omega Mounting

FAQs about system installation

Everything you need to know about our installation services

Short-term assignments are possible - even within 24 hours, depending on the scope of the project. We react flexibly and prioritise urgent requests, especially during production downtimes.

Yes, we specialise in assembly work outside normal working hours - including night work, weekends and public holidays. This is how we minimise your downtime.

Our customers come from sectors such as automotive, logistics, mechanical engineering, the food industry, crane construction, packaging technology and many more. We adapt to the individual requirements of your industry.

Yes, on request we can take over the professional dismantling of old systems, including transport, disposal and full documentation - cleanly and in compliance with regulations.

Yes, once installation is complete, we check all functions, set up the systems and provide support during commissioning - so that everything runs smoothly.

Of course. We know that requirements sometimes change. Our teams react flexibly to changes in plans - even during ongoing assembly.

Naturally. Our fitters are equipped with professional equipment. We agree special tools or spare parts with you in advance or bring them with us directly.

Tobias Schott - the owner. He has over 20 years of experience in industrial assembly and will be at your side personally throughout the entire project or assign you a competent project manager from the team. 

Contact & Location

On site with you soon - with flexibility and reliability

en_GBEnglish