Industrial assembly for automotive & mechanical engineering

When cycle times, precision and responsibility come together.

Automotive & Mechanical Engineering

When there's no room for error

The automotive and mechanical engineering industries are all about maximum cycle rates, sensitive interfaces and uncompromising process reliability. This makes it all the more important to have an experienced partner at your side who not only understands industrial assembly tasks – but lives and breathes them.

With Omega Mounting, you can rely on true practitioners who speak your language, understand your challenges and implement your projects as if they were their own. Whether conveyor technology, welding cells, test benches or special-purpose machines: we ensure that your system runs – and runs – and runs.

100% non-binding & free

Automotive

Our services in the automotive and mechanical engineering sector

Experience meets technology. Reliability guaranteed.

Industriemontage Frankfurt Omega Mounting

Bringing in heavy machinery

We take care of the safe installation of your machinery and equipment – even in confined spaces and sensitive infrastructure.

Datencenter Bau Omega Mounting Industriemontage

Mechanical & electrical assembly

Our specialists will assemble your machines reliably, both electrically and mechanically—ready for operation, precise, and compliant with standards.

Lift & Shift under difficult conditions

Whether low hall heights, sensitive floors, or narrow routes—we move your components precisely and gently to their destination.

Industriemontage Frankfurt Omega Mounting

Plant conversions in existing facilities

We carry out your conversion projects during ongoing operations—with minimal disruption and maximum planning reliability.

Safety coordination & acceptance

From risk assessment to bilingual acceptance reports: we document all processes completely and transparently.

Datencenter Bau Omega Mounting Industriemontage

Crane & heavy-duty logistics

We plan and coordinate your crane deployment—including lifting plans, positioning areas, and suitable lifting technology—all from a single source.

Reference customers

These customers already trust us in the automotive and mechanical engineering sectors

Einsatzgebiete

Typical application scenarios

From individual orders to complex line projects

100% non-binding & free

Why Omega Mounting?

Your advantages with us at your side

100% non-binding & free

Industriemontage Omega Mounting

Automotive & Mechanical Engineering Project Reviews

A look at our daily work at Omega Mounting

Repair of an electric monorail track

Prototype construction for an automobile manufacturer

Relocation of an injection molding machine

en_GBEnglish