INDUSTRIAL INSTALLATION FOR CRANE CONSTRUCTION
Putting a crane into an empty hall is a trade. Getting one into a finished hall where work continues is our discipline.
installation height in existing buildings
double-girder overhead crane installed
years of industrial installation
fitters on the job
- What it is about
DIE HALLE STEHT SCHON – DER KRAN SOLL TROTZDEM REIN
Omega Mounting installs overhead, gantry, jib and suspension cranes including runways – mostly where the building has long been standing and production keeps running. That is exactly what sets the job apart from a new build: there is no open roof, no clear floor space and no crane reaching in from outside.
So we work with what is there. We bring components in along existing routes, lift section by section with our own equipment and cordon off only the area currently being worked above – the exclusion zone moves along and the rest of the hall stays usable.
And when an old crane is to be replaced, we first check what can be reused from the existing runway. Often more than the client expected.
- Why us
FOUR REASONS WHY COMPANIES CALL US IN
Krane in bestehende Hallen
A 16-tonne crane installed at over 30 metres, a suspension crane brought in through the open roof of an industrial plant. Anyone can do a new build – the finished hall with production running is the real task.
Replacement in existing facilities
Old double-girder crane out, two single-girder cranes in – on the existing runway, with the necessary modifications. Where others quote for a complete rebuild, we first check what can stay.
Von Schwenkkran bis Portalkran
A 2 t pillar jib crane, a 16 t double-girder overhead crane, gantry cranes, suspension cranes, runways: the full range rather than a single type – and independent of manufacturer.
Kranbahn & Stahlbau selbst
Brackets, runway girders, reinforcements and modifications are made in our own workshop in Rodgau. No waiting on a second company, no interface in the middle of the project.
- Services
WHAT WE TAKE ON IN CRANE CONSTRUCTION
From the runway to handover for operation – steelwork, installation and electrics from one team.
Hallen- & Laufkrane
Installing, aligning and commissioning single- and double-girder overhead cranes – documented up to 16 t, including at over 30 metres.
Kranbahn & Stahlbau
Manufacturing and installing runway girders, brackets and reinforcements, aligning and adjusting rails, setting end stops – from our own workshop.
Crane replacement in existing facilities
Dismantling the old system, bringing in the new one, checking the existing runway and reusing it where it is structurally sound – including adapting it to the new configuration.
Portal- & Schwenkkrane
Gantry cranes, pillar and wall-mounted jib cranes for workshops, halls and outdoor areas: foundation connection, assembly, alignment and test run.
Suspension cranes & special solutions
Suspended runways and cranes fixed to the roof structure, moving in through the open roof, solutions for halls with no conventional access.
Inspection, maintenance & repair
Supporting recurring inspections, working through findings, replacing wear parts, overhauling trolleys and travel gear – so the system stays in service.
- Industry comparison
EVERY INDUSTRY HAS ITS OWN RHYTHM
Installing a crane follows different rules from repairing something on the line. Knowing both means planning realistically.
The weekend window
Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.
The moving hall section
Nobody may work beneath the installation. So areas are cordoned off section by section – the exclusion zone moves along with the crane and the rest of the hall stays in operation.
The night between two peaks
Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.
- Process
WIE EINE KRANMONTAGE IM BESTAND GELINGT
- From the job diary
PROJEKTE AUS DEM KRANBAU
No marketing copy – documented jobs with real findings, all in our job diary.
WERKSTATTEINRICHTUNG · KERNTECHNISCHER BEREICH
Zwei Säulenschwenkkrane montiert
Säulenschwenkkrane, Werkbänke und Stromverteilung: komplette Werkstatteinrichtung unter den besonderen Regeln des kerntechnischen Bereichs.
Read the project
LAUFKRAN · RAUM ASCHAFFENBURG
16 t double-girder overhead crane installed
From the runway to the crane controls: bridge set, runway aligned, electrics connected and supported through to handover for operation.
Read the project
PORTALKRAN · BABENHAUSEN
Gantry crane assembled and handed over
Assembled using a combination of forklift and access platforms – aligned, connected and handed over for operation after a test run.
Read the project- Frequently asked questions
KRANBAU: DIREKT BEANTWORTET
Can you get a crane into a finished hall?
Yes, that is our speciality. We have installed a 16-tonne crane at over 30 metres and brought a suspension crane in through the open roof of an industrial plant. When no crane reaches in from outside, we work with our own lifting equipment along existing routes – section by section, instead of opening up the hall.
Does production have to stop for the crane installation?
Usually not entirely. Nobody may work beneath the installation area, so we cordon off section by section and let the exclusion zone move along with the work. The rest of the hall stays usable. Where a complete shutdown is unavoidable, we schedule it for a weekend or a shift break and prepare everything in advance.
Can you replace an old crane and keep using the existing runway?
Often yes – and it is usually the considerably cheaper solution. We check the runway’s load capacity and condition and tell you what can stay and what needs upgrading. In one case we removed a double-girder crane and installed two single-girder cranes on the existing runway.
Do you build the runway and steelwork yourselves?
Yes. We manufacture runway girders, brackets and reinforcements in our workshop in Rodgau and install them ourselves. That removes the interface with a second company – and with it the waiting that otherwise arises mid-project.
Are you tied to one crane manufacturer?
No, we install independently of manufacturer – from 2 t pillar jib cranes through double-girder overhead cranes to gantry cranes. You get the system that suits your hall and application, and a single contact who is also responsible for the runway and steelwork.
Do you handle inspection, maintenance and repair as well?
We support the recurring inspections, work through findings and carry out repairs: trolleys and travel gear, wear parts, rails and end stops. The formal inspection itself is done by the appointed inspector – we make sure the system passes it.
- Other service areas
ZU HAUSE IN MEHREREN BRANCHEN
Data centres
The operation with no off switch
Lifting, rigging and installation of heavy equipment – in new builds and in live data centres alike.
View service area
Logistics & intralogistics
The night between two peaks
Loading and conveying systems, statutory inspection repairs, series rollouts across many sites.
View service area
Airport & security areas
The operation that never closes
Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support.
View service area
Energy & emergency power
The window that must not exist
Standby power units up to 3 MW, generator servicing, exhaust and silencer systems.
View service area
Food & beverage
Between two cleaning cycles
Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations.
View service area
crane construction
The moving hall section
Overhead, gantry and jib cranes including runways – including replacements on an existing runway.
You are here
business equipment
The space that has to be cleared
Racking and storage systems, workshop bays, washing plants – installed and dismantled.
View service area
Automotive & Mechanical Engineering
The weekend window
Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line.
View service area
Steel structures & access platforms
The hot work permit
Platforms, stairs, custom structures – welded where the plant stands.
View service areaWe work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.
Send an enquirySTEHT EINE KRANMONTAGE AN?
Tell us briefly what it is about – we will come back with a realistic assessment.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt