TELL US WHAT YOUR PROJECT NEEDS

The fastest way is a message: e-mail or WhatsApp reach us even when nobody can pick up the phone. Replies in English – your contact: Tobias Schott, Managing Director.

24/7

on site, around the clock

DE · EN

Project language and documentation

9 am – 3 pm

Office hours, Monday to Friday (CET)

A MESSAGE ALWAYS GETS THROUGH – A CALL NOT ALWAYS

We try to answer the phone. But when our hands are in the machine, a lift is under way or we are working inside a restricted area, that is simply not possible – and you are left holding the line instead of getting an answer.

That is why e-mail and WhatsApp are the faster route. Describe your project once; we get back to you as soon as the work allows – with someone who can actually answer your question. Our office is staffed Monday to Friday from 9 am to 3 pm (CET); on the mobile you will often reach us earlier and later, because our crews are on site long before office hours.

What most enquiries from international general contractors are about: lifting & rigging, generators and transformers, white space installation, maintenance and 24/7 service or commissioning support. The overview is on our data center services page.

Consultation and a first assessment are free of charge. And if we are not the right partner for your case, we will tell you openly – and usually who could be.

I still work on site myself and personally look after my clients' projects. More than 20 years across a wide range of industries mean I know exactly what I am talking about. That is why you get a first proposed solution from us quickly – not an answer that has to take a detour through a sales department.

Tobias SchottManaging Director, Omega Mounting GmbH

#gettingitdone

Tobias Schott, Managing Director of Omega Mounting GmbH, in a work shirt in front of a mobile scaffold tower on site

Tobias Schott, Managing Director – usually on site himself.

Three ways to reach us

REQUEST A CALL-BACK

The more specific your details, the more reliable our assessment. Photos of the equipment or the installation situation help us most.

WHAT HAPPENS AFTER YOUR ENQUIRY

01RECEIPTYour message lands directly with us – not in a call centre. We review it the same working day.
02RESPONSEYou hear back from someone who can assess the equipment, and we clarify the points that determine the sequence of work.
03SITE VISITWhere it makes sense, we come to site. Photos do not replace a walk-down – and it costs you nothing.
04PROPOSALMethod, team, equipment and dates in writing – including the points still open, instead of a number without a basis.

WHERE TO FIND US

Our base with workshop and warehouse is in Rodgau, around 20 minutes south-east of Frankfurt – close to the Rhine-Main data center campuses.

Address

Omega Mounting GmbH
Hügelstraße 5
63110 Rodgau

Workshop and warehouse at the same location.

Contact

Phone: +49 6106 239 25 88

Mobile & WhatsApp: +49 172 669 38 57

E-Mail: anfrage@omegamounting.de

Hours

Office: Mon–Fri 9 am – 3 pm CET

Site crews: on site around the clock – early starts, late finishes, night and weekend windows.

Sie sehen gerade einen Platzhalterinhalt von Google Maps. Um auf den eigentlichen Inhalt zuzugreifen, klicken Sie auf die Schaltfläche unten. Bitte beachten Sie, dass dabei Daten an Drittanbieter weitergegeben werden.

Mehr Informationen

JUST SEND US A MESSAGE

A short message is enough – we get back to you with a reliable assessment, in English. You will receive an automatic confirmation in English; a personal reply follows the same working day.

100 % non-binding & free of charge · Office Mon–Fri 9 am – 3 pm CET · Crews on site around the clock

We are happy to help – even when it is not yet clear what the final solution should look like. The more we know about your task, the more reliable our answer.

What helps us most
  • What needs to be done – in your own words is perfectly fine
  • Photos or drawings of the situation on site
  • Location, access and the intended time window
  • Specifics such as live operation, safety requirements or access rules

Your documents stay with us. Everything you send us is treated in strict confidence and never passed on to third parties. If your project requires a non-disclosure agreement, that goes without saying for us – simply send it along with your enquiry.

Tobias Schott of Omega Mounting documenting an installation job on a laptop – with helmet, safety glasses and hi-vis clothing in the technical corridor of a data center
If it is urgent: straight from the site.