Pneumatic cylinder: single- or double-acting and what that means

By Tobias Schott  · 5-minute read · Updated November 2026

A pneumatic cylinder converts compressed air into straight-line motion – and whether it is single- or double-acting decides how it moves, how it holds and what happens if pressure fails.

You encounter pneumatic cylinders on conveyor systems as stoppers and lifting units, on sorting systems as switch drives, in fixtures as clamps and on doors as locks. The cylinder bears piston diameter and stroke, the catalogue terms such as standard cylinder, end-position cushioning and cylinder switch.

This article explains how a pneumatic cylinder is built, which designs exist and what makes it wear. How the valves that control it work is explained in our article on Directional valves: what 3/2, 5/2 and 5/3 mean.

What is a pneumatic cylinder?

A pneumatic cylinder is an actuator in which compressed air moves a piston in a barrel and generates linear force and motion via the piston rod. The force results from air pressure times piston area. A larger piston therefore pushes harder at the same pressure.

The cylinder consists of the cylinder barrel, piston with seal, piston rod with guide and wiper, and two end caps with the air ports. In German it is called Pneumatikzylinder, the double-acting version doppeltwirkender Zylinder.

Key facts

Single-acting, double-acting, rodless: the designs

Explanatory graphic: pneumatic cylinder – single-acting, double-acting and rodless designs compared
One port or two, with rod or without: the design decides how the cylinder moves and where it fits. Graphic: Omega Mounting

The design says how many air ports the cylinder has and how it retracts.

Technical drawing: two pneumatic cylinders in section – single-acting with one port and a spring that returns the piston, double-acting with two ports, the air moves in both directions
Single-acting: air extends, the spring returns. Double-acting: one port per side, force in both directions. Graphic: Omega Mounting

Single-acting. Compressed air moves the piston in one direction only, a spring returns it. It needs only one port and a simple valve. If the compressed air fails, the spring moves the cylinder to its home position. The spring costs force, however, and limits the stroke.

Double-acting. Compressed air moves the piston in both directions, with one port per side. This is the most common design because it has force in both directions and allows long strokes. When retracting the force is slightly lower, because the piston rod takes away area on this side.

Rodless. The piston drives a carriage on the outside of the barrel. The cylinder is only as long as its stroke plus end pieces and is suitable for long travel in confined spaces.

TypePrincipleStrengthLimitTypical use
Single-acting.Air out, spring back.Simple, defined home position if pressure fails.Short stroke, spring force is lost.Clamping, ejecting, small stoppers.
Double-acting.Air out and back.Force in both directions, long stroke.No safe position without additional measures if pressure fails.Lifting units, switches, gates.
Rodless.Piston drives an external carriage.Long stroke, short overall length.More sensitive to side loads and dirt.Linear axes, door drives, handling.
Compact and short-stroke cylinders.Double- or single-acting, very short.Little installation space.Short stroke.Stoppers, clamps.
When retracting, the air only presses on the annular area – that is why the force is slightly lower than when extending. Graphic: Omega Mounting

End-position cushioning and cylinder switches

End-position cushioning brakes the piston shortly before the stop so that it does not hit the end cap hard – it protects cylinder, load and system.

Technical drawing: pneumatic cylinder in section shortly before the end position – a cushioning spigot closes the outlet, the residual air escapes via a throttle screw, a magnet in the piston actuates the cylinder switch in the slot on the barrel
Cushioning brakes the piston before the end cap, the cylinder switch reports the end position – both must suit the system. Graphic: Omega Mounting

With elastic cushioning, a rubber buffer catches the piston. With pneumatic cushioning, a cushioning spigot closes the air outlet shortly before the end. The residual air then only escapes via a small throttle screw, and the piston runs in softly. This screw must suit the load and speed: too far open means a hard stop, too far closed means the piston bounces back or reaches the end position too slowly.

Cylinder switches tell the control whether a cylinder is extended or retracted. There is a magnet in the piston and a sensor in a slot on the outside of the barrel. If the switch is in the wrong position, it reports an end position too early or not at all – a common reason for faults that look like a defective cylinder.

Hydraulic cylinders and piping on the underside of the test rig
A hydraulic cylinder works with oil and high pressure – for large forces and precise holding where the pneumatic cylinder reaches its limits.

Pneumatics or hydraulics: what is the difference?

Pneumatic cylinders are fast, clean and simple, hydraulic cylinders strong and precise – the difference lies in the pressure medium.

Technical drawing: two upright cylinders with load – with the pneumatic cylinder the air is compressed and the load sinks, with the hydraulic cylinder the oil hardly yields and the load stays in position
Air springs, oil holds: a pneumatic cylinder holds an intermediate position under load only poorly, a hydraulic cylinder stays put. Graphic: Omega Mounting

Compressed air is compressible. A pneumatic cylinder therefore springs back a little and holds an intermediate position under load only poorly. In return it is fast, light and tolerates overload without damage. The operating pressure in industry is typically a few bar.

Hydraulic oil is practically incompressible. A hydraulic cylinder holds its position even under high load and works with a multiple of the pressure. It generates very large forces in a small space, but needs a power unit, tight lines and clean oil.

Maintenance and typical faults

Pneumatic cylinders run for a long time if the air and installation are right. The most common faults have recurring causes:

Before any work on a cylinder, the system is depressurised and secured. Even a switched-off cylinder can move as long as there is still air in the system. When replacing it, the new cylinder goes onto the machine in the same mounting position and with the same connections – otherwise stroke and switching points no longer match.

What we pay attention to

We replace cylinders according to their type designation and check beforehand whether the cylinder really is to blame.

Where we use it

We encounter cylinders in roller conveyors, sorting systems, fixtures and test stands. During the conversion of a servo-hydraulic test rig we adapted the hydraulic lines to the cylinders to the new configuration and welded a surrounding oil pan tight. We replace, adjust and cushion pneumatic cylinders during the maintenance of conveyor systems. Both are part of our Maintenance and servicing.

More technology explained

Technology explained

the valves that control the cylinder.

Technology explained

the compressed air quality that every cylinder depends on.

Guide

the guide to cylinders and valves in the accumulation section.

Do you have questions about how this works on your site?

Do you have questions about how this works on your site – for example, why a cylinder on your conveyor system moves too slowly? We look for the cause, replace and adjust. Request a callback – we will get back to you.

Free, no-obligation callback

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The Technology explained articles cover the equipment and techniques his team uses every day: what counts on site is in them – what only appears in the brochure is not.

EnglishEnglish