- Service area
OPERATIONAL EQUIPMENT: WHAT GOES INTO THE HALL
Racking, workstations, test bays, washing plants: in industrial operations we install what belongs in the hall – and take it out again when it has to go.
years of industrial installation
cantilever racks installed
Installation and removal from one source
fitters on the job
- What it is about
ONE COMPANY FOR EVERYTHING THAT STANDS IN THE HALL
Operational equipment is rarely a single trade. A new warehouse needs racking, impact protection and lighting. A new workshop needs workstations, cabinets, compressed air and power. And whoever clears a hall needs someone who also takes things out again – cleanly and without damaging the building.
That is exactly what we do: in industrial companies we install and remove whatever goes into the hall. Mechanics, metalwork and electrics come from the same team, so you are not coordinating three companies waiting on each other.
And where something is damaged, we look at repair first. A racking frame that has been hit does not automatically mean a whole new racking system.
- Why us
FOUR REASONS WHY COMPANIES CALL US IN
Everything that goes into the hall
From racking through test bays to washing plants: we install and remove what an industrial operation needs in its hall – one point of contact instead of one company per trade.
Racking & storage technology, complete
Kragarm-, Paletten- und Hochregale bis rund acht Meter montieren, umbauen und erweitern – auch in sensiblen Bereichen und neben dem laufenden Lagerbetrieb. Wie eine Regalanlage im laufenden Betrieb umgebaut wird – Umlagerungskonzept, Fachlasten, Prüfung nach dem Umbau –, steht in unserem Ratgeber Regalanlage im laufenden Betrieb umbauen.
Repair instead of replace
A frame that has been hit is no reason for a new system. We repair racking, replace individual components and document the work for the inspection.
Workshop & workstations
Assembly and test bays, drawer cabinets, workbenches, lighting: set up, connected and handed over ready for use – not just delivered.
- Services
WHAT WE TAKE ON IN OPERATIONAL EQUIPMENT
From a single cabinet to a complete hall fit-out – installed, converted, repaired and removed.
Racking & storage technology
Installing, extending and relocating cantilever, pallet and high-bay racking. Including alignment, anchoring and documentation for the recurring inspection.
Racking repair & impact protection
Repairing or replacing damaged frames and beams, adding impact and collision protection – so the same damage does not come back in six months.
Workshop & workstations
Building assembly, test and final assembly bays, installing drawer cabinets and workbenches, connecting lighting and compressed air – handed over ready to use.
Washing & cleaning technology
Installing and connecting parts washing systems and wall-mounted pressure washer stations: pipework bent on site, water and power connected, commissioned.
Room modules & containers
Bürocontainer und Raummodule aufstellen, verbinden und nutzbar machen – bei Bedarf mit Sanitär, Strom und Klimatechnik. Und wieder abbauen, wenn sie weichen. Mehr dazu auf der Seite Containeranlagen aufstellen und anschließen.
Dismantling & clearance
Clearing halls and areas: dismantling, sorting and removing plant and equipment properly – without leaving damage to the building.
- Industry comparison
EVERY INDUSTRY HAS ITS OWN RHYTHM
A hall fit-out follows different rules than a repair on the line. Knowing both makes for realistic planning.
The weekend window
Production on two or three shifts, downtime only at weekends. The window is fixed – what fits into it is decided in advance.
The space that has to be cleared
Here the bottleneck is not time but space. We work area by area: clear, install, move on – so operations are never left completely without their floor space.
The night between two peaks
Sorting and loading equipment runs at its limit seasonally. Repairs happen at night, at weekends or alongside operations – and before the peak season, not in the middle of it.
- Process
HOW A HALL FIT-OUT SUCCEEDS
- From the job diary
PROJECTS FROM OPERATIONAL EQUIPMENT
No marketing copy – documented jobs with real findings, all in our job diary.
REPAIR · FULDA AREA
Racking system repaired instead of replaced
Impact damage to a racking frame: components repaired and replaced instead of exchanging the entire system – at a fraction of the cost.
Read the project
INSTALLATION · VEHICLE WORKSHOP KASSEL
Parts washing system installed and connected
Positioned, pipework bent to fit on site, water and power connected and commissioned – handed over ready for use.
Read the project
TEST BAY · PRODUCTION
Battery test station built
From the frame to the services connection: test bay built, aligned and handed over for series production.
Read the project- Frequently asked questions
OPERATIONAL EQUIPMENT: ANSWERED DIRECTLY
Does a damaged racking system have to be replaced completely?
In most cases, no. A frame that has been hit or a deformed beam can be repaired or replaced as a single component – considerably cheaper than a new system and available faster. We assess the damage, carry out the repair and document it so the recurring inspection can build on it. Only where the load capacity cannot be restored do we recommend replacement.
Can you work during live warehouse operations?
Yes, in that case we work area by area. One section is cleared and cordoned off, we convert or install there, then the working area moves on. That keeps the rest of the warehouse usable. How large the sections can be depends on your capacity to relocate stock – we clarify that during the site survey.
Do you also dismantle and clear halls?
Yes, that is explicitly part of it. We dismantle racking, equipment and plant properly, sort by recycling and disposal and hand over the area without damage to the building. In site relocations in particular this is often the part nobody else feels responsible for.
Do you also handle water, power and compressed air connections?
Within the usual scope, yes. We connect parts washing systems and pressure washer stations, bend pipework to fit on site, connect it and commission it. Mechanics and electrics come from the same team. The building service connection and the formal acceptance are handled by your specialist contractor or inspector.
Do you also fit out complete workshops?
Yes. Assembly and test bays, drawer cabinets, workbenches, lighting and services connections – we do not just drop the equipment off, we install it, align it and hand it over ready for use. On request including the removal of the old equipment.
Which regions do you operate in?
We are based in Rodgau near Frankfurt, with a focus on the Rhine-Main region. For larger projects we travel throughout Germany – including the Fulda area, Mainz and Kassel.
- Other service areas
AT HOME IN SEVERAL INDUSTRIES
Data centers
The operation with no off switch
Lifting, rigging and installation of heavy equipment – in new builds and in live data centers alike.
View service area
Logistics & intralogistics
The night between two peaks
Loading and conveying systems, statutory inspection repairs, series rollouts across many sites.
View service area
Airport & security areas
The operation that never closes
Fitters with aviation security clearance, baggage and cargo handling systems, 24/6 sorter support.
View service area
Energy & standby power
The window that must not exist
Standby power units up to 3 MW, generator servicing, exhaust and silencer systems.
View service area
Food & beverage
Between two cleaning cycles
Bakery and food processing machinery, overhead conveyors in hygiene areas, machine relocations.
View service area
Crane construction
The moving hall section
Overhead, gantry and jib cranes including runways – including replacements on an existing runway.
View service area
Workshop equipment
The space that has to be cleared
Racking and storage systems, workshop bays, washing plants – installed and dismantled.
You are here
Automotive & Mechanical Engineering
The weekend window
Keeping to shutdown windows, overhead conveyors, plant conversions in step with the line.
View service area
Steel structures & access platforms
The hot work permit
Platforms, stairs, custom structures – welded where the plant stands.
View service areaWe work outside these nine areas too. They show our team’s core subjects, cover a wide range and make clear what is possible. If your business or your plant does not appear here, simply get in touch – we find a solution for everyone.
Send an enquiryDOES A HALL NEED FITTING OUT OR CLEARING?
Tell us briefly what it is about – we will come back to you with a realistic assessment of scope, sequence and timeframe.
100% free of charge and without obligation · Omega Mounting GmbH, Rodgau near Frankfurt