Ultrasonic leak detection: hearing compressed air leaks and bearings

By Tobias Schott  · 5-minute read · Updated November 2026

A compressed air leak usually hisses more quietly than the hall around it – but it whistles in the ultrasonic range, and a detector makes exactly that whistle audible and locatable.

You come across ultrasonic leak detection as a leak survey by the compressor service provider, as an item in an energy audit, or as red tags hanging on couplings and hoses after a walk-round. The same instrument also listens to bearings, valves and condensate drains.

This article explains how the method works, what it finds and where its limits are. How to maintain the compressor station and the compressed air network as a whole is covered in the guide Maintaining the compressor station and compressed air network.

What is ultrasonic leak detection?

Ultrasonic leak detection means locating leaks in pressure and vacuum systems from the ultrasound produced by gas escaping or entering. When air flows through a narrow gap, the flow becomes turbulent. This produces a broadband noise that extends far beyond the human hearing limit of around 20 kilohertz.

The detector picks up this ultrasound with a microphone, typically around 40 kilohertz, and converts it into an audible tone in the headphones. Because ultrasound has a short wavelength, it travels in a highly directional way. That is why a leak can be located to within a few centimetres even during noisy operation. In German the method is called “Ultraschall-Leckageortung”; the instrument is an ultrasonic detector.

Key facts

Why small leaks matter

A compressed air leak costs energy for as long as the network is under pressure – including breaks, nights and weekends, when nobody needs compressed air.

Technical drawing: compressed air network with compressor, ring main and three consumers, air escapes at several fittings and outlets, the compressor runs at night for the leaks
Many small leaks, one compressor: the network is under pressure at night and at weekends too, and every leak keeps blowing. Graphic: Omega Mounting

Compressed air is an expensive form of energy to produce: the compressor turns most of its drive energy into heat, and only part of it arrives at the machine as usable compressed air. Every leak makes the compressor run longer or start more often. If the pressure at the consumers drops, the network pressure is often raised – and at higher pressure every leak loses even more air. On top of that, pneumatic actuators switch more slowly or unreliably when the pressure is too low.

Individual leaks are hardly audible during operation. Only the sum of many small leaks makes the difference – and that is exactly what the ultrasonic detector finds.

What the ultrasonic detector finds – and what it means

Explainer graphic: ultrasonic leak detection – compressed air leak, bearing, lubrication condition and condensate drain with sound, meaning and next step
The detector makes audible what is lost in the factory noise – the real work starts with the list afterwards. Graphic: Omega Mounting

The instrument mainly finds three things: escaping gas, friction in bearings, and leakage through components that should be closed.

Technical drawing: leak at a fitting in a compressed air line, an ultrasonic device with focusing tube and headphones, below it the level, which is highest at the leak
The device makes ultrasound audible: with the focusing tube you follow the hiss until the level is highest at the leak. Graphic: Omega Mounting
ApplicationWhat you hearWhat it meansNext step
Compressed air leakSteady hiss that gets louder towards the leakCompressed air escapes unused and the compressor works to replace itTag it, add it to the leak list, seal it or replace the part
Vacuum and technical gasesHiss at the point where air enters or gas escapesThe system loses pressure or draws in false airRepair the seal, fitting or flange
Rolling bearing in operationSteady, quiet hiss in normal conditionCrackling, clicking or a clearly higher level indicate damage or lack of lubricationConfirm with vibration and temperature, inspect the bearing
RegreasingThe level drops as soon as there is enough grease in the bearingMore grease achieves nothing and can over-grease the bearingAdd grease only until the level stops falling
Condensate drains and valvesContinuous hiss instead of short switching soundsThe component does not close and blows throughRepair or replace the drain or valve

On electrical installations the devices also pick up partial discharges and leakage currents. That belongs in the hands of a qualified electrician, not in a mechanical inspection round – on machines and systems our own electricians take care of it.

Schematic diagram: ultrasound level of a rolling bearing over the quantity of grease applied – the level falls until the bearing has enough grease, then stops falling, and further grease leads to over-greasing
Greasing by ear: once the level stops falling, there is enough grease in the bearing – more grease over-greases it. Graphic: Omega Mounting

Where the method reaches its limits

Ultrasound is a locating method, not an instrument for measuring quantities – and it needs a clear line of sight to the leak.

Technical drawing: on the left a leak behind cladding whose sound does not reach the device; on the right a quiet leak next to a loud blow-off nozzle that masks the noise
Hidden points and loud noise sources: ultrasound needs a clear line and quiet – seal the largest leak first. Graphic: Omega Mounting

What we pay attention to

A leak survey is only finished when the leaks are sealed – that is why we carry out the repairs after locating them.

Motor on the mounting stand after the overhaul
After the overhaul, motor and bearings run smoothly again – exactly this condition is the baseline for any later ultrasonic or vibration measurement.

Where we use it

Leaking lines, valves that blow through and bearings that have become noisy turn up on almost every maintenance job in a live plant. Bearings are the components whose condition shows early in the sound. Take the fan bearing replacement in a paint shop near Offenbach – the fans ran practically non-stop, and their bearings are among the most heavily stressed wear parts of the plant. We removed motor and impeller, replaced the bearings and overhauled the unit. We fix leaks in compressed air and hydraulic lines as part of our Maintenance and servicing.

More technology explained

Technology explained

the method that confirms bearing damage you have heard.

Do you have questions about how this works on your site?

Questions about how this works in your plant – for example, who seals the leaks from the last survey? We work through your leak list, repair lines, valves and bearings and test again. Request a callback – we will get back to you.

Free, no-obligation callback

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The Technology explained articles cover the equipment and techniques his team uses every day: what counts on site is in them – what only appears in the brochure is not.

EnglishEnglish