Night shift on a construction site in the Rhine-Main region: tower cranes and mobile cranes lifting components for a new data center

Industrial installation, lift & shift and rigging near Frankfurt

Omega Mounting installs, moves, maintains and dismantles heavy plant – from data center equipment to complete production lines. Our own fitters, lifting equipment and workshop are based in Rodgau near Frankfurt. We take the jobs where standard solutions no longer work: a line at a standstill, a conversion against the clock, a machine that will not fit through the door.

Appointed person (AP)
Lifting operations under our own responsibility
2012
founded in Rodgau near Frankfurt
Nights
and weekends on the job – by arrangement
162
online reviews

Six services that work together

Most of our jobs involve several of them – so you deal with one contractor instead of four companies around one table.

The crew that shows up when others run out of answers

Omega Mounting is an industrial installation company based in Rodgau near Frankfurt – with our own fitters, our own equipment and our own workshop. We install, maintain, relocate and dismantle what others consider too heavy, too tight or too tightly scheduled.

Our clients come from data centers, logistics, aviation, energy, food production and the automotive industry. What they have in common: downtime costs them money, and a deadline is a deadline.

You will not be put through a sales loop here – you get a technical answer from someone who has done the work himself.

You are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More information
A look at what we do – filmed on our own sites.

What is going on at your site?

Why data centers are our toughest proving ground

What is demanded there is the benchmark we apply to every project we take on.

Data centers are the toughest test in our trade. The date is fixed months in advance, the main contractor (GC) checks every certificate, and in the white space a millimetre counts as much as the signature on the inspection report.

We work there every day, often on several sites at once in the Frankfurt area. We started out as riggers for a crane company. Today we plan lifting operations ourselves, take responsibility for them and are on the approved subcontractor lists of major GCs.

What works in a data center – safety, documentation, on-time delivery – is what we bring to your plant as well.

Our work in the data center

Appointed person (AP)

Our appointed person (AP) plans each lift – load calculation, lift plan, permission to lift. A lift supervisor appointed by the AP runs it on site.

Commissioning

We know the commissioning levels L1 to L5 – plus L0 and L6 where operators use them – and supply the documentation in the required format.

Our own EHS standard

A bilingual set of rules based on DGUV, BetrSichV and TRBS – not just signed off, but written by us.

Project language English

On international sites, coordinating and documenting in English is part of our everyday work.

CRAH units, load banks, generators, transformers, PDCs, busbars and complete fan walls – moved in, set up, aligned and handed over.

We support your plant across its entire lifecycle

Von der Anlieferung über Aufbau, Anschluss und Instandhaltung bis zur Demontage und Verlagerung: Sieben Phasen, für die Sie bei uns nur einen Ansprechpartner brauchen – deutschlandweit und im europäischen Ausland. Sind Sie Hersteller oder Anlagenbauer und soll Ihre Anlage beim Endkunden aufgebaut werden, hilft Ihnen unsere Seite Plant installation at your customer’s site covers this.

Machine life cycle · installation · service · relocation Seven phases,
one partner
From delivery to relocation – one contractor for every phase.
PHASE 01

Delivery & logistics

  • Transport supervision and unloading
  • Site and floor-space logistics
  • Incoming goods inspection
PHASE 02

Move-in & rigging

  • Heavy loads, cranes and lifting equipment
  • Installation routes through doors and halls
  • Positioning at the installation point
PHASE 03

Foundation & alignment

  • Anchoring, shimming and dowelling
  • Levelling and surveying
  • Measurement report and documentation
PHASE 04

Assembly & installation

  • Mechanical assembly of the modules
  • Pipework, pneumatics, hydraulics
  • Safety guards and panelling
PHASE 05

Connection & commissioning

  • Electrical, utility and compressed-air connection
  • Trial run, setting, fine adjustment
  • Handover to production
PHASE 06

Operation & maintenance

  • Scheduled maintenance and breakdown service
  • Repair, retrofit, conversions
  • On-site staffing
PHASE 07

Dismantling & relocation

  • Decommissioning and disconnection
  • Dismantling, labelling, packing
  • Transport and relocation to the new site

What we have been working on

No marketing copy – documented jobs with photos, figures and what went wrong.

Because you need more than fitters

One contact who knows the work

You are not talking to a sales team but to someone who works on site. That is why you get a sound first assessment quickly.

Our own people, our own equipment

Directly employed fitters, our own vehicles and lifting equipment, our own workshop with machine tools. We do not depend on someone else answering the phone on a Sunday.

All trades in one team

Mechanics, electrics, hydraulics, pneumatics, controls. You are not coordinating four companies that blame each other.

We work while your plant is down

At night, at weekends, on public holidays, during shutdowns. You set the time window and we work around it.

Evidence instead of promises

Appointed person for lifting operations, instructor and examiner qualifications, our own EHS standard, complete documentation. All of it verifiable.

Cause rather than symptom

We do not just hand over a list of findings. When we find a weak point, we tell you where it comes from – and fix it.

Questions main contractors and plant operators ask us

What does Omega Mounting do, and where are you based?

Omega Mounting is an industrial installation contractor based in Rodgau, near Frankfurt am Main. We install, move, maintain and dismantle heavy plant: lift and shift, rigging, machinery relocation, custom fabrication and maintenance. Our directly employed fitters work with our own vehicles, lifting equipment and workshop. Most jobs are in the Rhine-Main region, but we also work elsewhere in Germany and in other European countries.

Do you work as a subcontractor to international main contractors on data center sites in Frankfurt?

Yes. Subcontracting to main contractors (GCs) on data center sites is a core part of our work, and we have worked in 26 data centers so far. We move in and set CRAH units, generators, transformers, PDCs and busbars, plan the lifts and supply the documentation in the format the site requires. On international sites we coordinate and document in English.

Can you provide RAMS, lift plans and an appointed person for lifting operations in English?

Yes. Our appointed person (AP) plans each lift, including the load calculation and the written lift plan, and a lift supervisor appointed by the AP runs it on site. We prepare risk assessments and method statements (RAMS) in English and work to our own bilingual EHS standard based on DGUV, BetrSichV and TRBS. English is our everyday project language on international sites.

How quickly can you mobilise a crew in the Frankfurt Rhine-Main region?

In the Rhine-Main region we are usually on site within a day; for a standby power fault, usually within a few hours. By phone we are available Monday to Friday, 9 am to 3 pm; a WhatsApp message always gets through. For planned work we need two to three weeks of lead time for procurement and prefabrication. If a job needs more people, we can add around 20 additional fitters from established partner crews within a few days.

Do you also relocate and dismantle machinery outside Germany?

Yes. We dismantle, transport, reassemble and recommission machinery across national borders as well as within Germany; past jobs have taken us to Italy, France and Luxembourg. The method is the same as at home: every part is labelled, photographed and packed, and we rebuild the plant at the new site until it runs again. English is our project language abroad.

Tell us about your project

A short phone call is enough for a first assessment. The more we know in advance, the more specific it gets – feel free to send photos or drawings straight away.

Free, no-obligation callback · Omega Mounting GmbH, Rodgau near Frankfurt

Tobias Schott of Omega Mounting as lifting supervisor during night work on an industrial site, with tower cranes and a container on the hook in the background
Night shift in the Rhine-Main region: lifting operations under two tower cranes, container on the hook.
EnglishEnglish