On 28 July 2023 we acted as crane supervisor for a crane hire company, lifting several chillers by mobile crane onto data center roofs in Frankfurt. Data centers need a lot of cooling – even to serve the page you are reading now.
Chiller lift onto data center roofs in Frankfurt
Project diary
We acted as crane supervisor for a crane hire company on this lift.
Data centers need a lot of cooling – even to serve the page you are reading now.
To cool data centers at the Frankfurt internet hub, several chillers were lifted onto the roof by mobile crane and then installed.
You are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More informationYou are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More informationYou are currently viewing placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More informationOverview
- 28.07.2023
- Crane supervisor
- Data centers in Frankfurt
- Lift with a mobile crane
Coordinating a mobile crane lift onto a roof needs the crew’s full attention from the first to the last chiller.
The job was one of our first in data centers. Since then we have worked in 26 data centers, and today we plan lifts like this one ourselves as appointed person for lifting operations.




We keep your production running
Our service areas
Follow us on social media
Related guides for this project
Maintenance & Servicing
Maintenance & Servicing
About the author
Tobias Schott
Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance
A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The project diary shows jobs his team has planned and carried out – without client names, but with everything there is to learn from them.
Frequently asked questions
Usually by mobile crane. Weight, radius and crane standing area decide: the crane is chosen for the radius it needs from the permitted standing area. A lift plan fixes crane position, lifting accessories, exclusion zone and sequence. If the crane stands on a public road, you also need a road-space permit and a traffic management order from the local authority.
The crane supervisor – in UK terms the lift supervisor – runs the lift on site: briefs the crew, checks the slinging and the exclusion zone, and is the single voice to the crane operator. The lift itself is planned beforehand in the lift plan by the appointed person for lifting operations. On this job we supervised the lift on behalf of a crane hire company.