We set up a container facility for a plant security service in Frankfurt. The containers were delivered on trucks and placed with a loader crane.
To this end, we had prepared a levelled base from concrete slabs and steel plates in advance. This ensured that the interconnected containers stood straight and did not rock.
Installation of a Container Facility in Frankfurt
work diary
This time our job was to set up a container facility in Frankfurt for a plant security service.
The containers were delivered on trucks and placed using a loader crane.
To this end, we had prepared a levelled base from concrete slabs and steel plates in advance. This ensured that the interconnected containers stood straight and did not rock.
As the containers also serve as accommodation for the 24-hour duty staff, toilets and showers were installed in addition. For this, the fresh-water supply had to be installed with frost protection, and the waste-water pipes also had to be laid.
Trenches were dug for this purpose and the pipes were protected with trace heating and insulation. The waste-water pipes were laid in a sand bed specifically to protect them.
Our team also installed two air-conditioning systems so that the containers do not get too hot during the summer months and can also be heated in winter.
More about our work in the city, access routes and service areas: Industrial installation in Frankfurt.




We keep your production running
Our service areas
Follow us on social media
Related guides for this project
About the author
Tobias Schott
Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance
A trained mechatronics technician, at home in maintenance, servicing and industrial installation since 2004 – first alongside his father, and since 2012 with Omega Mounting: from the overhead conveyor in Frankfurt to the crane system in a new-build hall. As appointed person for lifting operations, he plans and leads lifting operations in data centers and on industrial sites in the Rhine-Main region, is an instructor and examiner for cranes, aerial work platforms and telehandlers, and a safety officer. On assignments abroad he is known as the "German Troubleshooter" – the one you call when things get stuck on site. He did not learn what quality means from a manual, but from his father: Made in Germany as a standard for his own work, not as a label. That is why quality comes first at Omega Mounting – before speed and before price. The project diary shows the jobs his team has planned and carried out – without customer names, but with everything that can be learned from them.