Shaft coupling: rigid, flexible, jaw – and why alignment matters

By Tobias Schott  · 5-minute read · Updated November 2026

A shaft coupling connects two shafts and transmits the torque from the motor to the machine – some compensate small alignment errors, but none makes up for poor alignment.

You encounter shaft couplings between motor and pump, motor and fan, motor and gearbox, motor and generator. They usually sit under a guard and only attract attention when a spider crumbles or a bearing fails again and again. The catalogue contains names such as jaw coupling, pin coupling or disc coupling.

This article explains which types of coupling exist, what misalignment they compensate and why alignment is still decisive. How to maintain drives as a whole is described in the guide Maintaining drives, gearboxes and pumps.

What is a shaft coupling?

A shaft coupling is a machine element that connects two shaft ends in a rotationally fixed manner and transmits the torque from the input to the output shaft. It usually consists of two hubs, which are pushed onto the shafts and secured with a feather key or clamping, and a connecting element in between.

Depending on the design, this element is rigid, made of flexible plastic or of flexible metal parts. This determines whether the coupling dampens shocks and permits small alignment errors. In German it is called „Wellenkupplung“, the jaw coupling „Klauenkupplung“.

Key facts

Rigid, flexible, torsionally rigid: the types of coupling

Couplings differ in whether they give way – in the direction of rotation, across the shaft or not at all.

Technical drawing: three shaft couplings from the side – a bolted flange coupling, a jaw coupling with flexible spider and a disc coupling with flexible disc pack
Rigid compensates nothing, torsionally flexible dampens, torsionally rigid compensating transmits without twisting and compensates misalignment via flexible parts. Graphic: Omega Mounting

Rigid couplings. Sleeve and flange couplings connect the shafts as if they were a single shaft. They transmit large torques but compensate nothing. The shafts must be exactly aligned, otherwise they and their bearings are constantly bent.

Torsionally flexible couplings. Between the hubs sits an element made of plastic or rubber: the spider in the jaw coupling, rubber buffers in the pin coupling, a rubber tyre in the tyre coupling. They dampen torsional shocks and vibrations, protect motor and machine and permit small misalignment. The elastomer is a wear part.

Torsionally rigid, compensating couplings. Gear couplings, disc and bellows couplings transmit the torque without twisting but compensate misalignment via movable teeth or flexible metal parts. They are needed where speed or position must be transmitted precisely.

There are also overload and slip couplings that disconnect in the event of a blockage, and switchable couplings that engage and disengage drives.

Radial, axial, angular: the three types of misalignment

Explanatory graphic: shaft coupling – rigid, flexible and torsionally rigid compensating couplings compared with compensation, damping and use
Rigid only connects, flexible dampens, torsionally rigid compensating transmits precisely – but no coupling makes up for poor alignment. Graphic: Omega Mounting

Two shafts can fail to match each other in three ways – and each loads coupling and bearings differently.

Technical drawing: three pairs of shafts – offset in parallel with radial misalignment, with the wrong distance as axial misalignment and at an angle to each other as angular misalignment
Radial, axial, angular: two shafts can fail to match each other in three ways – each loads coupling and bearings differently. Graphic: Omega Mounting
Coupling groupExamplesCompensatesDampensTypical use
Rigid.Sleeve, flange coupling.Nothing.NoLong shaft lines, exactly aligned bearings.
Torsionally flexible.Jaw, pin, tyre coupling.Small radial, axial and angular misalignment.YesPumps, fans, conveyor drives.
Torsionally rigid compensating.Gear, disc, bellows coupling.Misalignment depending on design.No or hardly.Compressors, generators, positioning drives.

Every misalignment creates restoring forces. The coupling pushes the shafts back with every revolution, and these forces end up in the bearings of motor and machine. The consequences are heat at the coupling and bearings, vibration at once and twice the rotational frequency and premature bearing failure.

Technical drawing: motor and pump with misaligned shafts, the coupling in between, restoring forces act on the bearing points of motor and pump
The coupling pushes the shafts back with every revolution – heat, wear and vibration end up in the bearings. Align first, then replace. Graphic: Omega Mounting

How to recognise a worn coupling

A coupling usually announces its wear before it breaks – through debris, play, heat and noise.

Technical drawing: two spiders from the front – new with full teeth, worn with narrow, cracked teeth, debris below and play between the hubs
Debris under the guard, play between the hubs, cracks – a disintegrated spider is usually a symptom, not the cause. Graphic: Omega Mounting

A disintegrated spider is rarely the cause but the symptom. Anyone who only replaces the elastomer and does not realign will soon replace it again.

Fitting a coupling

The best coupling does not last long if it is fitted wrongly. These steps are part of it:

After a few operating hours a second look pays off: are the screws still tight, is the elastic spider undamaged, is the alignment still right when warm? Especially with machines that heat up a lot in operation, the position can shift.

What we pay attention to

We replace couplings according to type and size – and always realign afterwards.

Millimetre work as a team – despite heavy components, it comes down to centimetres
Heavy assembly, fine work: when reinstalling a generator, the alignment to the engine determines how smoothly the set will run later.

Where we use it

We release and connect couplings with every motor, pump and set replacement. During the generator maintenance on a standby power system the overhauled components came back the same way after the overhaul: lift in, bring in, assemble, align. In the plant room our mechanics reassembled the set, positioned the generator and connected it to the engine. Such work is part of our Maintenance and servicing.

More technology explained

Technology explained

how shafts are precisely aligned with each other.

Technology explained

how an alignment error shows up in the spectrum.

Guide

the guide when the fault lies in the foundation.

Do you have questions about how this works on your site?

Do you have questions about how this works on your site – for example, why a coupling spider on your pump keeps disintegrating? We replace, align and look for the cause. Request a callback – we will get back to you.

Free, no-obligation callback

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The Technology explained articles cover the equipment and techniques his team uses every day: what counts on site is in them – what only appears in the brochure is not.

EnglishEnglish