Hydraulic power pack: pump, valves, accumulator – what is inside the box

By Tobias Schott  · 5-minute read · Updated November 2026

A hydraulic power unit is the power plant of a hydraulic system: it draws oil from the tank, pressurises it and sends it to the cylinders – and in doing so it stores energy that has to be controlled during every maintenance job.

You encounter the hydraulic power unit on presses, lifting tables, dock levellers and vehicle restraints at the loading bay, on test benches and machine tools. From the outside it is often just a box with a motor, tank and a few valves. Inside, a circuit works in which every component has a clear task.

This article explains the design, the most important components and the hazards. How to maintain hydraulic systems, change oil and find leaks is described in the guide Hydraulic maintenance.

What is a hydraulic power unit?

A hydraulic power unit is a compact assembly of tank, motor, pump, valves and accessories that provides a pressurised oil flow for hydraulic drives. The cylinders or hydraulic motors that work with it are called consumers.

The principle is simple: the pump delivers oil, and only the resistance of the consumer builds up pressure. Because oil is hardly compressible, it transmits large forces precisely and holds a position even under load. In German the unit is called „Hydraulikaggregat“.

Key facts

The components and what they do

Explanatory graphic: hydraulic power unit – circuit from tank, pump, pressure relief valve, directional valve and consumer back via filter and cooler
One circuit in five stations: the oil comes from the tank, is delivered, limited, distributed, does its work – and flows back filtered and cooled. Graphic: Omega Mounting

The oil circuit has six stations, and each can be the cause of a fault.

Technical drawing: hydraulic power unit with tank, electric motor and pump on the lid, pressure relief valve on the valve block, directional valves, return filter and cooler in the return line
Tank, pump, pressure relief, directional valves, filter and cooler: each of the six stations can be the cause of a fault. Graphic: Omega Mounting
ComponentTaskTypical mistakeConsequence
Pump.Deliver oil.Wear, cavitation due to a dirty suction filter or oil that is too cold.Noisy running, less pressure, heat.
Pressure relief valve.Limit maximum pressure.Misadjusted or sticking.Too little force or overload.
Directional valve.Distribute oil.Spool sticking due to dirt.Cylinder does not move or moves wrongly.
Filters.Keep oil clean.Clogged, bypass valve open.Dirt in the whole system.
Cooler.Remove heat.Dirty, fan defective.Oil gets hot and ages quickly.
Accumulator.Buffer energy.Pre-charge pressure lost.Fluctuating pressure, pump switches often.
Technical drawing: pressure relief valve in section with spring, poppet and adjusting screw – closed below the set point, open at excessive pressure, the oil flows to the tank
If the pressure rises above the set value, it lifts the poppet and the oil flows back to the tank – and gets hot in the process. Graphic: Omega Mounting

The accumulator: stored energy

An accumulator stores oil under pressure and releases it quickly when needed – this way it buffers pressure peaks, supports the pump and keeps functions going during a power failure.

Technical drawing: three bladder accumulators in section – pre-charged with a large gas bladder, charged with a compressed bladder and oil below, without gas cushion completely filled with oil
The nitrogen cushion acts like a spring – once the pre-charge is gone, the accumulator buffers nothing. Accumulators are pressure equipment subject to inspection. Graphic: Omega Mounting

Inside, a bladder, a diaphragm or a piston separates the oil from a gas cushion of nitrogen. When oil is forced in, the gas is compressed and stores the energy. That is exactly what makes the accumulator dangerous: it holds the pressure even when motor and pump have long been switched off.

Accumulators are pressure equipment. Depending on pressure and volume, they must be inspected periodically under the German Ordinance on Industrial Safety and Health (BetrSichV), by a competent person or an approved inspection body. Which inspection applies to your accumulator is determined by the operator in the risk assessment – this is not legal advice, but a classification.

Why temperature and cleanliness decide the service life

Most failures on hydraulic power units start with oil that is too hot or contaminated – long before a component breaks.

Schematic drawing: cycle of losses, thinner oil, more leakage and more heat; next to it a narrow gap with particles scoring the surfaces
Long before a component breaks: heat thins the oil, particles grind in the narrow gaps of pump and valve. Graphic: Omega Mounting

Every power loss in pump, valves and lines turns into heat. If the cooler is dirty or the unit is undersized, the oil temperature rises. Hot oil becomes thinner, seals less well in pump and valves and ages faster. Seals harden, leakage increases, and with it the heat.

Dirt has an even more direct effect. Even fine particles grind in the narrow gaps of pumps and valves, water ages the oil and promotes corrosion. That is why clean work when opening the system, intact breather filters on the tank and regular checks of the filter indicator count more than any single repair. An oil analysis is the most reliable way to show whether the oil can keep running.

Installing and commissioning

A hydraulic power unit is not simply set down and connected. For it to run reliably, we pay attention to these points:

At the first start the pump’s direction of rotation is checked, then the pressure is raised step by step. Leaks, temperature and noise are watched. Our electricians handle the electrical connection up to the main switch; pressure settings follow the manufacturer’s specifications.

What we pay attention to

We only work on a hydraulic power unit when it is safely depressurised.

Freshly welded corner of the drip tray on the concrete foundation of the test rig
Wherever a hydraulic power unit and its lines work, a tight drip tray is part of it – oil must never escape uncontrolled.

Where we use it

We install and look after hydraulic power units at loading bays, test benches and machines. During the installation of vehicle restraint systems in a logistics centre near Leipzig 32 loading bays came with hydraulic power units, control desks and control cabinets. In the first project week eight people were deployed, then a team of three for the fine installation. During the conversion of a servo-hydraulic test rig we adapted the hydraulic lines and welded an oil tray tight. Both are part of our Maintenance and servicing.

More technology explained

Technology explained

the valves that distribute the oil.

Technology explained

how the condition of the hydraulic oil can be measured.

Do you need this machine together with a team on site?

Do you need a team that installs, connects and maintains hydraulic power units? We work depressurised, cleanly and as specified. Request a callback – we will get back to you.

Free, no-obligation callback

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The Technology explained articles cover the equipment and techniques his team uses every day: what counts on site is in them – what only appears in the brochure is not.