Weld testing: what the eye sees – and what only test methods find

By Tobias Schott  · 5-minute read · Updated November 2026

Cracked weld seam on the loading dock bracket – the UVV defect in detail
A cracked weld on a dock bracket – found during inspection before it fails.

Weld testing checks whether a weld is free of cracks, porosity and lack of fusion – first by eye, then with methods such as dye penetrant, magnetic particle or ultrasonic testing, which also reveal fine and internal defects.

A weld can look clean from outside and still not carry. A fine crack, a pore inside or a side wall that has not fused properly remain invisible – until the weld gives way under load. That is why load-bearing welds are tested: during manufacture, after repairs and during periodic inspections.

Here we explain which defects occur in welds and how to find them with visual testing, dye penetrant, magnetic particles and ultrasound.

What is weld testing?

Weld testing is the inspection of a weld for defects that impair its strength or tightness. Testing is usually non-destructive – the component remains undamaged. The methods have international abbreviations: VT for visual testing, PT for penetrant testing, MT for magnetic particle testing, UT for ultrasonic testing and RT for radiographic testing.

Which test is needed depends on the component, the load and the specification. For simple repairs, visual testing is often enough; for load-bearing and highly stressed welds, further methods are added.

There are also destructive tests: a specimen is bent, pulled or cut open. This is done when qualifying welders and welding procedures on test pieces, not on the finished component. For plants in operation, the non-destructive methods are what matters.

Key facts

Which defects are there?

Technical drawing of a V weld in cross-section with crack, pore, undercut at the edge, lack of fusion at the side wall, incompletely penetrated root and excessive reinforcement
Crack, pore, undercut, lack of fusion, root defect, excess weld metal – some can be seen, others lie inside. Graphic: Omega Mounting

Welding defects can be told apart by where they lie.

Visual testing finds cracks, notches and excess weld metal. It does not find lack of fusion and internal pores.

Dye penetrant testing

Technical drawing of dye penetrant testing in four steps: clean the surface, apply penetrant, wipe off excess, developer draws the penetrant out of the crack
Clean, penetrant, intermediate cleaning, developer – the crack shows as a coloured line. Graphic: Omega Mounting

Dye penetrant testing makes fine surface cracks visible – on steel, stainless steel and aluminium.

The method is simple, needs little equipment and is well suited to use on site. But it only finds defects that are open to the surface. Paint, rust or scale must be removed completely beforehand, otherwise the crack stays closed.

Magnetic particle testing

Technical drawing of a yoke magnet on a steel component with field lines leaking out at a crack and magnetic powder collecting at the crack
The yoke magnet creates a field that leaks out at the crack – and the powder collects exactly there. Graphic: Omega Mounting

On magnetisable steel, magnetic particle testing finds cracks at and just below the surface.

The method is more sensitive than penetrant testing and also finds cracks closed by paint or dirt. It does not work on stainless steel and aluminium.

Ultrasonic and radiographic testing

Technical drawing of ultrasonic testing with an angle probe on the plate next to the weld, sound path, reflection at an internal defect and echo on the screen of the instrument
Ultrasound finds internal defects: the sound is reflected at the defect and appears as an echo on the instrument. Graphic: Omega Mounting

Only methods that see through the material find defects inside the weld.

Both methods belong in the hands of certified inspectors. Who may carry out which inspection on installations is explained in our article on the competent person.

Planning and documenting inspection

Which weld is inspected and how is ideally decided before welding. For installation this means:

Qualified inspectors carry out the testing itself. Installation makes sure they can test and repairs any findings. After a repair the same spot is inspected again – only then is the weld complete.

What we pay attention to

Testing starts with welding, not afterwards.

Where we use it

At a loading dock, during the statutory inspection the inspector had rejected the welds – no sticker, door closed. We ground out the defective welds and re-welded them so that the dock could be released again at the follow-up inspection. How a defect is rectified before the follow-up inspection is described in our guide Rectifying UVV defects.

On the tubular shaft of a cable drum at an inland port on the Main cracks had formed due to incorrect slinging. We ground them out completely and rebuilt the shaft with repair pieces.

Do you have questions about how this works on your site?

Has your installation been given a defect on its welds at inspection? We grind out, re-weld and prepare for the follow-up inspection. Request a callback.

Our service for this: Custom fabrication and welding →

Free, no-obligation callback

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The Technology explained articles cover the equipment and techniques his team uses every day: what counts on site is in them – what only appears in the brochure is not.

EnglishEnglish