Thread types: metric, inch, pipe, trapezoidal – how to recognise them

By Tobias Schott  ·  Reading time approx. 8 minutes  ·  As of: November 2026

Heavy-duty hydraulic elbow fitting for the line conversion on the test rig
A hydraulic elbow fitting before the line is modified: whether connection and counterpart fit together is decided by the thread type – not by eye.

A thread is more than a groove on the bolt: profile, flank angle and pitch decide whether it holds, seals or moves – and whether two parts fit together at all.

You encounter thread types wherever something is screwed, adjusted or connected: on flanges and brackets, on hydraulic lines, on the spindle of a lifting table or vice. The thread type usually only gets noticed when a spare part does not fit or a fitting leaks after tightening.

Here we explain the thread as a system: families, profile shapes and designations. How to drill and tap a thread is covered in our guide.

What is a thread, and what distinguishes the thread types?

A thread is a profiled groove that runs helically around a cylinder or cone; thread types are its standardised versions, which differ in profile shape, flank angle, pitch and system of measurement. The external thread sits on the outside of the bolt, the internal thread in the nut or bore.

The flank is the inclined side face of the profile. The flank angle is the angle that two neighbouring flanks form with each other. The lead is the distance the nut travels along the axis in one full revolution. In German the thread is called Gewinde and the distance from one thread to the next Teilung (pitch).

Key facts

Bolted flange connection of the stainless steel pipework at the silencer
Bolted flange on stainless steel piping: this is where the fastening thread works – it is meant to clamp and hold, not to move.

Fastening thread or motion thread: why does one hold and the other slide?

The fastening thread holds because its friction is greater than the force with which the load wants to turn the nut back; the motion thread is designed for low friction and force in the axial direction.

A thread is basically an inclined plane wound around a cylinder. If the plane is shallow and friction is high, the load does not slide back by itself. This is called self-locking: the nut stays put even when the bolt is under tension.

Technical drawing: a thread unrolled as a ramp with circumference and lead, a block on a shallow plane stays put, a block on a steep plane slides back
A thread is an inclined plane wound up: shallow and with friction it holds – steep and smooth, the load slides back. Graphic: Omega Mounting

The V-thread reinforces this effect. Its flank angle acts like a wedge, the flanks press against each other at an angle, and friction rises. That is why almost all fastening bolts have V-threads with a small pitch.

Motion threads want the opposite. Their flank angle is smaller, the wedge effect lower – more force goes into the axis, less into friction. Often the lead is larger too.

A single-start trapezoidal thread is usually still self-locking – the spindle of a vice stays put when you let go of the handle. Multi-start spindles and ball screws are usually not. They need a brake or clamp if the load must not run back.

Important: self-locking protects against turning back under steady load, not against vibration. Transverse movements can loosen even a self-locking joint – that is what bolt locking is for.

What thread profiles are there?

Explanatory graphic: thread types – V-thread, trapezoidal thread, buttress thread and round thread compared by flank angle and typical use
Four profiles, four tasks: the V-thread clamps, trapezoidal and buttress threads move under load, the round thread tolerates dirt. Graphic: Omega Mounting

There are four basic profiles – V, trapezoidal, buttress and round thread – and each is shaped for a specific task.

Thread typeProfile and flank angleFeaturesTypical use
Metric ISO threadV, 60 degrees.M, dimensions in millimetres.Bolts, nuts, tapped holes.
Unified inch threadV, 60 degrees.Inch dimensions, threads per inch, symbol UNC or UNF.Machines and components from North America.
Whitworth threadV, 55 degrees, rounded.BSW or BSF, inch dimensions.Older machines of British design.
Pipe threadWhitworth profile, parallel or tapered.G, R, Rp, Rc; American NPT with 60 degrees.Pipelines, valves and fittings, hydraulic and pneumatic connections.
Trapezoidal threadTrapezoidal, 30 degrees.Tr, diameter times lead.Spindles of lifting tables, gate valves and vices.
Buttress threadAsymmetric, 3 and 30 degrees.S, diameter times lead.Screw presses and clamping devices with load in one direction.
Round threadRounded, 30 degrees.Rd.Couplings, screw connections in food processing.
Ball screwBall grooves with circulating balls.Spindle and nut as one unit.Linear axes, machine tools, precise actuators.

The devil is in the detail: a Whitworth and a Unified thread of similar size can often be screwed into each other a few turns. Then it jams, and both threads are damaged.

Omega Mounting service vehicles before the job on the test rig conversion
Hydraulic fitting with sealing cone: the thread provides the clamping force, the joint seals at the cone.

Pipe threads: where is the seal – in the thread or in front of it?

That depends on the shape: a tapered pipe thread seals in the thread itself, a parallel one does not – there a ring, a sealing face or a sealing cone seals.

On a tapered thread the flanks wedge when screwed in. Together with a sealant in the thread, the joint becomes tight. The parallel pipe thread with the symbol G, on the other hand, only holds the parts together; sealing takes place at a separate point.

This is the rule for hydraulic fittings: the thread provides the clamping force, the seal is made at the cone or sealing ring. Sealing tape in the thread does not seal anything here, but can leave residues at the sealing point.

Parallel and tapered pipe threads look confusingly alike. How to reliably distinguish G, R and NPT is covered in our guide Tapping and drilling threads.

Technical drawing: tapered pipe thread in section with sealant in the thread flanks and parallel pipe thread with sealing ring on the flat face in front of the thread
Tapered threads seal in the thread, parallel threads at a separate sealing point – there the thread only holds the parts together. Graphic: Omega Mounting

Reading thread designations: what do M10, M10x1.25 and Tr 20x8 P4 mean?

A thread designation gives, in a fixed order, the symbol of the thread type, the nominal diameter and – where necessary – pitch, number of starts and direction of rotation.

On single-start threads, lead and pitch are equal. Multi-start threads have two or more threads running in parallel. The pitch is then the distance to the neighbouring thread, the lead the distance per revolution: pitch times number of starts. In German the pitch is called Teilung and the lead Steigung.

You recognise multi-start threads by several thread starts at the end face. They give a lot of travel per revolution, but lock less.

Technical drawing: single-start and two-start thread in side view with pitch and lead, next to it the end face with one and two thread starts
On a single-start thread pitch and lead are equal, on a two-start thread the lead is twice as large – recognisable by two thread starts. Graphic: Omega Mounting

What we pay attention to

Threads decide whether an installation holds cleanly or causes trouble later – that is why our rule is:

Technical drawing of Thread types with numbered check points: Identify, Never force it, Support the load, Know the seal, Spindle and nut
Measure, never force, support the load, know the seal, spindle and nut as a pair. Graphic: Omega Mounting

Where we use it

We encounter threads in almost every installation in existing buildings, whether in the Rhine-Main region or beyond. During the conversion of a vehicle test stand with a new oil pan we adapted the hydraulic lines to the new configuration; elbow fittings connect them pressure-tight, the pan segments are fixed to the concrete foundation with anchors and bolts. During the installation of turbo silencers in a data center in Offenbach 12 silencers were lifted onto frames, aligned and bolted firmly, the stainless steel piping hangs on bolted flanges. What we install in operating buildings is described on our page Industrial installation.

Do you have questions about how this works on your site?

Property classes of bolts: why 12.9 is not always better – what the numbers on the bolt head reveal about material and load capacity. Bolt locking: what holds – and why the spring washer is obsolete – why self-locking alone is not enough against vibration.

Do you have questions about how this works on your system – which thread is on the spindle or why the fitting leaks after tightening? The quickest way is a callback – briefly describe the system, the component and your time window.

Free, no-obligation callback

Tobias Schott, managing director of Omega Mounting GmbH, on a construction site in front of scaffolding

About the author

Tobias Schott

Managing director of Omega Mounting GmbH, Rodgau · more than 20 years of hands-on experience in installation and maintenance

A trained mechatronics technician, working in maintenance, servicing and industrial installation since 2004 – first alongside his father, and with Omega Mounting since 2012: from overhead conveyors in Frankfurt to the crane system in a new-build hall. He plans and leads lifting operations as an appointed person (AP) in data centers and on industrial sites in the Rhine-Main region, trains and examines operators of cranes, mobile elevating work platforms and telehandlers, and is a qualified occupational safety specialist. On jobs abroad he is known as the “German Troubleshooter” – the person you call when a site gets stuck. He learned what quality means from his father, not from a manual: Made in Germany as a standard for his own work, not a label. That is why quality comes first at Omega Mounting – ahead of speed and price. The Technology explained articles cover the equipment and techniques his team uses every day: what counts on site is in them – what only appears in the brochure is not.

EnglishEnglish